Loading...
Duke Lesley 3C-CS090312 Page 1 of 2 Ken Griffin - Re: Point West / AHMS From:   Michael Garza To:   Kirk Klatt Date:   3/12/2009 2:20 PM Subject:   Re: Point West / AHMS CC:   Gary Sieb;  Ken Griffin Attachments:   construction permit.pdf   Kirk, We have received the plans from Jack Evans, you may go ahead and install your erosion control. I will review the plans in the next day or 2, and Larry Davis, the inspector will call to set up a pre-construction meeting for sometime next week. Attached is the construction permit application in which inspection fees will need to be paid.    If you have any questions you may contact me at your convenience.   thank you,   Michael Garza Engineering Dept. City of Coppell Office: 972-304-7019 Fax:  972-304-3570    Please consider the environment before printing this e-mail >>> On 3/11/2009 at 9:57 AM, in message <457B63ABD04A0B4281A58EFD3D2FB7CB14ADBF2CFF@INCORPSERV307.dukerealty.com>, Kirk Klatt <Kirk.Klatt@dukerealty.com> wrote: Gary/Ken,   I had a few questions and was not sure who would be appropriate.  In late December, Clay Phillips provided Duke with a hold harmless option for the construction of a parking lot expansion and its associated utilities at Point West I.  I believe you were both copied on that letter.  City Council approved the rezoning and plat associated with these changes last night.  Jack Evans of Pacheco Koch also submitted plans for engineering review yesterday as well.  My question is in regards to construction and the actions Duke needs to perform to satisfy the City considering we have no official Engineering sign off at this time.  If we do begin construction prior to an official approval, who needs to be notified?  There are some public drainage improvements involved.  Would there be any type of 3-way contract we need to put in place?  Also, do we need to get any type of permit for these site improvements?   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\49B91A22City...12/22/2009 Page 2 of 2 I really do appreciate the help.  We understand that we are running a risk of beginning prior to the Eng. Dept’s, but time constraints are requiring it.  However, we do want to make sure we stay on the correct path during this accelerated process.  Thanks again,   Kirk Klatt, P.E. Development Services Manager Duke Realty Corporation 14241 N. Dallas Parkway, Suite 1000 Dallas, TX 75254 (972) 361.6766 (direct) (972) 361. 6800 (fax)   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\49B91A22City...12/22/2009