Loading...
ST8601-CS 901116CARTER & BURGESS, INC. ENGINEERS' PLANNERS · SURVEYORS November 16, 1990 Shohre Daneshmand City of Coppell P.O. Box 478 Coppeli, Texas 75019 Re: MacArthur Blvd. at Denton Creek Dear Shohre: Construction of the MaeArthur Blvd. bridge across Denton Creek has required that streamflow in this section of the creek be temporarily diverted to the flood control channel. This diversion was required so that the concrete slope paving and storm drainage under the bridge could be placed in a dry streambed. This concrete work has recently been completed. We anticipate that earth and sandbag diversion dikes will be removed within a few days so that the streamflow in Denton Creek will return to its pre-construction condition. If you have additional questions concerning this matter, please call. Sincerely, CARTER & BURGESS, INC. Phil Deaton, P.E. Associate Principal PD/db;220101.L14 220101.L14 7950 ELMBROOK DRIVE / SUITE 250 / DALLAS, TEXAS 75247 / 1214) 638-0145 DALLAS-FORT WORTH-HOUSTON,TEXAS FORT MYERS. FI~ORIDA