Loading...
Manara-CS090521 (2) (12/23/2009) Ken Griffin - Re: ManeraPage 1 From: Keith Marvin To: Ken Griffin Date: 5/21/2009 8:38 PM Subject: Re: Manera What it should take vs. What I think it will take is two different things. I told him 6-9 months to make sure it would be done within the time frame I gave him. Realistically with new water and sewer, it should be done in less than 6 months. -----Original Message----- From: Ken Griffin To: Keith Marvin <KMARVIN@ci.coppell.tx.us> Sent: 5/21/2009 8:29:39 PM Subject: Manera They are saying we told them Heartz will take 6-9 months. Heartz by itself should take only 2-3 months. Any utility work should be done without reducing the two way traffic. What's your thoughts on how long the street should take?