MA FY08/09-CS091218T H E C I T Y O F
COPPELL P.O.Box019
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3679
T a
Fax: (972)304-3570
F q
ENGINEERING DEPARTMENT
FAX COVER SHEET
To: �
J t MKy S-PAP, lcs S ( /AeMQ. - kCl 7 M"V1&1 P �
F ax : .51 3 ! 4 - 3 (.(e Date: 1 t � �
Phone: � L� Pages: �„ (including cover sheet)
Re: Pf.Oc �� L CC:
❑ Urgent ❑For Review ❑ Please Comment ❑ Please Reply 61A Requested
•Comments:
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 - 3679
"City of Coppell Engineering - Excellence By Design"
T H Z • C I T Y • 0 F
CPPELL
Majed Khalaf
Procon Paving and Construction, Inc.
10301 Bickliam Road
Dallas, TX 75220
RE: Annual Street and Alley Repair Contract
Notice of Contract Termination
Dear Mr. Khalaf
-
December 17, 2009
VIA CERTIFIED MAIL
This letter is your notice that the Contract that your company is currently working on in the City of
Coppell is hereby terminated. This termination is in compliance with Article XIII Section 12.2 of the
contract between Procon Paving and the City of Coppell.
You were notified in writing prior to this date that work performed has not met our specifications nor
has it met the expectations of the City's residents. Your contract is terminated as of Jan. 1, 2010 due
to the following reasons:
• Not completing contract work in the specified time frame
• Numerous complaints of damage to property
• Being unresponsive to citizens' complaints
• Not maintaining worksites in a safe manner
• Leaving large areas of concrete open for excessive lengths of time
• Not paying suppliers/vendors in a timely manner
As of the date you receive this letter, do not prepare any more areas for replacement. Areas currently
underway must be completed before January 1, 2010 and unresolved complaints must be resolved to
the customers' satisfaction. In addition, your suppliers' invoices must be paid. You will turn in a final
invoice to this office for all completed work by January 15, 2010. Your final invoice should include
documentation indicating that all outstanding complaints have been addressed, and that all suppliers
and subcontractors have been paid. Please contact me you have any questions.
Sincerely,
Keith Marvin, P.E.
Project Engineer
Phone: 972-304-3681
Fax: 972-304-3570
cc: Ken Griffin, P.E., Director of Engineering/Public Works
Jerod Anderson, Purchasing Agent
255 PARKWAY * P.O.BOX 9476 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
TRANSMISSION VERIFICATION REPORT
TIME 12/18/2009 16:28
NAME
FAX
TEL
SER.# BROF7J659084
DATE,TIME
12/18 16:27
FAX N0. /NAME
915123143661
DURATION
00 :00 :38
PAGE(S)
02
RESULT
OK
MODE
STANDARD
ECM