Loading...
SS9901A-CS020424APR -24 -2002 14:23 CENTEX CONSTRUCTION - DAL 972 233 2911 P.01i05 CENT CONSTRUCTION COMPANY Our vision: To be the Standard of Measure in the Markets we serve. Date: To: ZL= From: V U V-1f - --- -- Project: St. Josepl& illage Subject: e Telecopy (FAX) No: 7a7- - ?9/'/7/x' �'`e �T� - 30- 70 Hard Copy to Follow No Remarks Z / 09k If you Do Not Receive pages (including this one), Please call Sender at Operator sending FAX message from FAX # APR -24 -2002 14:23 CENTEX CONSTRUCTION — DAL 972 233 2911 P.02i05 By:. ORION REALTY ADVISORS, INC,; 9722411214; uea -ec - ui [�,yt nn1t Install 30" Sanitary Sewer Force Main Exhibit D Scope of Work: Install a 1,990 If 30" dudle Iron pipe sanitary force main in accordance with Glty of Cnppell plans prepared by Turner, Collie & Braden November, 2001 designated as the DeForest 30" Force Main -Line A (12 Sheets t> � (0. - Soo - 2 oO U I-0 S � 4-- l�, �o Sv •z o ,� 7 ?� Its- l 13 1 Z 3 8fl � des �o Goppell•Utillty Force M?Jn,X15 12/20/01 page Iof1 I� � 15 3 i-j !) '.?nI S AT 0 4-d5 rTr. -Py No 51001 Desrribtion [�,yt nn1t Unit price Line Total 30" CLSI - D.I. Plpe S' S' Cut 834 it $ 83,50 $ 69,639 � 85,64 30" CL51 - d.1. Pipe 8' - 10' Cut 936 if $ 91.50 3 $ 14,000 ✓ 30" CL51 - D.I. Pipe io' - 1s' cut 100 If $ 140 33.0001 Bare 30" sewer 120 If $ 275.00 $ 9,800 Air Releas®' Valves 4 ea 12 $ 2,450.00 5 4,775.00 $ $ 57,3001" Bends 30 Plugs ea 2 ea $ 2,100,00 S 4,200✓ 2,985' Trench Safety 1990 If $ 1.60 5 2,985' Testing 1990 if $ 1.50 $ surveying 1 Is $ 4,000 subtotal $ 293,553 Subcontractor Payment and Performance Bond $ 8,000 subtotal $ 289,553 General Conditions 5 &,000 subtotal $ 297.553 Casualty Insurance 0.7908% S 2,353 builder's Risk InsurVice 0.07% 5 208 subtotal $ 300,114 Centex Payment and Performance Bond 0.0% $ - subtotal $ 300,114 General Contractor's Fee 4.0% 5 12,005 Total $ 312,119 t> � (0. - Soo - 2 oO U I-0 S � 4-- l�, �o Sv •z o ,� 7 ?� Its- l 13 1 Z 3 8fl � des �o Goppell•Utillty Force M?Jn,X15 12/20/01 page Iof1 I� � 15 3 i-j !) '.?nI S AT 0 4-d5 rTr. -Py No 51001 Install 30" Sanitary Sewer Force Main Scope of Work: Revised per Install a 2,022 If Turner Collie 30" ductile iron Braden drawings pipe sanitary Cement Line date 316102 force main in pipe accordance with plans. Description Qty Unit Unit price Line Total 30" CL51 -D.I. Pipe 6'- 8' Cut 40 If $83.54 $3,340 30" CL51 -D.I. Pipe 8'- 10' Cut 1515 If $91.54 $138,623 30" CL51 -131 Pipe W- 15' Cut 467 If $140.04 $65,380 Bore 30" sewer 217 If $275.00 $59,675 Air Release Valves 3 ea $2,450.00 $7350 Bends 34" Plugs 14 ea $4,775.00 $66,850 Trench Safety 3 ea $2,104.00 $6,300 Testing 2022 If $1.50 $3,033 30" Gate Valve/Accessories 2022 if 1 $1.50 $3,433 Blind Flanges ea $26,840.00 $26,800 Surveying 3 ea $3,890.00 $11,670 1 Is $4,800 subtotal ---- 339"54 - Subcontractor Payment and Performance Bond $7 subtotal $404, M General Conditions $8,000 subtotal — 7gr Casualty Insurance 0.7908% $3,264 Builder's Risk Insurance 0.07% $289 subtotal — Centex Payment and Performance Bond 1.5% $0 subtotal General Contractor's Fee 4.0% $16,654 Total $432,99 Current Contract Amount Net Change Order 120,879 D 0 ru A i ry m Q N A ry co ry ry w w N lD N N U; 9 Install 30" Sanitary Sewer Force Main Scope of Work: Revised r Install a 2,022 If Turner Collie 30" ductile iron Braden drawings PP ipe sanitary fonce main in Epoxy Lined date 316102 accordance with plans. Description 30" CL51 -D.1, Pipe 6'- 8' Cut Qty Unit Unit price Line Total 30" CL51 -D.I, Pipe 8'- 10' Cut 44 If 1515 If $98.50 $108.50 $3,944 $164,378 30' CL51 -D.I. Pipe 10'- 15' Cut 467 If $157.00 $73,319 Bore 30" sewer 217 If $275.00 $59,675 Air Release Valves 3 ' ea $2,450.00 $7,354 Beads 30" Plugs 1✓ ea $6,200.00 $86,800 Trench Safety 3' ea $2,900.00 $8,700 Testing 2422 If $1.50 $3,033 30" Gate Valve /Accessories 2022 If $1,50 $3,033 Blind Flanges 1 ea $26,800.00 $26,800 Surveying 3 ea $4,240.00 $12,720 1 Is $4,800 subtotal - --$454;W-Subcontractor Payment and Performance Bond $9,091 subtotal !$4531W General Conditions $8,000 subtotal -- $471 - ,638 - Casualty Insurance 0.7908% $3,730 Builder's Risk Insurance 0.07% $330 subtotal — $475�xw Centex Payment and Performance Bond 1.5% $0 subtotal — 475698 - General Contractors Fee 4.0 a /a $19,028 Total Current Contract Amount , Net Change Order 182,607 I ISIS ¢0 4 Zo LZ U.o� rw�f �j2 �jpR� i � � 6 o m mc� D N A i N CD CD N A N 00 n M z M X n 0 z u� C n 0 z i d D r N N w w N IL.: CD CD