SS9901A-CS020424APR -24 -2002 14:23 CENTEX CONSTRUCTION - DAL 972 233 2911 P.01i05
CENT
CONSTRUCTION COMPANY
Our vision: To be the Standard of Measure in the Markets we serve.
Date:
To:
ZL=
From:
V U V-1f - --- --
Project:
St. Josepl& illage
Subject:
e
Telecopy (FAX) No: 7a7- - ?9/'/7/x' �'`e �T� - 30- 70
Hard Copy to Follow No
Remarks Z
/ 09k
If you Do Not Receive pages (including this one), Please call Sender at
Operator sending FAX message from FAX #
APR -24 -2002
14:23
CENTEX
CONSTRUCTION — DAL
972 233 2911
P.02i05
By:. ORION REALTY
ADVISORS,
INC,;
9722411214;
uea -ec - ui
[�,yt nn1t
Install 30" Sanitary Sewer Force Main Exhibit D
Scope of Work: Install a 1,990 If 30" dudle Iron pipe sanitary force main in accordance with Glty of Cnppell plans
prepared by Turner, Collie & Braden November, 2001 designated as the DeForest 30" Force Main -Line A (12 Sheets
t>
� (0. - Soo - 2 oO
U I-0
S � 4-- l�, �o Sv •z o ,� 7 ?�
Its- l
13 1 Z 3 8fl � des
�o
Goppell•Utillty Force M?Jn,X15
12/20/01
page Iof1
I� �
15 3
i-j !) '.?nI S AT 0 4-d5 rTr. -Py No 51001
Desrribtion
[�,yt nn1t
Unit price
Line Total
30" CLSI - D.I. Plpe S' S' Cut
834 it
$ 83,50
$
69,639 �
85,64
30" CL51 - d.1. Pipe 8' - 10' Cut
936 if
$ 91.50
3
$
14,000 ✓
30" CL51 - D.I. Pipe io' - 1s' cut
100 If
$ 140
33.0001
Bare 30" sewer
120 If
$ 275.00
$
9,800
Air Releas®' Valves
4 ea
12
$ 2,450.00
5 4,775.00
$
$
57,3001"
Bends
30 Plugs
ea
2 ea
$ 2,100,00
S
4,200✓
2,985'
Trench Safety
1990 If
$ 1.60
5
2,985'
Testing
1990 if
$ 1.50
$
surveying
1 Is
$
4,000
subtotal
$
293,553
Subcontractor Payment and Performance Bond
$
8,000
subtotal
$
289,553
General Conditions
5
&,000
subtotal
$
297.553
Casualty Insurance
0.7908%
S
2,353
builder's Risk InsurVice
0.07%
5
208
subtotal
$
300,114
Centex Payment and Performance Bond
0.0%
$
-
subtotal
$
300,114
General Contractor's Fee
4.0%
5
12,005
Total
$
312,119
t>
� (0. - Soo - 2 oO
U I-0
S � 4-- l�, �o Sv •z o ,� 7 ?�
Its- l
13 1 Z 3 8fl � des
�o
Goppell•Utillty Force M?Jn,X15
12/20/01
page Iof1
I� �
15 3
i-j !) '.?nI S AT 0 4-d5 rTr. -Py No 51001
Install 30" Sanitary Sewer Force Main
Scope of Work: Revised per
Install a 2,022 If Turner Collie
30" ductile iron Braden drawings
pipe sanitary Cement Line date 316102
force main in pipe
accordance with
plans.
Description
Qty Unit
Unit price
Line Total
30" CL51 -D.I. Pipe 6'- 8' Cut
40 If
$83.54
$3,340
30" CL51 -D.I. Pipe 8'- 10' Cut
1515 If
$91.54
$138,623
30" CL51 -131 Pipe W- 15' Cut
467 If
$140.04
$65,380
Bore 30" sewer
217 If
$275.00
$59,675
Air Release Valves
3 ea
$2,450.00
$7350
Bends
34" Plugs
14 ea
$4,775.00
$66,850
Trench Safety
3 ea
$2,104.00
$6,300
Testing
2022 If
$1.50
$3,033
30" Gate Valve/Accessories
2022 if
1
$1.50
$3,433
Blind Flanges
ea
$26,840.00
$26,800
Surveying
3 ea
$3,890.00
$11,670
1 Is
$4,800
subtotal
---- 339"54 -
Subcontractor Payment and Performance Bond
$7
subtotal
$404, M
General Conditions
$8,000
subtotal
— 7gr
Casualty Insurance
0.7908%
$3,264
Builder's Risk Insurance
0.07%
$289
subtotal
—
Centex Payment and Performance Bond
1.5%
$0
subtotal
General Contractor's Fee
4.0%
$16,654
Total
$432,99
Current Contract Amount
Net Change Order
120,879
D
0
ru
A
i
ry
m
Q
N
A
ry
co
ry
ry
w
w
N
lD
N
N
U;
9
Install 30" Sanitary Sewer Force Main
Scope of Work:
Revised r
Install a 2,022 If
Turner Collie
30" ductile iron
Braden drawings
PP ipe sanitary
fonce main in Epoxy Lined
date 316102
accordance with
plans.
Description
30" CL51 -D.1, Pipe 6'- 8' Cut
Qty Unit
Unit price
Line Total
30" CL51 -D.I, Pipe 8'- 10' Cut
44 If
1515 If
$98.50
$108.50
$3,944
$164,378
30' CL51 -D.I. Pipe 10'- 15' Cut
467 If
$157.00
$73,319
Bore 30" sewer
217 If
$275.00
$59,675
Air Release Valves
3 ' ea
$2,450.00
$7,354
Beads
30" Plugs
1✓ ea
$6,200.00
$86,800
Trench Safety
3' ea
$2,900.00
$8,700
Testing
2422 If
$1.50
$3,033
30" Gate Valve /Accessories
2022 If
$1,50
$3,033
Blind Flanges
1 ea
$26,800.00
$26,800
Surveying
3 ea
$4,240.00
$12,720
1 Is
$4,800
subtotal
-
--$454;W-Subcontractor Payment and Performance Bond
$9,091
subtotal
!$4531W
General Conditions
$8,000
subtotal
-- $471 - ,638 -
Casualty Insurance
0.7908%
$3,730
Builder's Risk Insurance
0.07%
$330
subtotal
— $475�xw
Centex Payment and Performance Bond
1.5%
$0
subtotal
— 475698 -
General Contractors Fee
4.0 a /a
$19,028
Total
Current Contract Amount
,
Net Change Order
182,607
I
ISIS
¢0
4
Zo LZ U.o� rw�f
�j2 �jpR� i
�
� 6 o m mc�
D
N
A
i
N
CD
CD
N
A
N
00
n
M
z
M
X
n
0
z
u�
C
n
0
z
i
d
D
r
N
N
w
w
N
IL.:
CD
CD