Loading...
SS9901A-PR021106St. Joseph Village / City Work Pricing of Additional Scope of Work Credit for Force Main Fitting Installation C -Con 15,504 Subcontractor Payment & Performance Bond 310 General Conditions 0 Casualty Insurance 128 Builder's Risk Insurance 11 General Contractor's Fee 638 TOTAL 16,591 Add Soils Testing HBC Engineering 2,200 Subcontractor Payment & Performance Bond 0 General Conditions 0 Casualty Insurance 0 Builder's Risk Insurance 0 General Contractor's Fee 0 TOTAL 2,200 Reduce Star Leaf Road width Cooper (795 SY @ $3.00/ SY) (2,652 TAS (19,883 Asphalt 430 sf @ $2.17/sf (933 Subcontractor Payment & Performance Bond (53 General Conditions 0 Casualty Insurance (22 Builder's Risk Insurance (2) General Contractor's Fee (942) TOTAL 24,487 City Portion 50% (12,243 Add 12" water valve C -Con 2,200 Subcontractor Payment & Performance Bond 44 General Conditions 0 Casualty Insurance 18 Builder's Risk Insurance 2 P�ELContractor's Fee 91 TOTAL 2,354 Add RCP under Star Leaf @ West P.L. Area Excavation 43,000 Credit Original Storm Water 6,716 Subtotal 36,284 Subcontractor Payment & Performance Bond 726 General Conditions 0 Casualty Insurance 299 Builder's Risk Insurance 26 General Contractor's Fee 1,493 TOTAL 38,828 Add for paving machine - City's Portion TAS 26,471 Subcontractor Payment & Performance Bond 529 General Conditions 0 Casualty Insurance 218 Builder's Risk Insurance 19 General Contractor's Fee 1,090 TOTAL 28,327 City Portion 20% 5,665 Delete Sidewalk on South /East side of Star Leaf Road TAS 4,311 Subcontractor Payment & Performance Bond 86 General Conditions 0 Casualty Insurance 35 Builder's Risk Insurance 3 General Contractor's Fee 177 City's Portion TOTAL 4,613 VC1,0 11,6•?.