St Joseph-PR020912St. Joseph Village
Utility Package Adjustment
Force Main Revisions
1. Soils Testing Density
2. Add Video of Force Main Pipe
Water Line - Additional scope of work at City Request
1. Add 12" Gate Valve in Water Line along Star Leaf Road
Resolution of final scope of work vs Bid Package Scope of Wor
1. Utility Comparison from Assumption, to Approved City Documents
2. Addition of 2 ea., 2" Irrigation Meters, (Not in scope of work)
3. Add Fittings (3 ea 12" 45 degree bends at 24" Water tie in @ SLR to adjust to vault grade
4. Add Fittings (4 ea 12" 45 degree bends to go under existing sanitary force main.)
5. Add RCP or Culvert under Star Leaf Road @ West Property Line or Wye Inlet N. of road ? ? ? ??
Net Change $1,050.00 +
09/12/2002
? ? ? ??
? ? ? ??
$ 2,200
($2,200.00)
$450.00
$1,200.00
$1,600.00