Loading...
ST0003-CS071022 Page 1 of 1 Ken Griffin - RE: S. Coppell Rd. From:   "Leach's" <leachs4@verizon.net> To:   "'Leach's'" <leachs4@verizon.net>, <kgriffin@ci.coppell.tx.us> Date:   10/22/2007 12:15 PM Subject:   RE: S. Coppell Rd.   I originally sent this message in June and got a return message that you were on vacation.  Has there been any more design plans drawn or any details you can share with me on the progress of S. Coppell Rd?   Thanks.  JoAnn Leach   From: Leach's [mailto:leachs4@verizon.net] Sent: Friday, June 08, 2007 10:08 AM To: 'kgriffin@ci.coppell.tx.us' Subject: S. Coppell Rd.   Ken,   We live at 408 S. Coppell Rd., (between Kaye and Plantation).  We have put off having a circular drive installed in part due to the many delays in the reconstruction and also due to the elevation change proposed in the reconstruction of Coppell Rd.  We now have a son who is about to turn 16 and for safety reasons we now want to push ahead with our plans.  To put in a circular drive over the drainage ditch is cost prohibitive.   I noticed in the newspaper recently that a new design firm had been hired, the way it read was for the other half of Coppell Rd and Bethel, but not sure if our end will be affected.  I am wondering if you can give me any details on the elevation proposed, timetable of when we will be able to see the plans and when construction is now due to begin on our section of Coppell Rd. Will the Bethel Rd./Coppell Rd portion be completed before construction begins on the north part of S. Coppell Rd.?   Any help you can provide would be appreciated.  Thanks.    JoAnn Leach 408 S. Coppell Rd. Coppell, TX  75019 972-393-7234 leachs4@verizon.net   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\471C945CCity...12/31/2009