Ken Griffin - RE: S. Coppell Rd.
From: "Leach's" <leachs4@verizon.net>
To: "'Leach's'" <leachs4@verizon.net>, <kgriffin@ci.coppell.tx.us>
Date: 10/22/2007 12:15 PM
Subject: RE: S. Coppell Rd.
I originally sent this message in June and got a return message that you were on vacation. Has there been any
more design plans drawn or any details you can share with me on the progress of S. Coppell Rd?
Thanks. JoAnn Leach
From: Leach's [mailto:leachs4@verizon.net]
Sent: Friday, June 08, 2007 10:08 AM
To: 'kgriffin@ci.coppell.tx.us'
Subject: S. Coppell Rd.
Ken,
We live at 408 S. Coppell Rd., (between Kaye and Plantation). We have put off having a circular drive installed in
part due to the many delays in the reconstruction and also due to the elevation change proposed in the
reconstruction of Coppell Rd. We now have a son who is about to turn 16 and for safety reasons we now want to
push ahead with our plans. To put in a circular drive over the drainage ditch is cost prohibitive.
I noticed in the newspaper recently that a new design firm had been hired, the way it read was for the other half of
Coppell Rd and Bethel, but not sure if our end will be affected. I am wondering if you can give me any details on
the elevation proposed, timetable of when we will be able to see the plans and when construction is now due to
begin on our section of Coppell Rd. Will the Bethel Rd./Coppell Rd portion be completed before construction
begins on the north part of S. Coppell Rd.?
Any help you can provide would be appreciated. Thanks.
JoAnn Leach
408 S. Coppell Rd.
Coppell, TX 75019
972-393-7234
leachs4@verizon.net