Loading...
ST0003-CS080307 Page 1 of 1 Ken Griffin - Re: Fwd: Bid No. Q-0108-01 Coppell Rd. from Cooper Lane to Sandy Lake Rd. From:   Jennifer Miller To:   Chad Beach;  Jim Witt;  Keith Marvin;  Ken Griffin Date:   3/7/2008 9:06 AM Subject:   Re: Fwd: Bid No. Q-0108-01 Coppell Rd. from Cooper Lane to Sandy Lake Rd.   The 2006 Bond issue shows 2.4 million for Coppell Road.  Jen >>> Ken Griffin 3/7/2008 9:04 AM >>> I think we have 2,400,000 set aside for this project.  I'll verify the amount Monday. Ken g  -----Original Message----- From: Jim Witt Cc: Clay Phillips <CPHILLIP@ci.coppell.tx.us> To: Jennifer Miller <JMILLER@ci.coppell.tx.us> To: Ken Griffin <KGRIFFIN@ci.coppell.tx.us> Sent: 3/7/2008 8:13:06 AM Subject: Fwd: Bid No. Q-0108-01 Coppell Rd. from Cooper Lane to Sandy Lake Rd. So where do we get the extra cash? file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\47D10596City_...12/31/2009