Loading...
ST8701-CS 910520 (2)DAN M. DOWDEY & ASSOCIATES CIVIL ENGINEERS ~ 16250 DALES PARKWAY SUITE ~00 DALES, TEXAS 75248 ~*~ May 20, 1991 ~o, ~o. (214) 931-0694 Ms. Shohre Daneshmand TO City of Coppel 1 255 Parkway Boulevard Coppe11, Texas 75019 WI ~[ SliDInG YO~ ~ ~ttach~ ~ Hnder soparate cover via the following items: ~ Shop drawings D ~rints ~ ~lans ~ Samples ~ Specifications ~ Copy of letter ~ Change order COPIES DATE NO. DESCRIPTION 5/20/91 Letters to Residents of Lodae Road and aaencies. THESE ARE TRANSMITTED as checked below: [] For approval [] Approved as submitted [] Resubmit__copies for approval [] For your use [] Approved as noted [] Submit.__copies for distribution [] As requested [] Returned for corrections [] Return__corrected prints [] For review and comment j~ For your records. [] FOR BIDS DUE 19__ [] PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGN ED: PRODUCTZ40-2 ~1~., G.~0., ia~ 01471 If enclosures are not as noted, kindly notify us at once. D;~''' M. DOWDEY AND ASSOCIATES, CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS. TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Resident: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Very truly yours, William A. Anderson, P. E. WAA :hc Encl. s~ ~ L~VEN( YP~ ~ ~ ~ ~EN~LE ROAD ~ ~ 4 ~ ~ ~ ~ ~ LZ ~GLe _ ls~rm ~~~ LODGE ROAD ~~ 9ET*~L FOR STREET CLOSURF ?'.; JUNE ~,~ TO AUGUST 3~,~,~ DAI I. DOWDEY AND ASSOCIATES, ~'~. CIVIL ENGINEERS 1{~250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Coppell School District Administration Building 1201 Wrangler Drive Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl. DA~ '"" 4. DOWDEY AND ASSOCIATES, ~'~. CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1 991 Mr. Larry Davis City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Larry: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June .1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl. DA'"-' 4. DOWDEY AND ASSOCIATES, CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Ms. Shohre Daneshmand City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Shohre: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours~ William A. Anderson, P. E. WAA:hc Encl. DA'--,1. DOWDEY AND ASSOCIATES, CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 - Citizens Advocate P. O. Box 557 Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl. DA ~1. DOWDEY AND ASSOCIATES, CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Paragon Cable 408 Bethel Road Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, Po E. WAA:hc Encl. DAt~ I. DOWDEY AND ASSOCIATES, !~'"'~. CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75'~48 (214) 931-0~94 FAX (214) 931-9,5~38 May 20, 1991 Coppell Gazette 580 South Denton Tap Road Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl. DA ~. DOWDEY AND ASSOCIATES, CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 7,5248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Coppell Police Department 255 Parkway Boulevard Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl. DOWDEY AND ASSOCIATES, CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Coppell Fire Department 606 South Coppell Road Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl. DA MM. DOWDEY AND ASSOCIATES, '"'"~C. CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Texas Waste Management P. O. Box 719 Lewisville, Texas 75067 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl. D,~"- M. DOWDEY AND ASSOCIATES,-~C. CIVIL ENGINEERS 162.50 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 May 20, 1991 Postmaster General United States Post Office 450 South Denton Tap Road Coppell, Texas 75019 Re: Lodge Road Street Closure North of Sandy Lake Road Coppell, Texas Dear Sir: We are in the process of completing the construction plans for Lodge Road between Sandy Lake Road and the recently completed subdivision named Pecan Hollow Addition. Based on the restricted working area and associated hazards due to construction equipment, we will need to close the above referenced section of roadway for approximately 3 months beginning June 1, 1991. Weather permitting, the roadway may be open to the public sooner than scheduled. Attached is an exhibit which shows the section of roadway and related detour patterns. Please post this notice for employees which will be affected. We have coordinated this closure with the attached agencies. Please contact me if you have any adverse concerns or special accommodations which need to be addressed. Please respond by May 25, 1991. Very truly yours, William A. Anderson, P. E. WAA:hc Encl.