WA9402-CS 960429 214 721 2280
04/29/96 "' 13:07 CITY OF IRUING/I~R UTILITIES 001
'
Cit .
~rvi~
CITY OF IRVING
ENGINEERNG FIELD OFFICE
~ RO~
IRVING, TEX~
(114) 721 -~201
FAX COVER SHEET
DATE:4-29-96 TIME: .... cxq: 0 0 p,
/
TO: ~:~ r (c.t . Dau, g FAxNuMBER:
~'nOM: ~"~n,de? ~ ~pf~Ti . _,~ .
RE: Bore at Old Bethel Rd @ MacArthur
Total nm~r of ~ ~c~g coy~r k~r: ~
SPECIAL INSTRUCTIONS:
We are transmitting from an FAXWRITER 4000; fax number:
(214) 721-2280.
If you encounter problems receiving this transmission, please contact
Karen or Leslie at (214) 721-2201.
04/29/96 13:09 CITY OF IRUING/WATER UTILITIES 002
of Irving
OFFICE MEMO
TO: Rod Smithey, Engineering Inspections Supervisor
FROM: James Dickens, Senior Engineering Inspector
DATE: April 29, 1996
SUBJECT: Water Supply Line ~ Coppell - Meeting April 261h
I met with Pate Bros. (Oolden & Bruce) and Charley Ciriffith with Bore Co. Also present
was Larry Davis with City of Coppell and Tim Bilyeu on April 26, 1996. We discussed
the bore across MacArthur BIrd ~ Bethel School Rd. There appears to be a vast erataunt
of fill that is causing the road to sluff off while attempting ~e bore. It is being hand dug.
Chin'Icy Griffith expressed his concern that due to the natm'e of existing soil, it would
take longer than m~ticipated to cross MacArthm- BIrd. I explained to all in attendm~cc
that the main concern is to put emphasis on safety ilrst, not only for conslruction workers
but lbr citizens of Coppell. As the job progresses towards completion, we may at thai
time have to review m~d adjust the time allowable due to difficulty of bore m~d effort by
contractor. lhe Superintendent for Oriffith has stated that it will take approxi~natcly 26
working days (at 6' a day 4-156) to complete bore.
cc: Tim Bilyeu, Engineering Inspector 11