Loading...
WA9402-CS 960429 214 721 2280 04/29/96 "' 13:07 CITY OF IRUING/I~R UTILITIES 001 ' Cit . ~rvi~ CITY OF IRVING ENGINEERNG FIELD OFFICE ~ RO~ IRVING, TEX~ (114) 721 -~201 FAX COVER SHEET DATE:4-29-96 TIME: .... cxq: 0 0 p, / TO: ~:~ r (c.t . Dau, g FAxNuMBER: ~'nOM: ~"~n,de? ~ ~pf~Ti . _,~ . RE: Bore at Old Bethel Rd @ MacArthur Total nm~r of ~ ~c~g coy~r k~r: ~ SPECIAL INSTRUCTIONS: We are transmitting from an FAXWRITER 4000; fax number: (214) 721-2280. If you encounter problems receiving this transmission, please contact Karen or Leslie at (214) 721-2201. 04/29/96 13:09 CITY OF IRUING/WATER UTILITIES 002 of Irving OFFICE MEMO TO: Rod Smithey, Engineering Inspections Supervisor FROM: James Dickens, Senior Engineering Inspector DATE: April 29, 1996 SUBJECT: Water Supply Line ~ Coppell - Meeting April 261h I met with Pate Bros. (Oolden & Bruce) and Charley Ciriffith with Bore Co. Also present was Larry Davis with City of Coppell and Tim Bilyeu on April 26, 1996. We discussed the bore across MacArthur BIrd ~ Bethel School Rd. There appears to be a vast erataunt of fill that is causing the road to sluff off while attempting ~e bore. It is being hand dug. Chin'Icy Griffith expressed his concern that due to the natm'e of existing soil, it would take longer than m~ticipated to cross MacArthm- BIrd. I explained to all in attendm~cc that the main concern is to put emphasis on safety ilrst, not only for conslruction workers but lbr citizens of Coppell. As the job progresses towards completion, we may at thai time have to review m~d adjust the time allowable due to difficulty of bore m~d effort by contractor. lhe Superintendent for Oriffith has stated that it will take approxi~natcly 26 working days (at 6' a day 4-156) to complete bore. cc: Tim Bilyeu, Engineering Inspector 11 Larry Davis, Inspector for the City of Coppell Pate Brothers Construction File