Loading...
ST9902-CS090501 (2) (1/6/2010) Ken Griffin - RE: Sandy Lake Trail IssuesPage 1 From: "Matt Atkins" <matkins@tnp-online.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> CC: "John Elias" <JELIAS@ci.coppell.tx.us>, "Ken Griffin" <KGRIFFIN@ci.coppe... Date: 5/1/2009 11:25 AM Subject: RE: Sandy Lake Trail Issues I will check again with TxDOT on the sidewalk angle. We will look into the impacts of the wider trail. I am pretty sure there are no ROW impacts, but maybe some to walls. I will let you know. Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com www.tnp-online.com -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Friday, May 01, 2009 10:57 AM To: Matt Atkins Cc: John Elias; Ken Griffin; Mark Holliday Subject: Re: Sandy Lake Trail Issues Before we make that decision, can you tell me if adding 2 feet to the trail has any implications on height of retaining walls, width of bridge, amount of ROW necessary, etc... How much money are we talking about for this extra width? Can we simply label the 8' trail as sidewalk? This AASHTO Bike Trail Design seems excessive... Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Matt Atkins" <matkins@tnp-online.com> 5/1/2009 10:45 AM >>> Keith, Ali just called me back regarding the trail and indicated that he told me wrong about removing the trail. Since the schematic has been approved, we have to go with either a 10' trail or a design waiver. I assume you will want to go with a 10' trail and not go through the waiver "painful" waiver process. Please let me know and we will get it submitted. (1/6/2010) Ken Griffin - Re: Sandy Lake Trail IssuesPage 1 From: Keith Marvin To:Atkins, Matt CC:Elias, John; Griffin, Ken; Holliday, Mark Date: 5/1/2009 10:57 AM Subject: Re: Sandy Lake Trail Issues Before we make that decision, can you tell me if adding 2 feet to the trail has any implications on height of retaining walls, width of bridge, amount of ROW necessary, etc... How much money are we talking about for this extra width? Can we simply label the 8' trail as sidewalk? This AASHTO Bike Trail Design seems excessive... Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Matt Atkins" <matkins@tnp-online.com> 5/1/2009 10:45 AM >>> Keith, Ali just called me back regarding the trail and indicated that he told me wrong about removing the trail. Since the schematic has been approved, we have to go with either a 10' trail or a design waiver. I assume you will want to go with a 10' trail and not go through the waiver "painful" waiver process. Please let me know and we will get it submitted. Also, regarding Sandy Lake, did you decide to go with our proposal for ROW services? If so, when would you like us to start? Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com <mailto:matkins@tnp-online.com> www.tnp-online.com <http://www.tnp-online.com/> (8/23/2011) Keith Marvin - Fwd: FW: Sandy Lake Road (0918-45-377) Approval MemoPage 1 From: Keith Marvin To:Elias, John Date: 5/1/2009 10:30 AM Subject: Fwd: FW: Sandy Lake Road (0918-45-377) Approval Memo Attachments:Sandy Lake Rd (0918-45-45-773) DES Comment 4-16-09.pdf John, The section of Sandy Lake road between Coppell North and Coppell South currently shows an 8 foot trail adjacent to the road. TxDOT has commented that the trail should be 10 feet wide. Do you have any thoughts on trail width through here? Keith >>> "Matt Atkins" <matkins@tnp-online.com> 5/1/2009 10:23 AM >>> Good Morning Keith, Sorry about not following up on this with you already, but I was trying to get an answer out of TxDOT regarding trail options. I just talked to Ali this morning and got some clarification. Basically, we have a couple of options. We either show the trail as 10' wide or we show the trail as future. This would alleviate the need for any design waivers with the trail and the process that is associated with those. Either way we can make the change and have the revisions submitted within a couple of days. Please let me know which way you would like to go with the trail. Thanks and have a great day! Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com www.tnp-online.com -----Original Message----- From: Ali Taheri [mailto:ATAHERI@dot.state.tx.us] Sent: Monday, April 27, 2009 3:37 PM To: Matt Atkins Cc: kmarvin@ci.coppell.tx.us Subject: Fwd: Sandy Lake Road (0918-45-377) Approval Memo Mr. Atkins, It looks like Schematic is approved by our division with a minor comment (width of shared used trail path). I was told to get a design waiver approved at this stage of PS&E is painful, therefore I am recommending that if it is acceptable by the City of Coppell, you go ahead and provide a 10 ft wide shared used path and be over. For your view I am attaching a copy of our division approval into that effect. As requested in following e-mail from Bruce Nolley, please forward me a PDF copy and three additional hard copies of the schematic for distribution. If you have any questions or comments don't hesitate to e-mail or call me at the number below. (8/23/2011) Keith Marvin - Fwd: FW: Sandy Lake Road (0918-45-377) Approval MemoPage 2 Ali Taheri, P.E. Dallas NW Area office 12000 Greenville Avenue Dallas, Texas 75243 (972)479-9747 (Tel.) (972)479-1696(FAX) e-mail: ataheri@dot.state.tx.us Use caution when driving through work zones. Find more information and public service announcements regarding work zone safety at http://www.txdot.gov/safety/tips/work_zones.htm. >>> Bruce Nolley 4/23/2009 2:02 PM >>> Ali, Attached is the approval memo for the Sandy Lake Road schematic. Please note their comment regarding the trail portion of the project. If you during the PS&E phase you can revise the width of the trail to 10' you do not have to resubmit the Form 1002 with a "Design Waiver". If you decide to keep the 8' wide trail we will need to resubmit the Form 1002 (pg 3) requesting a "Design Waiver." The sooner you all make a decision on this matter the better. I will need a PDF copy and three additional hard copies of the schematic for distribution here at the District. If you have any questions please contact me. Bruce Wayne Nolley, P.E. Tx Dept. of Transportation 4777 E. Hwy 80 Mesquite, Tx 75150-6643 Phone: (214) 320-6156 Fax: (214) 320-4470 bnolley@dot.state.tx.us Some things you should keep to yourself... like trash. Don't Mess with Texas means don't litter. Learn more at www.dontmesswithtexas.org ( http://www.dontmesswithtexas.org/ )