Loading...
Coppell Heights 9-LR090403GEOSCIENCE ENGINEERING AND TESTING, INC. %. �YOVXP-MRIFWERqO�B-()-IL( DAILY FIELD REPORT CLIENT: MJR Environmental Inc. 7953 Pinkerton Ct. Plano, TX 75025 DATE OF REPORT: 04/03/09 PROJECT: Coppell Heights 920 S. Belt Line Coppell, Texas REPORT NO. 08- DM3633 -9 WEATHER CONDITIONS: Sunny TEMPERATURE RANGE: 65 TO: 75° THE GETI TECHNICIAN WAS DISPATCHED TO THE ABOVE REFERENCED PROJECT SITE TO PERFORM FIELD TESTING AS REQUESTED. THE TECHNICIAN MOLDED ONE (1) SET OF FOUR (4) TEST CYLINDERS PLACED FOR APPROACH @ SE SIDE OF JOB SITE. LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. GETI Tech: Cody Remarks: Reviewed by: �J Syed S. Afsar, P.E. Project Engineer GETI 2712 Satsuma Dr. Suite 400 Dallas, Texas 75229 PH# 972- 488 -3500