Coppell Heights 9-LR090404prazM
GEOSCIENCE ENGINEERING AND TESTING, INC.
DAILY FIELD REPORT
CLIENT: MJR Environmental Inc.
7953 Pinkerton Ct.
Plano, TX 75025
PROJECT: Coppell Heights
920 S. Belt Line
Coppell, Texas
DATE OF REPORT: 04/4/09
REPORT NO. 08- DM3633 -10
WEATHER CONDITIONS: Sunny TEMPERATURE RANGE: 65 TO: 75
E GETI TECHNICIAN WAS DISPATCHED TO THE ABOVE REFERENCED PROJECT SITE TO PICK -UP CYLINDERS.
E TECHNICIAN OBTAINED ONE (1) SET OF FOUR (4) TEST CYLINDERS FROM JOB SITE.
GETI Tech: Cody
Remarks:
Reviewed by:
Syed S. Xfsar, P.E.
Project Engineer
GETI
2712 Satsuma Dr. Suite 400
Dallas, Texas 75229
PH# 972 - 488 -3500