Loading...
Coppell Heights 9-LR090404prazM GEOSCIENCE ENGINEERING AND TESTING, INC. DAILY FIELD REPORT CLIENT: MJR Environmental Inc. 7953 Pinkerton Ct. Plano, TX 75025 PROJECT: Coppell Heights 920 S. Belt Line Coppell, Texas DATE OF REPORT: 04/4/09 REPORT NO. 08- DM3633 -10 WEATHER CONDITIONS: Sunny TEMPERATURE RANGE: 65 TO: 75 E GETI TECHNICIAN WAS DISPATCHED TO THE ABOVE REFERENCED PROJECT SITE TO PICK -UP CYLINDERS. E TECHNICIAN OBTAINED ONE (1) SET OF FOUR (4) TEST CYLINDERS FROM JOB SITE. GETI Tech: Cody Remarks: Reviewed by: Syed S. Xfsar, P.E. Project Engineer GETI 2712 Satsuma Dr. Suite 400 Dallas, Texas 75229 PH# 972 - 488 -3500