Loading...
Coppell Heights 9-CS091228Page 1 of 1 Rhonda Adloo - COPPELL CROSSROADS - LETTER OF CREDIT (LC) From: Mohammed Kamal <mkama167 @gmaiLcom> To: Michael Garza <mgarza�aci.coppell.tx.us> Date: 12/28/2009 8:53 AM Subject: COPPELL CROSSROADS - LETTER OF CREDIT (LC) CC: <RADLOO�aci.coppell.tx.us> Attachments: MJR LC.pdf; CONCRETE COST BREAKDOWN -RIGHT OF WAY.pdf Michael We have purchased a Maintenance Bond for Utility work and for the Pavement work, we are issuing a letter of credit to the City for 2 years. Our bank has prepared the letter as I attached. Please review and let us know if the language in the letter is acceptable to the City. Please let me know in your earliest convenience. Mohammed Kamal, PE MJR Engineering Inc 7953 Pinkerton Court Plano, Texas 75025 (469)544 -8150 (972)767 -3003 (F) file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4B3871F5City_of... 1/7/2010 XXXXX BenefleiaM.* Dec. xx, 2009 City of Koppel 255 Parkway, P 4 box 947& Coppell, Tx 75019 ... Constructions Standby leer of Credit Na: SBNffl-xxxxxxx Applicant: MJR Engineering, Inc Expiration Date: Dec. 11, 2011 Gentlemen: We, MetroBank N.A. Mauston Texas hereby establish our Irrevocable Standby Letter of Credit No. SBW-xxxx in your favor and for account of MJR Engineering, Inc for an aggregate amount of US$30,400.00 (U.S. Dollars Thirty Thousand Four Hundred and 00 /100 Only ), available to Beneficiary by draft drawn at sight on MetroBank N.A. Houston, Texas accompanied by the following documents: 1. A Signed statement by the City Manager of the City of Coppell or the City Manager's designee, stating that' "we certify that MJR Engineering, Inc. has failed to fulfill their contractual obligations under the constructions. And 2. The original of this Sandy Letter of Credit and Amendments, if any. Page 1 of 2 Page 2 of 2 MetroBankNo.A. Letter of Credit Department 9600 Bellaire Blvd, Suite 252 Houston, Te)&xas 7"036 Irrevocable Standby Letter Of Credit gyp, SBMP-93500290 City of Coppell Additional Conditions: I p draws under this Leiter of Credit are allowed 2 Draft drawn under this Standby Utter of Credit must bear the Following cause: "Drawn under MetroBank N.A. Houston Texas Letter of Credit No SBI\4p_xxxxxx dated Dec. xx 2009 We hereby engage with you that all drafts drawn under and in compliance with the terms of this credit, will be duly honored if presented at this office (9600 Bellaire Blvd. Suite 252, Houston, Texas 77036) on or before Dec. 1.1, 2011 This Standby Letter of Credit is subject to "The uniform Customs and Preactice for' Documentary Credits" (2007. Revision) lntematianal Chamber of Commerce Publication No. 600. MetroBank, N. A. Authorized Signature oar Authorized Officer Stephen Liao MinEngineering New Construction •Engineering •Environmental Services DATE: DEC 21 SITE: 920 S BELT LINE, COPPELL, TX PAVEMENT DETAILS 3 DRIVEWAY APPROACHES & SIDEWALK (TOTAL APPROX CONCRETE AREA = 5260 SFT) COST OF MATERIALS LABOR TOTAL MEDIAN OPENING (APPROXIMATE PAVEMENT AREA 4260 SQ FT) LIME TREATMENT COST OF CONCRETE MATERIALS BARRICADE LABOR TOTAL STAMPED CONCRETE (APPROXIMATE CONCRETE AREA 1100 SFT) COST OF MATERIALS LABOR TOTAL $13,150.00 $6,575.00 $1,770.00 $12 $5,400.00 $8,200.00 $19,725.00 $28,150.00 $7,975.00 $4,950.00 $12,925.00 GRAND TOTAL $60 www.mjrconstructions.com p: 469.544.8150 1 f: 972.767.3003 1 e: mkama167Qgmail.com 7953 Pinkerton Ct. Plano, Texas 75025