Loading...
Fiberlight-PT100108 (3)A copy of the approved permit must be on the job site at all times. CC: Applicant H e - c i T v - o F Page 1 of 4 Public Works Permit File A PPHO WEI L - OFFELL Rev. 11/07 rr 11 -24 -0 9P01 :21 RCVD Orig. to Project File RIGHT -OF -WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. Date of Submittal: Applicant's Job # / Work Order # (t - ZO - ( 5 PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise /ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001 -944. Certificated Telecom Provider? Y N ❑ Plans provided and approved (Erosion Control /safety fences�must be installed prior to beginning work) Project Name / Location: General Contractor: Utility Company Represented: ❑ Oncor Electric Delivery ❑ Atmos Energy ❑ Veerizon r� . / , /❑] SBC/ AT &T E] Time Warner Cable E] CoSery Electric /Gas her r1,i e)&4i21 Ge eral Y rovide Descripti n of Work four [4J sets of plans): In ac rd nce with Ord. No. 2001 -944. o $Q e /1 t— .... �.�✓ Q�d 14e....... Estimated Start Date / / J9 /0!? Estimated Completion Date* * Completion requires submittal of Completion Verification Notice (see page 4) ➢ Was contact made with City and /or utility companies to locate existing utilities? if NO, Reason: YES NO ❑ ➢ Is removal of existing streets, alleys, or sidewalks necessary? YES ❑ NOZ if YES, must have City inspection prior to concrete replacement Right -of -Way Use Permit Application Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at the applicants expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972 - 462 -5155. ➢ Any excavation requiring closing of a street /alley must be reported prior to closing to the following: Police Department @ 972 - 304 -3600 Fire Department @ 972 - 304 -3500 Street Department @ 972 - 462 -5150 Engineering Department @ 972- 304 -3679 ➢ Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE. Street closures are allowed from 9:00 a.m. until 3:00 p.m. ONLY unless otherwise approved by City Engineer. ➢ Attach Work Order (franchise only) and /or 4 sets of prints showing proposed work. E contacts must be made to locate existing utilities 48 hours prior to beginning work. t c h ati wit original signatures should be submitted to the Engineering Department before approval.) Signature of Utility o any Representative Printe a Date � CJA,�- B Z:�Y� CAlv, Bv")Anoc 2L I ID d Signature of Contr for Representative Printed Name Date Signa ity Representative Printed Name Date ➢ Comments: ( pi lc- (/ C 1 1. -1 ➢ NOTE. Notify City Inspector at 972 - 304 -3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T H E C I T Y O F Time of Verification Appointment Page 4 of 4 UTILITY RELOCATION IN RIGHT -OF -WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972 -462 -5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name �, �, c z r c ti-I Project Location / Applicant's Work Order # (►r applicable) Sub- contractor Company Name 1 v` 1 P� % 1 �. Ce .�: •. 24 hr. Contact Number a-1 - 3 2 - 7 _i, Date of Verification Appointment INFORNLATION BELOW TO BE CONIPLETED BY CITY OF COPPELL PI RT.fC WORKS PFRS41NNF.1 ❖ Inspected by ,t aJ S4w t_ of UTILITIES Maintenance Division on 1 - a S jof o , and found to be acceptable / not acceptable because Follow -up needed? NO/ YES •.• Inspected by COFFELL M Z * �.. P 1 . ^ Follow -up scheduled for of STREETS Maintenance Division on and found to be acceptable / not acceptable because Follow -up needed? NO/ YES Follow -up scheduled for A copy of this completed notice is to be provided to: City of CoppeIl Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972 -304 -3679 Fax: 972 - 3043570 K . 66L9 Iladdoo Io fqo dg£:£0 0 L 97 ue N UTM Coords: REVISIONS No. CHANGES DATE I BY ,. U U 0 rNy m J m PROFILE "A" PROPOSED FOC U O O ENCASED IN 4" SCH 80 PVC m U m 58, MAINTAIN 42" COVER --32' - -20' -- A / —S V 2. 3. 4. 6. 7. `' ,0. 12. 13. QL C - 25 ,� 12 "WL 4' COVER TYPICAL STREET BORE 8" SS LINE Lo `l M I START BORE 42' AT POLE 30' END BORE SET VLT w STREET I SEE PROFILE "A" I - 1 - /� PP 4' BOC 0 +00' S TART PROJECT SB L ALL STREET BORES ARE PERPENDICULAR TO THE CURBS. 8" SS LINE ' X12 WL Ir ✓/ STREET GRADE ROW - �, I 1 2 0 +10' BOC 1_. 9.. BOC 0 +18' 'I 111 I PROPOSED FOC _ BOC 3 24 SS MH Ifl I ICI I RUN IN (2) -1.5" HDPE + CIL 0 +42' - - 2 BOC 0 + 62' - I'I I 6' �, I I MAINTAIN 42" COVER I _ _ _ _ I -- 12 WL _ _ _ CIL SOUTH BLVD 40 MPH 24" WL 6' COVER 22' 12' BOC U TYPICAL TRENCH DETAIL DDMD�$, ALL TRENCHES COMPACTED TO 92 °6 S 0+67'- - - -- i TYPICAL STREET ROW PLACEMENT I 5' ' —.. — . - - -- ' -- ---- — - " -- -- -- -- BTREET CURB 12 "WL 4' COVER IT OW AND OK U.E- ROW - - -- - _ ROW CAN TO BE PLACED WITHIN R OR U E SET 3' X 5'X 3' VLT 0 +72' 1 +01' PP 10' BOC ROUTE DEFINITION TURN EB 10' BOC END PROJECT PeoesTU !� —ROAD BORE TIC s I 'JIG ROUTE J TYPICAL ALLEY PLACEMENT NOTE: CONTRACTOR IS RESPONSIBLE TO CALL FOR UTILITY LOCATES NOTE: MAINTAIN 2' SEPARATION BETWEEN CA TV, WATER LINES, SAN AND STORM CONCP.ETE EDGE 2 ' ROW AN ORU E. PRIOR TO DIGGING TOTAL PERMIT FOOTAGE THIS SHEET 101' SEWER AND GAS LINES LOT IPT lV Fi u 111./ N _ EXISTI U TH (TIES — e PERMIT FOR NEW BUILD FL GV HILTON CITY SOUTHWESTERN - COPPELL UG COPPELL CA TO BE PLACED WITHIN N ROW OR U E. =XIS(ING UTILITIES AND UNDERGROUND FACILITIES INDICATED CN THESE PLANS HAVE BEEN LOCATED FROM R97FRENCE FORMATION. IT SHAH BE THE RESPONSIBWTY OF THE CONTRACTOR TO VERIFY BOTH HORIZONTALLY AND VERTICALLY THE LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND FACILITIES PRIOR TO CONSTRUCTION, TO TAKE NECESSARY PRECAUTIONS IN ORDER TO PROTECT ALL FACILITIES ENCOUNTERED. THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING UTILITIES FROM DAMAGE DURING CONSTRUCT.ON. SHEET 1 OF 1 CRIS DRAFT 11 -10 -09 CITY: COPPELL `AA QQg� G p 0� �G�� g'N pQ G 31 � 1p, y 0 ��� COU NTY' bALLAS STATE: TEXAS SY y NAP NUNBE(E LEGEND Type III Barricade Channelizing Devices ._ Fla' DALLAS METROPLEX uTM coords: TRAFFIC CONTROL PLAN - COPPELL - FIBERLIGHT - GV HILTON - ENCHANTED WAY TO IH 635 - REVISIONS Trailer Mounted Portable Changeable N0. CHANGES DATE 9Y 1. Flashing Arrow Panel Message Sign NI 3. 4. 5. Flagger Sign Post : - -_, a. 7. a. a . 10. AERIAL 11. 12. 13. UNDERGROUND TYPICAL STREETBORE EL X CD I w STREET ROAD WORK CW20 -ID AHEAD (FLAGS - SEE NOTE 1) \ - 0 J w d END o U ROAD WORK ~ ALL STREET BORES ARE PERPENDICULAR TO THE CURBS. STREE T - ,RAGE FLAGGER AHEAD I L DW D ) \/ w CW2TF511 I DW � J �DW — — _ � � y --- � ,_,,,-- _• J- • a-- ... .... — � . .... • • . °• �— -- — — ................. -. .�..- .�•++"'-'" . SOUTHWESTERN BLVD - •.. .iaaalu.•au• ¢ 30 MPH U f ONE FLAGGER LANE ROAD AHEAD TYPICAL TRENCH DETAIL za° AIIF�,AD CW20 -5R 4r&TBRO DBMI) CW20 -5R GENERAL NOTES: TYPICAL STREET ROW PLACEMENT 1. Unless otherwise stated in the plans, flags attached to Signs are RE QUIRED . for less than two weeks. ,TREE' rURry 3. Existing pavement markings may remain in place for projects less than two weeks in duration. 4. The FORM ONE LINE LEFT (or RIGHT) sign may be used following the RIGHT (or LEFT) LANE CLOSED XXX FT sign. Spacing distance between ROUTE DEFINITION signs should be the minimum distance indicated. % ROAC BORE I-C - length per lane. Roi,rE 6. For intermediate tcnn situations, when it is not feasible to remove and restore pavement markings, the channclization must be made EQUIPMENT DEFINITION dominant by using a very close spacing. This is especially important in locations of conflicting information, such as where traffic is directed over a double yellow centerline. In such locations a maximum channelizing device spacing of 10 feet is recommended. The 10 foot channelizing device spacing recommendation is intended for the area of conflicting information and not the entire work zone. sconces / t cnaEe E XISTING UTILI — TYPICAL ALLEY PLACEMENT TRAFFIC CONTROL PLAN -KS FIBERLIGHT - GV HILTON ENCHANTED WAY - IH 635 SH. 15 OF 29 CONCRETE EDGE EXIS'9 NG U i1LITIES AND UNDERGROUND FACILI - TIES INDICATED ON THESE PLANS HAVE BEEN LOCATED FROM REFERENCE NFORMADON. IT SHALL BE THE RESPONSIBILITY OF THE ` 8 ovE M 7 TOWN: CDPPELL courin: 'CONT'RACTOR TO VERIFY BOTH HORIZONTALLY AND VERTICALLY DALLAS .HE LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND = ACILITIES PRIM TO CONSTRUCTION. TO TAKE NECESSARY AVID STATE: TEXAS PRECAUTIONS IN ORDER TO PROTECT ALL FACILITIES ENCOUNTERED. THE CON IRACTOR SHALL PRESERVE AND LOT ,.- SYSTEM: NAP NUMBER: - ,; ...T'i..'G U7UTIES FROM DA.MAGY DURING TRAFFIC CONTROL PLAN - GV HILTON - SOUTHWESTERN & COPPELL RD ROAD CW20 -1D WORK AHEAD (FLAGS -SEE NOTE 1) \ CW20 -5R END ROAD WORK G20 -2a �. is FLAGGER AHEAD ■ I a - i� ■ s ■van OE man aa' -- - - - -- - -- ■■ i a E " M4 - gag - - -- --° -- a ■■ ° ° r ° • a ■ ■ ■ ■ a a ■ a ■ a a ■ r ■ a ■ ■ a a a ■ SOUTHWESTERN BLVD 40 MPH LEGEND Type III Barricade Channelizing Devices Flag Trailer Mounted Portable Changeable i M Flashing Arrow Panel Message Sign Flagger Sign Post ._ 4ERIAL UNDERGROUND CW20 -5R ROAD WORK AHEAD CW20 -1D (FLAGS -SEE NOTE 1) 240' 240' 240' 265' a m to FLAGGER M AHEAD A CW20 -SR O! J J W a_ EL 0 U I CW20 -5R ONE I \ LANE I END LAGGE ROAD AGGE ROAD WORK I AHEAD I G20 -2a 9\ 240' 240' - 240' ■ I a - i� ■ s ■van OE man aa' -- - - - -- - -- ■■ i a E " M4 - gag - - -- --° -- a ■■ ° ° r ° • a ■ ■ ■ ■ a a ■ a ■ a a ■ r ■ a ■ ■ a a a ■ SOUTHWESTERN BLVD 40 MPH LEGEND Type III Barricade Channelizing Devices Flag Trailer Mounted Portable Changeable i M Flashing Arrow Panel Message Sign Flagger Sign Post ._ 4ERIAL UNDERGROUND CW20 -5R ROAD WORK AHEAD CW20 -1D (FLAGS -SEE NOTE 1) 240' 240' 240' 265' ROAD WORK ONE AHEAD LANE FLAGGER ROAD AHEAD CW20 -SR CW20 -5R CW20 -1D AHEAD (FLAGS- SEE NOTE 1) !F END ROAD WORK G20 -2a GENERAL NOTES: I . Unless otherwise stated in the plans, flags attached to signs are REQUIRED. for less than two weeks. 3. Existing pavement markings may remain in place for projects less than two weeks in duration. 4. The FORM ONE LINE LEF`r (or RIGHT) sign may be used following the RIGHT (or LEFT) LANE CLOSED XXX FT sign. Spacing distance between signs should be the minimum distance indicated. length per lane. 6. For intermediate tern situations, when it is not feasible to remove and restore pavement markings, the channelization must be made dominant by using a very close spacing. This is especially important in locations of conflicting information. such as where traffic is directed over a double yellow centerline . In such locations a maximum channelizing device spacing of 10 feet i, recommended. The 10 foot channclizing device spacing recommendation is intended for the area of conflicting information and not the entire work zone. DALLAS METROPLEX REVISIONS TYPICAL STREET BORE I W STREET w 7 AR ALL STREET BORES E PERPENDICULAR TO THE CURBS. TSTREET GRADE TYPICAL TRENCH DETAIL 2' ATBTBROADR- TYPICAL STREET ROW PLACEMENT 5 PH '.1115 ROUTE DEFINITION /1 U/G ROUTE \ TRAFFIC CONTROL PLAN -KS I GV HILTON SH. I OF 1 SOUTHWESTERN & COPPELL