WA9402-CS 960507C DEPARTMENT OF PUBLIC WORKS 05-13-96P03:24 RCVD DIVISION OF ENGINEERING of Irving May 7, 1996 Mr. Ken Griffin, P. E. Asst. City Manager/City Engineer City of Coppell P. O. Box 478 Coppell, Texas 75019 Dear Mr. Griffin: As discussed previously, bids for Dallas Water Supply Line No. 3 - Section 3B were received on February 9, 1996 and this project was awarded on February 22, 1996 to J. C. Evans Construction Co., the low bidder, in the amount of $1,000,153.00. Additional funds in the amount of $19,847.00 were budgeted for Testing bringing the total budgeted amount to $1,020,000.00. Also, costs have been incurred by the City of Irving during easement acquisition for the section of this supply line between the Elm Fork Treatment Plant and the Sandy Lake Road Crossing. Attached is a memo from Mr. Doug Janeway, Sr. Right-of-Way Agent, detailing these costs. In summary, there have been $11,177.00 in actual costs to date, and an estimated amount of $17,960 to obtain two parcels in which eminent domain has been authorized by our City Council. For the purposes of budgeting, the estimated amount of $17,960 represents the appraised values of these properties. Actual costs may deviate substantially. The total of estimated costs plus actual easement acquisition costs, at this point, is $29,137.00. in accordance with the Dallas Water Supply Line No. 3 contract between the cities of Irving, Coppell, and Lewisville, the City of Coppell is obligated to pay for their share (20/91) of the before-mentioned items. We, therefore, request that the amount of $230,580.00 be forwarded to the City of Irving at this time, calculated as follows: $1,000, 153.00 (Construction Contract 3B) 19,847.00 (Estimated Testing Costs) 11,177.00 (Actual Easement Acquisition Costs to Date) 17,960.00 (Estimated Easement Acquisition Costs for Remaining Parcels) $1,049,137.00x20/91 ~ p~. 4L~5 "Assuring Pub& Welfare Thru Engineering Excellence" P.O. Box 152288 · 75015-2288 825 West Irving Blvd. · Irving, Texas 75060 · (214) 721-2611 RECYCLED PAPER . Dallas Water Supply Line No. 3 May 7, 1996 Page 2 Regarding Engineering Design expenses, the City of Irving has, of course, incurred expenses over the past several years. This effort began before the contract between Irving, Coppell and Lewisville was fully envisioned. There is, therefore, no separate accounting of costs eligible for reimbursement versus non-eligible costs. We are in the process of summarizing these costs and developing a fair method of pro-rating expenses. Any thoughts you have would be appreciated. We apologize for not keeping you better informed of the progress of this project. We will do so in the future. Please let me know if there is any additional information needed to justify or document these expenses. Sincerely, Bob Chapman, P.E. Deputy Public Works Director cm Attachment pc: Douglass Bales, Assistant City Manager Jack Angel, Public Works Director Jim Siddall, Water Utilities Operation Manager David M. Mullins, Engineering Manager File CITY OF IRVING OFFICE MEMO TO: Bob Chapman, Deputy Public Works Director FROM: Doug Janeway, Sr. Right-of-Way Agent l$f DATE: May 6, 1996 SUBJECT: Right-of-Way Costs - Dallas Water Supply Line No. 3 - Dallas Elm Fork Plant to Coppell Meter Station Title Work ....................................$ 510 Appraisals .....................................$ 3,300 Purchase - Tabor Easement ...........$ 5,000 Purchase - Tierra Easement ...........$ 2, 367 Total .............................................$ 11,177 Estimated cost of properties to be acquired through eminent domain: City Offer Asking Sandy Lake (RR & S) ...................$ 5,346 $ 40,000+ Heirs of Willie D. Skiles ................$ 5,614 $ 15,862 Appraisal Testing ..........................$ 2,500 Commissioners' Fees ....................$ 4,500 $ 17,960 Total Expected Cash Cost $ 29,137 cm pc: File OFFICE MEMO CITY OF IRVING TO: Douglass Bales, Assistant City Manager FROM: Jack Angel, Public Works Director DATE: February 12, 1996 SUBJECT: Resolution - Approval of and Authorization to Accept the Low Bid and Award the Contract for Section 3B - Dallas Water Supply Line No. 3 and to Accept the Low Bid and Award the Contract for Sections 2A & 2C - Dallas Water Supply Line No. 3 DISCUSSION: On Friday, February 9, 1996 at 10:00 A.M. bids were opened for the Dallas Water supply Line No. 3 - Section 3B and Sections 2A and 2C. The proposal for this water line installation was structured to provide some flexibility to the City of Irving to take advantage of some possible time savings and some possible money savings. The construction areas were divided geographically. The proposal was set up so that one contractor would construct the entire project only if he were the low bidder on both portions (Section B and Section 2A & 2C). Otherwise, different low bidders would construct different portions of the improvements (i.e., one contractor for Section 3B and a different contractor for Sections 2A & 2C). As was mentioned, not only is money a consideration of the award of this improvement. Time also is of much importance. _ CONTRACTO~ CALENDAR SECTIONS CALENDAR TOTAL CALENDAR DAYS 2A&2C DAYS DAYS ~ $1,036,840.00 100 calendar $2,031,993.00 200 calendar ...................... ._._ ~..~ da,,s days $1,041,217.14 100 calendar '/~ ~~ $2,049,767.53 200 calendar .......... ~ ...... days .. ~ da~ AtldnsBros. E quip. $1,071,419.75 100calendar $1,092,401.25 100calendar $2,163,g21.00 200calendar Ma~io Sinacola & $1,064,216.50 100 calendm- $1,I 15.346.20 100 calendar $2,179,562.70 200 calex~lar Oscar Renda Contr. $1,122,721.00 100 calendar $1,282,510.00 100 calendar $2,335,231.00 200 calendm' Game7 Company $1,207,950.00 100 calendar $1,309,580.00 100 calendar $2,477,530.00 200 calendar Bar Constructors $1,274,287.50 100 calendax $1,309,350.00 100 calendar $2,563,637.50 200 calendar Engineers Est. $1,100,000.00 100 calendar $1,100,000.00 100 calendar $2,200,000.00 200 calendar Douglass Bales Award of Contract for Dallas Water Supply Line No. 3 Page 2 RECOMMENDATION TO AWARD It is recommended that Section 3B be awarded to J. C. Evans Construction Co., 3900 Valley View Drive, Irving, Texas 75062 on the basis of their best and lowest bid in the amount of $1,000,15:3.00. The bid is for 100 calendar days. An additional $19,847.00 will be needed for testing, bringing the total project cost to $1,020,000.00. It is also recommended that Section 2A & 2C be awarded to Pate Brothers Construction Co., Inc., 780 W. Mansfield Hwy., Kermedale, Texas, 76060 on the basis of their best and lowest bid in the amount of $1,018,550.39. The bid is for 100 calendar days. An additional $11,449.61 will be needed for testing bringing the total project cost to $1,030,000.00. It is recommended that the contract be awarded to two contractors (I. C. Evans Construction Co. for Section 3B and Pate Brothers Construction Co. for Sections 2A & 2C). This recommendation is less than the total bid of J. C. Evans Construction Co. for both sections by $1:3,289.61. More importan~y, however, structuring the projects allows two contractors to be working on different portions of the construction at the same time. This will allow the project to be completed in approximately 100 calendar days instead of 200 calendar days. RECOMMENDED FUNDING 11-00-92-:32-12-09-09 (Dallas Water Supply Line No. :3 Section :SB) $1,020,000.00 11-00-92-:32-12-09-10 (Dallas Water Supply Line No. :3 Sections 2A & 2C) $1,0:30,000.00 BUDGET ADJUSTMENTS/TRANSFERS: Transfer $1,020,000.00 from Account Number 11-00-92-32-12-09-00 (Dallas Water Supply Line Phase IO to Account Number 11-00-92-:32-12-09-09 (Dallas Water Supply Line No. 3 - Section 3B). Transfer $1,030,000.00 from Account Number 11-00-92-32-12-09-00 (Dallas Water Supply Line Phase ID to Account Number 11-00-92-32-12-09-10 (Dallas Water Supply Line No. 3 - Sections 2A & 2C). Douglass Bales Award of Contract for Dallas Water Supply Line No. 3 Page 3 Jack Angel Bob Chapman Director Deputy Public Works Director bnlw pc Ralph Ellis, Assistant City Manager Cathy Duncan, Financial Services Director Don Rors~hach, City Attorney Ron McCuller, Asset. P.W. Dir./Water Utilities Bob Chapman, Deputy Public Works Director W'dbum Frmkle, Ass~. P.W. Dir./Streets Dave Mullins, Engineering Manager Bobby Haas, Purchasing Director Larry Frassinelli, Engineering Supervisor Rod Smithey, Engineering Construction Supervisor File SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue,//820 Dallas, Texas 75225 (214) 361-7900 ROSS L. IACOBS. P.E. RoN^LD v. CONW^Y. FEB 12 1996 JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. PUBLIL, ,., ,,.... ~r i GARY C. HENDRICKS, P.E. CiTY OF I~V ,l'IG February 10, 1996 C. L. SHIMEK, P.E. I. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E, Mr. Jack D. Angel, P.E. Director of Public Works City of Irving Post Office Box 152288 Irving, Texas 75015-2288 Re: Dallas Water Supply Line No. 3 - Sections 3B, 2A & 2C Award of Contract Dear Mr. Angel: We have checked the bids received at 10:00 a.m. on February 9, 1996, for construction of the Dallas Water Supply Line No. 3 - Sections 3B, 2A & 2C. Enclosed are three (3) copies of the Tabulation of Bids. The project was bid in two sections. The low bidder for Section 3B (60" pipe) was J. C. Evans Construction Co., Inc. in the amount of $1,000, 153.00 and 100 calendar days. The low bidder for Sections 2A & 2C (54" pipe) was Pate Brothers Construction Inc. in the amount of $1,018,550.39 and 100 calendar days. The bidders were given the opportunity to bid both sections of the project together and offer the City a deduction if both sections are included in the award of the contract. The City may award the entire project (Sections 3B 2A & 2C) to the overall low bidder J. C. Evans Construction Co., Inc. in the amount of $2,03 1,993.00 with a time of completion of 200 calendar dayS, or it may award the project to the low bidder for each section for a total of $2,018,703.39 and a time of completion of 100 calendar days per section. Both contractors have successfully completed projects that we have designed which are similar to this project and each appears to be qualified to construct this project. Several items to be considered in the decision of how to award this contract are as follows: Advantages of Awarding Two Contracts · There would be a cost savings of about $13,000. · The time of completion of the work would be shortened by about 90 days. (60" pipe is not scheduled to be delivered until about 10 days after the 54" pipe) Disadvantages of Awarding Two Contracts · Dealing with two contacts, sets of shop drawing submittals, pay requests, subcontractors and so forth will make administration of the contracts more time consuming. Page 1 City of Irving ~ ~ Dallas Water Supply Line No. _ Sections 3 B, 2A & 2C February 10, 1996 Disadvantages of Awarding Two Contracts · There will be some extra coordination required' for testing against the 48" butterfly valve installed by the contractor awarded Section 3B since the contractor awarded Section 2A will also be testing against the same butterfly valve. · The City directed Gifford-Hill-American, Inc. to begin manufacture of the pipe in order to expedite the project. The preliminary pipe laying drawings did not include any closures, which may be required if two contractors are involved in the project. However, this should be handled between the contractors and Gifford-Hiil-American, Inc. to avoid the manufacture of any extra pipe and should not result in additional cost to the City. · There would be two contractors, both needing a staging area at about the same time. We do not take exception to the choice of award to either two contractors or one; however, the project could be managed more easily with a single contractor. We are available to discuss this matter with you at your convenience. Sincerely yours, c/Joe R. Carter, P.E. Enclosure cc: Mr. David Mullins, P.E. Mr. Ron McCuller Page 2 ' TAB_U~TION OF BIDS RIDoF sin OF sin OF ~ DATE: February 9, 1996 PROJECT: CITY OF IRVING, TEXAS SHINI]~K~ JACOBS & FINKLEA J.C. Evans Construction Co. Pate Brothers Construction, Inc. Arkins Bros. Equip. Co., Inc. Mado Sinacola &Sons Dallas Water Supply Line No. 3 CONSULTING ENGINEERS 3900 Valley View Dr. 780 W. Mansfield Hwy. 918 W. Marshall P.O. Box 248 Sections 3b. 2a & 2c Dallas, Texas Irving, Texas 75062 Kennedale, Texas 76060 Grand Prairie. Texas 75051 Lewisville, Texas 75067-024d ITN~)M' ~ APPROXIMATE ~ UNIT BID UNIT BID UNIT BID UNIT BID QUANTITIE~I UNIT __ DFSCRIPTION pRICE FXTi~N~III~N PRICE FXT!;NSION PRICE FXTFN~ION PRICE EXTENSION SCHEDULE .~. (Section 3B) 1A 2,245 LF. Fumish& Install 60' RCCP (E-301) Water Line by Open Cut w/Embedment $265.00 $594.925.00 $237.71 $533,658.95 $261.00 $585,945.00 $286.00 $642,070.00 A. 40 L.F. 60' RCCP (E-301) W.L. other than Open Cut, w/Steel Encasement Pipe (0.438' wall) $1,400.00 $56,000.00 $1,697.20 $67,888.00 $1.847.00 $73,880.00 $1,550.00 $62,000.00 3A 185 L.F. 60' RCCP (E-301) W.L. other than Open Cut, w/Steel Encasement Pipe (0.875' wall) $1,400.00 $259,000.0(3 $1.707.92 $315.965.20 $1,812.00 $335,220.00 $1.525.00 $282,125.00 4A 1 Ea. Furnish &Install 48' Butterfly Valve together w/Manhole $35,700.00 $35,700.0(3 $28,693.80 $28,693.80 $30,260.00 $30,260.00 $25,000.00 $25,000.00 5A 1 Ea. Construct 10' Blow-off Valve w/Manhole $4,500.00 $4,500.00 $12.760.62 $12,760.62 $10,610.00 $10,610.00 $14.000.00 $14,0OO.00 6A I Ea. Construct 8' Air and VaCuum Release Valve w/Manhole $6,500.00 $6 500.00 $12,070.06 $12,070.06 $9,860.00 $9.860.00 $9,500.00 $9,500.00 7A 1 L.S.. Furnish & Install 60' RCCP Dished Head Plug designed for Testing $3,000.00 $3,000.0(~ $8,23;I .95 $8,231.95 $3,200.00 $3,200.00 $5.000.00 $5.000.00 8A I L.S. Remove, Salvage and Reconstruct Existing Bdck Sign $5,000.00 $5.000.0(3 $8,457.49 $8,457.49 $5,500.00 $5,500.00 $7.500.00 $7,500.00 9A 435 S.Y. Removal and Replacement of Existing Gravel Drive $3.00 $1,305.0(3 $5.24 $2.279.40 $7.50 $3.262.50 $3.50 $1.522.50 10A 205 L.F. Removal and Replacement of Barbed Wire Fence $4.00 $820.0(3 $3.95 $809.75 $5.50 $1,127.50 $6.00 $1,230.00 11A 42 L.F. Removal and ;=-eplacement of Hog Wire Fence $6.50 $273.00 $4.51 $189.42 $5.50 $231.00 $7.00 $294.00 .A 1 Ea. Furnish &Install Cathodic Test Station $500.00 $500.00 $307.85 $307.85 $1,000.00 $1,000.00 $1,000.00 $1,000.00 13A 10 C.Y. Furnish &Install Extra Crushed Stone for Embedmerit $20.00 $200.0C $111.56 $1,115.60 $16.00 $160.00 $50.00 $500.00 14A 10 C.Y. Fumish& Install Extra 2000 PSI Concrete for Embedment $100.00 $1,000.0~ $112.77 $1,127.70 $50.00 $500.00 $125.00 $1,250.00 15A 4,490 L.F. Furnish &Install Erosion Protection Devices $2.00 $8,980.0(3 $1.13 $5.073.70 $2.00 $8,980.00 $2.00 $6.980.00 16A 2,245 L.F. Designing and Providing Trench Safety Systems $10.00 $22,450.00 $18.97 $42,567.65 $0.75 $1,683.75 $1.00 $2,245.00 AMOUNT BI[~: (Schedule A - Items 1A Through 16A) $1,000,153.00 $1,04t.217.14 $1.011,419.15 $t .064.216.50 Calendar Days ' 100 100 100 100 Psge 1 of 4 TABULATION OF BIDS BID OF BID OF BID OF BID OF DATE: February 9, 1996 PROJECT: CITY OF IRVING, TEXAS SHIMEK, JACOBS & FINKLEA J.C. Evans Construction Co. Pate Brothers Construction, Inc. Atkins Bros. Equip. Co., Inc. Mado Sinacola &Sons Dallas Water Supply Line No. 3 CONSULTING ENGINEERS 3900 Valley View Dr. 780 W. Mansfield Hwy. 918 W. Marshall P.O. Box 248 Sections 3b, 2a & 2c Dallas, Texas Irving, Texas 75062 Kennedale, Texas 76060 Grand Prairie, Texas 75051 Lewisville, Texas 75067-0248' ITEM I APPROXIMATE I I UNIT BID UNIT BID UNIT BID UNIT BID NO, QUANTITIES UNIT DI::SCRIPTION PRICE EXTI=NSION PRICE I::XTENSION PRICE EXTI~NSION PRICE I=XTFNSI(~N SCHEDULE 3__ASections 2A & 2C) 1B 2,665 L.F. Furnish & Install 54' RCCP (E-301) Water Line by Open Cut, w/Class 'F" Embedment $234.00 $623,610.00 $222.16 $592,056.40 $254.00 $676,910.00 $267.00 $711.555.0C B 40 L.F. Furnish & Install 54" RCCP (E-301) Water Line by Open Cut, w/Concrete Encasement $300.00 $12,000.00 $237.54 $9,501.60 $285.00 $11,400.00 $289.03 $11,561.2C 3B 150 L.F. 54" RCCP (E-301) by Other than Open Cut, w/Steel Encasement Pipe (0.75" wall) $1,200.00 $180,000.00 $1,459.30 $218,895.00 $1,531.00 $229.650.00 $1,275.00 $191,250.0C 4B 130 L.F. 54' RCCP (E-301) W.L. by Open Cut, w/Steel Encasement Pipe & Class "H' Embed. $500.00 $65,000.0C $541.11 $70,344.30 $531.00 $69,030.00 $570.00 $74.100.0C 5B 1 Ea. Furnish &Install 8' Air and Vacuum Release Valve $6,500.00 $6,500.0(] $7.763.50 $7,763.50 $8,460.00 $8,460.00 $9,000.00 $9,000.00 6B 3 Ea. Furnish & Install 54" RCCP Dished Head Plug designed for Testing $2,800.00 $8.400.0(] $5,333.86 $16,001.58 $3,000.00 $9,000.00 $4,750.00 $14,250.00 7B 1,430 S.Y. Removal and Replacement of Existing Reinforced Concrete Pavement $42.00 $60,060.0C $35.18 $50,307.40 $40.00 $57,200.00 $42.00 $60,060.00 8B 610 L.F. Full Depth Saw-Cutting Existing Reinforced Concrete Pavement $3.00 $1,830.0C $3.95 $2,409.50 $1.50 $915.00 $5.50 $3,355.00 9B 600 L.F. Construct 6" Monolithic Concrete Curb $9.00 $5,400.0(] $5.92 $3,552.0(3 $5.00 $3,000.00 $1.00 $600.00 10B 550 L.F. Removal and Rep!~_cement of Existing 8" Water Line $42.00 $23,100.0C $17.44~ $9,592.043 $15.00 $8,250.00 $25.00 $13,750.00 11B 4 Ea. Support Existing 10' or Smaller Sanitary Sewer Across Trench $1,500.00 $6,000.0(] $208.62! $834.48 $400.00 $1.600.00 $1,000.00 $4,000.00 12B 3 Ea. Support Existing 21' or Smaller Storm Sewer Across Trench $1,170.00 $3,510.00; $208.62 $625.86 $500.00 $1,500.00 $1.500.00 $4,500.00 ~,B 160 LF. Removal and Replacement of Barbed Wire Fence $4.00 . $540.00 $3.95 $632.0C $5.50 $880.00 $6.00 $960.00 14B 10 C.Y. iFurnish &Install Extra Crushed Stone for Embedmerit $12.00 $120.00 $111.50 $1,115.6C $16.00 $160.00 $50.00 $500.00. 15B 10 C.Y. Furnish &Install Extra 2000 PSI Concrete for Embedment $100.00; $1,000.00 $112.77 $1,127.7C $50.00 $500.00 $125.00 $1,250.00 16B 1 Ea. Furnish &Install Cathedic Test Station $500.00~ $500.00 $251.47 $251.47 $1,000.00 $1.000.00 $1,000.00 $1.000.00 17B 5,410 L.F. Furnish &Install Erosion Protection Devices $2.00! $10,820.00 $1.41 $7,628.1C $2.00 $10,820.00 $2.00 $10,820.00 18B 2,835 L.F. !Designing and Providing Trench Safety Systems $10.00; $28,350.00 $9.14 $25,911.9~ $0.75 $2,126.25 $1.00 $2,835.00 i AMOU NT BI~D;.. (Schedule B - Items 1B Through 18B) $1,036,840.00 $1,018,550.39 $1,092,401.25 $1,115,346.20 Calendar Days ' 100 100 100 100 Deduct fo~Aw.ard of Both Schedules A & B ($5,000.00' ($10.000.0~ $0.00 $0.00 Total AmounJ.,Bid Award Both Schedules (Sch. A + Sch. B - Deduct) $2,031,993.00 $2,049.767.53 ~;2.t63.821.00 $2.119,562.70 Page2of4 TABULATION OF BIDS ~ aID OF mO OF DATE: February 9, 1996 PROJECT: CITY OF IRVING, TEXAS SHIMEK, JACOBS & FINKLFA Oscar Renda Contracting, Inc. Gamey Companies, Inc. Bar Construdors, Inc. Dallas Water Supply Line No. 3 CONSULTING ENGINEERS #7 Benson Lane 1331 N.W. Vivion Road P.O. Box 10 Sections 3b, 2a & 2c Dallas, Texas Roanoke, Texas 76262 Kansas City. Missouri 64118 Lancaster, Texas 75146 ITEM ~ APPROXIMATE J 4 UNIT BID UNIT BID UNIT BID NO. QUANTITIES UNIT DESCRIPTION PRICE EXTENSION PRICE FXTENSION PRICE EXTENSION SCHEDULE ~ (Section 3B) 1A 2,245 L.F. Furnish & Install 60' RCCP (E-301) Water Line by Open Cut w/Embedment $287.00 $644,315.00 $338.00 $758,810.09_ $390.00 $875,550.00 _A 40 L.F. 60' RCCP (E-301) W.L. other than Open Cut, w/Steel Encasement Pipe (0.438' wall) $1,600.00 $64,000.00 $1,600.00 $64,000.00 $1,490.00 $59,600.00 3A 185 L.F. 60' RCCP (E-301) W.L. other than Open Cut, w/Steel Encasement Pipe (0.875" wall) $1,800.00 $333,000.00 $1,700.00 $314,500.00 $1,480.00 $273,800.00 4A 1 Ea. Furnish &Install 48' Butterfly Valve together w/Manhole $38,000.00 $38.000.00 $25,000.00 $25,000.00 $22,000.00 $22,000.00 5A 1 Ea. Construct 10' Blow-offValve w/Manhole $7,500.00 $7,500.00 $10,000.00 $10,000.00 $5,600.00 $5,600.00 6A 1 Ea. Construct 8' Air and Vacuum Release Valve w/Manhole $9,000.00 $9,000.00 $9,000.00 $9,000.00 $8,400.00 $8,400.00 7A 1 L.S.. Furnish &Install 60" RCCP Dished Head Plug designed for Testing $3,400.00 $3,400.00 $4,0(~0.00 $4,000.00 $3,300.00 $3,300.00 8A 1 L.S. Remove, Salvage and Reconstruct Existing Brick Sign $5,000.00 $5,000.00 $4,000.00 $4,000.00 $7,500.00 $7,500.00 9A 435 S.Y. Removal and Replacement of Existing Gravel Ddve $8.00 $3,480.00 $5.00 $2,175.00 $7.00 $3,045.00 10A 205 LF. Removal and Replacement of Barbed Wire Fence $2:00 $410.00 $4.00 $820.00 $2.50 $512.50 11A 42 L.F. Removal and Replacement of Hog Wire Fence $3.00 $126.00 $10.00 $420.00 $5.00 $210.00 ,2A 1 Ea. Furnish &Install Cathodic Test Station $250.00 $250.00 $500.00 $500.00 $500.00 $500.00 13A 10 C.Y. Furnish &Install Extra Crushed Stone for Embedment $17.00 $170.00 $50.00 $500.00 $20.00 $200.00 14A 10 C.Y. Furnish &Install Extra 2000 PSI Concrete for Embedment $60.00 $600.00 $300.00 $3,000.00 $60.00 $600.00 15A 4,490 LF. Furnish &Install Erosion Protection Devices $2.00 $8,980.00 $2.00 $8,980.00 $1.50 $6,735.00 16A 2,245 L.F. Designing and Providing Trench Safety Systems $2.00 $4,490.00 $1.00 $2,245.00 $3.00 $6,735.00 ~.MOU NT BID: (Schedule A - Items 1A Through 16A) $1,122,721.00 $1,207,950.00 $1,274,287.50 Calendar Days ' 100 100 - - - P~3of4 TABULATION OF BIDS roD_fiE mO_O~ DATE: February 9, 1996 PROJECT: CITY OF IRVING, TEXAS SHIMEK, JACOBS & FINKLEA Oscar Rends Contracting, Inc. Gamey Companies, Inc. Bar Constructors. Inc. Dallas Water Supply Line No. 3 CONSULTING ENGINEERS #7 Senson Lane 1331 N.W. Vivion Road P.O. Box 10 Sections 3b, 2a & 2c Dallas, Texas Roanoke, Texas 76262 Kansas City. Missouri ,54118 Lancaster, Texas 75146 QUANTITIE$ UNIT DI::SCRIPTICIN PRICE I~XTENSIQN PRICE I=XTENSIC)N PRICE EXTENSION SCHEDULE B (SacMona 2A & 2C) 1B 2,665 L.F. Furnish & Install 54" RCCP (E-301) Water Line by Open Cut~ w/Class 'F" Embedment $280.00 $746,200.0(3 $323.00 $860,795.0C $347.00 $924.755.00 B 40 L.F. Furnish & Inst~il ,54' RCCP (E-301) Water Line by Open Cut~ w/Concrete Encasement $344.00 $13,760.04; $500.00 $20,000.0C $350.00 $14,000.00 38 150 L.F. ,54' RCCP (E-501) by Other than Open Cut, w/Steel Encasernent Pipe {0.75' wall) $1,600.00 $240~000.0C $1,500.00 $225,000.0C $1.254.00 $188,100.00 4B 130 LF. ,54' RCCP (E-301) W.L by Open Cut, w/Steel En¢~__e~ment Pipe & Class 'H' Embed. $1,200.00 $150,000.0C $750.00 $97,500.00; $652.00 $84~760.00 58 1 Ea. Furnish & Inst~!! 8' Air and Vacuum Reieass Valve $7,000.00 $7,000.00; $9,000.00 $9.000.00! $8,400.00 $8,400.00 6B 3 Ea. Furnish & Inst-._!; .54' RCCP Dished Head Plug designed for Testing $3,000.00 $9e000.00 $3~500.00 $10,500.00 $3,100.00 $9~300.00 7B 1,430 S.Y. Removal and Rep!_~_'~_ment of Existing Reinforced Concrete Pavement $46.00 $85,780.00 $30.00 $42,900.00 $29.00 $41,470.00 8B 610 L.F. Full Depth Saw-Cuffing Existing Reinforced Concrete Pavement $4.00 $2,440.00 $4.00 $2,440.00 $4.50 $2,745.00 96 600 LF. Construct 6' Monoltthlc Concrete Curb $3.00 $1~800.00 $10.00 $6,000.00 $3.60 $2J60.00 10B 550 L.F. Removal and Ft.e~!=__ce_ment of Existing 8' Water Line $30.00 $16~500.00 $25.00 $13,750.00 $20.00 $11,000.0C 11B 4 Ea. Suppod Existing 10' or Smaller Sanitary Sewer Across Trench $800.00 $3,200.00 $400.00 $1,600.00 $560.00 $2,240.0(] 12B 3 Ea. Support Existing 21 ' or Smaller Storm Sewer Across Trench $1,000.00 $3,000.00 $600.00 $1 ~800.00 $700.00 $2,100.0C 38 160 LF. Removal and Replacement of Barbed Wire Fence $2.00 $320.00 $4.00 $640.00 $2.50 14B 10 C.Y. Furnish &Install Extra Crushed Stone for Embedment $17.00 $170.00 $50.00 $500.00 $20.00 $200.0C 158 10 C.Y. Furnish &Install Extra 2000 PSI Concrete for Embedment $60.00 $600.00 $300.00 $3,000.00 $60.00 $600.0C 1613 1 Ea. :Furnish &Install Cathodic Test Station $250.00 $250.00 $500.00 $500.00 $500.00 $500.0C 17B 5,410 L.F. Furnish &Install Erosion Protection Devices $2.00 $10,820.00 $2.00 $10F820.00 $1.50 $8,115.0C 18B 2,835 L.F. Designing and Providing Trench Safety Systems $2.00 $5~670.00 $1.00 $2,835.00 $3.00 $8F505.0C AMOUNT BID: (Schedule B - Items 1B Through 18B) $1,282~510.00 $1~309,580.00 $1~309,350.0C Calendar Days · 100 100 - - - Deduct for Averd of Both Schedules A & B ($70~000.00 ($40,000.00 ($20,000.0C , Total Amount Bid Awa~ Both Schedules (Sch. A 4. Sch. B - Deduct) S2.336.231.00 $l,477.630.00 $2.563.637.50] Pege4~4