Loading...
Alexander Ct-SY0705232010) Ken Griffin - Grapevine Creek /Alexander Court LOMR Review Page 1 From: <brad.pickering @kimley- horn.com> To: <kgriffin @ci.coppell.tx.us> CC: < Steve . Gal loway @kimley- horn.com > , <Ebenezer.chiluka @kimley- horn.com >, <n... Date: 5/23/2007 5:06 PM Subject: Grapevine Creek /Alexander Court LOMR Review Attachments: 20070523. pdf Ken: As discussed this afternoon with Nadia Dahab, attached are KHA's comments for the Grapevine Creek LOMR application for Alexander Court, dated April 26, 2007, prepared by Nathan D. Maier Consulting Engineers, Inc. If you have any questions regarding the attached comments, please do not hesitate to give us a call. Thank you, Brad W. Pickering, EIT (IN), CFM Kimley -Horn and Associates, Inc. 12700 Park Central Drive, Suite 1800 Dallas, TX 75251 p: (972) 776 -1781 f: (972) 239 -3820 e: brad.pickering @kimley - horn.com P PPP' Kimle bhbh., and Associates, Inc, Ma 23, 2007 Mr. Kenneth M. Griffin, P. E. Director of En Works 255 Parkwa BOUlevard Coppell, TX 75019 RE: Letter of Ma Revision ( LOMR ) Review Grapevine CreeklAlexander Court V KHA No.. 063124008 Dear Mr. Griffin: Kimle and Associates, Inc. (KHA has performed the first review of the Grapevine Creek I ,OM R application for Alexander Court, dated April 26, 2007, prepared b Nathan D. Maier Consultin En Inc. ( NI)MCE), KRA reviewed the document for adherence to currentl published Cit of Coppell and Federal Emer Mana A (FEMA draina desi g uidelines. KHA recommends that l CE address the followin items: 1. The MT-2 Form 2, pa I of 2, states that the upstream tie-in of the stud is at cross section 27620. Cross section 27900 has been added to the revised existin conditions model and is not included in the effective model. Revise the forms to reflect an effective tie-in upstream of the model modifications. 2. Revise the Floodplain Work Map to include the benchmarks and vertical datum used for the on- surve 3. The water surface elevations table in the report text is not consistent with the modelin output for the effective floodwa III "- RA model. Revise the report to be consistent with the modelin output. L_� A 4. Revise the Location Map to reflect the boundaries of the LOMR submittal. 5. Cross section 22600, the location of the downstream effective tie -in. is not shown on the Floodplain Work Map. Revise the workmap, to show this cross section. ■ Suite 1800 1 2700 Park Central Drive Dallas, Texas 75251 0 TEL 972 770 1300 FAX 972 239 3820 Mr. Kenneth M. Griffin Kimley-Nora Ma 23, 2007 . � and Associatos, Inc. Pa 2 of 2 6. The sum of reach len for the .H -R revised condition model does not match the sum of the reach len in the FL MA effective model. Revise the reach len in the revised condition model or explain this discrepanc 7. The report text states that Mannin s n values were taken from the effective model, but the var from the effective model at multiple locations. Revise the model to be consistent with the effective modelinia or j ustif y the proposed Mannin `n values. S. Propert owner notification is re b N'FIP re 65.7(b)(1) due to the floodwa revision. The notices must include the extent of revision, the chan to the floodwa and contact information for an interested parties. 9. Revise the le on the Floodplain Work Map to reflect revised existin conditions and not proposed conditions. 10. Future development aqjacent to the subject reach shall respect both the I 00- full developed and FE MA effective floodplain boundaries. Please note that an future development adjacent to the subject reach will need to compl with all of the provisions set forth in the ordinances of the Cit of Coppell includin but not limited to the Subdivision Ordinance, Zonin 4 Ordinance,, and Floodplain Mana Ordinance. If y ou have an q uestions re the comments included in this letter, please feel free to contact us at 972.770.1300. Sincerel KIMLEY-HORN AND ASSOCIATES, INC. r 97 Brad i c 7ke nin L Steven D. alloy C a P. FM Brad g ., rE I T, C FM Cj-\HYDRO\PROJECTS\63124008\Alex and er Court\210070521doc