ST8601-CS 880204DANNENBAUM ENGINEERING CORPORATION
79.50 ELMBROOK DRIVE. SUITE 2.~) DALLAS. TEXAS 75247 (214) 638-0145
February 4, 1988
City of Coppell
255 Parkway Blvd.
P.O. Box 478
Coppell, Texas 75019
Attn: Ms. Taryon Bowman
Zoning Coordinator
Dear Ms. Bo~an:
We herewith submit five (5) sets of preliminary plans for the extension of
MacArthur Boulevard from the DeForest Road intersection north across Denton
Creek to match the existing MacArthur Boulevard in the Vista Ridge
Development. South of Denton Creek, the preliminary plat reflects the
right-of-way as determined by Ginn, Inc. We understand that acquisition of
this land by the City of Coppell is currently underway. Please note that
additional slope easements and temporary construction easements will be
required. The right-of-way north of the creek owned by Vista Mortgage &
Realty, Inc., will be dedicated during the platting process.
We are also submitting a preliminary bridge layout for the Denton Creek
bridge, a proposed six-lane structure. In addition, we have furnished details
for architectural treatment consistent with the existing bridge structure at
the north end of the project.
Your review and comments regarding this proposed thoroughfare improvement
are greatly appreciated. We are available to meet with you, at your
convenience, to discuss this project.
Very truly yours,
DANNEN! UM ENGINEERING CORPORATION
Phil Deaton, P.E.
Project Manager
PD;BSR;kn:O508PD
2201-32
Enclosure