Loading...
Duke Lesley 3A-LR100111��+ 8908 Ambassador Row, Dallas, TX 75247 Ro n e Engineering �- D 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressiv St Test Client: Duke Construction, LP Report No.: 365813 14241 Dallas Pkwy, Ste 1000 Z) Project No.: 0915747 Dallas, TX 75254 -2936 � Date of Service: 01/02/2010 Report Date: 01/11/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3% Test Method: ASTM C -172 4.0 ASTM C -31 (except 10.1.2) 32 °F ASTM C -143 94,130 ASTM C -231 1118 ASTM C -1064 28 ASTM C -138 5.5% ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/02/2010 Date Slump Weather Conditions: Clear Strength Fracture (inches) Time Sampled: 07:55am Batch time: 07:01 am 4.0 Temperature - Air: 32 °F Concrete: 48 °F 94,130 Truck No: 1118 Ticket No: 6364000 28 Air Content: 5.5% Unit Weight (pcf): NA 01/30/2010 Overall Placement Location: Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner of Pour #1 Sample Location: 194' south, 25' east of northwest corner of Pour #1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 01/09/2010 7 5.99 28.18 94,130 3,340 Type 5 1 2 01/30/2010 28 1 3 01/30/2010 28 4 02/27/2010 56 JAI R- [IL] � ] Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW ) Page 1 of 4 8908 Ambassador Row, Dallas, TX 75247 Ro n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Rep ort of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365813 Project No.: 0915747 Date of Service: 01/02/2010 Report Date: 01/11/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3% Test Method: ASTM C -172 4.5 ASTM C -31 (except 10.1.2) 44 °F ASTM C -143 ASTM C -231 9127 ASTM C -1064 ASTM C -138 4.8% ASTM C -39 Mix Design I.D.: 1621 Cylinder Maximum Measured Placement Date: 01/02/2010 Set No. Tested (days) (in) (in') (Ibs) Slump Weather Conditions: Clear 4,120 Type 2 (inches) Time Sampled: 09:00am Batch time: 08:15am 4.5 Temperature - Air: 44 °F Concrete: 55 °F Truck No: 9127 Ticket No: 6364012 Air Content: 4.8% Unit Weight (pcf): NA Overall Placement Location: Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner of Pour #1 Sample Location: 230' south, 75' east of northwest corner of Pour #1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 01/30/2010 Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 01/09/2010 7 5.99 28.18 116,100 4,120 Type 2 2 2 01/30/2010 28 2 3 01/30/2010 28� 2 4 02/27/2010 56 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 2 of 4 8908 Ambassador Row, Dallas, TX 75247 Ro n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365813 Project No.: 0915747 Date of Service: 01/02/2010 Report Date: 01/11/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3%-6% Test Method: ASTM C -172 Truck No: 1039 ASTM C -31 (except 10.1.2) ASTM C -143 Unit Weight (pcf): NA ASTM C -231 Overall Placement Location: ASTM C -1064 ASTM C -138 corner ASTM C -39 Mix Design I.D.: 1621 01/30/2010 Measured Placement Date: 01/02/2010 Marked Date Age Diameter Area Load Slump Weather Conditions: Clear (psi) Type (inches) Time Sampled: 10:30am Batch time: 09:16am 4.0 Temperature - Air: 49 °F Concrete: 59 °F Truck No: 1039 Ticket No: 6364017 Air Content: 4.6% Unit Weight (pcf): NA Overall Placement Location: Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner of Pour #1 Sample Location: 270' south, 140' east of northwest corner of Pour #1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 01/30/2010 Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 01/09/2010 7 5.99 28.18 106,980 3,800 Type 2 3 2 01/30/2010 28 3 3 01/30/2010 28 3 4 02/27/2010 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 3 of 4 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 3 of 4 8908 Ambassador Row, Dallas, TX 75247 Rone Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 R eport of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365813 Project No.: 0915747 Date of Service: 01/02/2010 Report Date: 01/11/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3% Test Method: ASTM C -172 Strength Fracture ASTM C -31 (except 10.1.2) Ticket No: 6364023 ASTM C -143 Air Content: 4.8% ASTM C -231 4 1 ASTM C -1064 7 ASTM C -138 Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/02/2010 Slump Weather Conditions: Clear Type 2 (inches) Time Sampled: 11:45am Batch time: 10:08am 3.75 Temperature - Air: 50 °F Concrete: 60 °F Strength Fracture Truck No: 1019 Ticket No: 6364023 (days) Air Content: 4.8% Unit Weight (pcf): NA 4 1 Overall Placement Location: 7 5.99 28.18 99,060 Paving, Pour #2 (142' x 165') 191' to 133' south and 0' to 165' east of northwest corner of Pour #1 01/30/2010 28 Sample Location: 1 .. 4 3 315' south, 145' east of Pour #1, northwest corner 28 REPORT OF TESTS 4 4 02/27/2010 56 U-41 I Concrete Compressive Cylinder 6" x 12" Cylinder Type 1 Type 2 Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in =) (Ibs) (psi) Type 4 1 01/09/2010 7 5.99 28.18 99,060 3,520 Type 6 4 2 01/30/2010 28 4 3 01/30/2010 28 4 4 02/27/2010 56 U-41 I �] L1.1 F Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Technician: Richard Bullion Started: 07:00am Finished: 01:00pm Rona En ineerin Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Ms. Ashley Hair (1 -ec copy) 1 -ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1 -ec Rone Project Manager Attn: Mr. K. Scott Watson AET 1 -ec City of Coppell Attn: Mr. Lee Stone 9 9 K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 4 of 4