Loading...
Duke Lesley 3A-LR1001078908 Ambassador Row, Dallas, TX 75247 Rone Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Rei Steel In spection Client: Duke Construction, LP Report No.: 365812 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/02/2010 Report Date: 01/07/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving, Pour #2 (142' x 165'), 191' to 333' south and 0' to 165' east of northwest corner of Pour #1 Items Inspected: Conforming Non Conforming Items Inspected: Conforming Non Conforming Items Inspected: Conforming Non Conforming Placing Drawings Approved x Bar Length and Shape x Column Ties Properly Tied and Spaced NA Bar Size x P roper Bar P lacemenl x Stirrup Spacing NA Bar Grade x Properly Tied x Stirrup Type NA Bars Clean x Dowel Bars in P lace x Lapped Splices x Form Clean x Proper Bar Supports x CornerBars NA Numberof Bars x Proper Cover x M echanical Splices NA Discrepancies/ Comment No apparent discrepancies were noted at the locations listed above. Technician: Richard Bullion Started: 05:15am Finished: 07:00am Rone Engineering Report Distribution: Ong: Duke Construction, LP (Dallas, TX) - - -- Attn: Ms. Ashley Hair (1 -ec copy) 1 -ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1 -ec Rone Project Manager Attn: Mr. K. Scott Watson AET K. Scott Watson, AET 1 -ec City of Coppell Attn: Mr. Lee Stone Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 1 of 1 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Cylinder Collection Client: Duke Construction, LP Report No.: 365817 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/04/2010 Report Date: 01/07/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Pick Up Compressive Strength Test Specimens Cast Prior To This Date Report of Collection On this date, a Rone Engineering Services, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimens cast prior to this date. Technician: Jose Villanueva Started Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Ms. Ashley Hair (1 -ec copy) 1 -ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1 -ec Rone Project Manager Attn: Mr. K. Scott Watson AET 1 -ec City of Coppell Attn: Mr. Lee Stone 08:15am Finished: 09:45am Rone Engineering K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW ) Page 1 of 1