Loading...
Coppell Heights 9-CS100127U MetroBank, N. A. Letter of Credit .Department 960 Bellaire Blvd., Suite 252 / gouston 9 Texas 77036 IRREVOCABLE STANDBY LETTER OF CREDIT INTO. SBMP- xxxxxxxx San. .. , 701 o Beneficiary: City of Coppell 255 Parkway, P O box 9478 Coppell, Tx 75019 Re. Constructioniof Coppell He 4ts 4de(;t1'6n,4t 915 C Lf,*A £e Standby 1A of Credit No: SBMB-xxxxxxx Applicant: MJR Engineering, Inc. r Expiration Date: ice -H - -- "Two years'Frbou olQte, &f tina1 &ceePts,i►ct—leltct � r OM City Gentlemen: We, MetroBank N.A. Houston Tex as hereby establish our Irrevocable Standby Letter of Credit No. SBMP -xxxx in your favor and for account of MJR Engineering, Inc for an aggregate amount of US$30,400.00 (U.S. Dollars Thirty Thousand Four Hundred and 00 /100 Only), available to Beneficiary by draft drawn at sight on MetroBank N.A. Houston, Texas accompanied by the following documents: 1. A Signed statement by the City Manager of the City of Coppell or the City Manager's designee, stating that' "we certify that MJR Engineering, Inc. has failed to fulfill their contractual obligations under the constructiont(f. va ra M a hts. And 1� 2. The original of this Standy Letter of Credit and Amendments, if any. by Page 1 of 2 Page 2 of 2 MetroBank, N. A. Letter of Credit Department 9600 Bellaire Blvd., .Suite 252 Houston, Texas 77036 Irrevocable Standby Letter Of Credit NO. SBMP- 93500290 City of Coppell Additional Conditions: 1 Partial draws under this Letter of Credit are allowed. 2 Draft drawn under this Standby Letter of Credit must bear the following clause: "Drawn under MetroBank N.A. Houston Texas Letter of Credit No. SBMP- xxxxxx dated Dec. xx, 2009 We hereby engage with you. that all drafts drawn under and in compliance with the terms of this credit, will be duly honored if presented at this office (9600 Bellaire Blvd. Suite 252, Houston, Texas 77036) on or before wee. Te rafliDn date (tw �learsfrom date OR Vr4( aeceP'raMte— I fro M d I}y. ',jr, This Standby Letter of Credit is subject to "The (,uniform Customs and Q„Pw� P ice for D6cumentary Credits (2007 Revision) International Chamber of Commerce Publication No. 600. MetroBank, N. A. Authorized Signature Authorized Signature Stephen Liao /V.P. Judy Huang/Banking Officer M LH En g^ New Construction & Engineering - Environmental Services DATE: DEC 21, 2009 SITE: 920 S BELT LINE, COPPELL, TX PAVEMENT DETAILS 3 DRIVEWAY APPROACHES & SIDEWALK (TOTAL APPROX CONCRETE AREA = 5260 SFT) COST OF MATERIALS $13,150.00 LABOR $6,575.00 TOTAL $19,725.00 MEDIAN OPENING (APPROXIMATE PAVEMENT AREA 4260 SQ FT) LIME TREATMENT $1,770.00 COST OF CONCRETE MATERIALS $12,780.00 BARRICADE $5,400.00 LABOR $8,200.00 TOTAL $28,150.00 STAMPED CONCRETE (APPROXIMATE CONCRETE AREA 1100 SFT) COST OF MATERIALS $7,975.00 LABOR $4,950.00 TOTAL $12,925.00 GRAND TOTAL $60,800.00 www.mjrconstructions.com p :469.544.8150 1 f: 972.767.3003 LLmlamal6l@gmail.com I 795 Pinkerton Ct. P lano , Texas 75025