Duke Lesley-CS100125 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to File From: Larry Davis, Construction Inspector Date: February 4, 2010 RE: Duke Lesley Infrastructure Pavement Failure This week, January 25, 2010, the contractor for the Project (Lacy Construction) was notified of pavement failure; the work should be done in approximately 2 weeks (depending on weather conditions). "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"