Loading...
SS9402A-CS 960830August 30, 1996 Mr. Kenneth .Griffin, P.E. Assistant City Manager/City Engineer 255 Parkway Blvd. CoppeR, Texas 75019 Pro~ Re: Grapevine Creek Sanitary Sewer Coppell, Texas HDR No 08015-001-037 09-03-96 P03:19 Dear Mr. Griffin: We have received your letter of August 26, 1996 regarding the proposed relocation of the sewer line that currently crosses the North Lake Nursery property. As we have told you oo previous occasions, we are prepared to complete the design drawings necessary for tl~ sewer line relocation under the rail linc and into the neighborhood sewer at no additional cost to the City. In addition to providing these services, the $5,709.00 HDR committed toward the previous revision remains available toward an alternate routing construction. Sincerely, HDR ENGIN~-~RING, INC. Project Manager HDR Engineering, Inc. Telephone Engineering 21498O4OOO Fax 214 960.4471