Duke Lesley 3A-LR100121Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 366256 Project No.: 0915747 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: amsung -Point West VII Parking Lot Expansion �Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air ( %): NA Test Method: ASTM C -172 Temperature - Air: ASTM C -31 (except 10.1.2) Concrete: 46 °F ASTM C -143 Truck No: ASTM C -231 Ticket No: 3272775 ASTM C -1064 Air Content: ASTM C -138 Unit Weight (pcf): NA ASTM C -39 Mix Design I.D.: 1621 Marked Measured Placement Date: 01/13/2010 1 1 Slump Weather Conditions: Clear 02/10/2010 (inches) Time Sampled: 05:30am Batch time: 04:54am 6.0 Temperature - Air: 30 °F Concrete: 46 °F Truck No: 9105 Ticket No: 3272775 Air Content: 1.6% Unit Weight (pcf): NA Overall Placement Location: Parking expansion /paving, paving starting from Dividend and going to the 2nd island (center curb) Sample Location: 2nd island from side street, center curb, 2' south, 3' west REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Marked Date Set No. Tested 1 1 0112012010 1 2 02/10/2010 1 3 02/10/2010 Age Diameter (days) (in) J 7 6.00 28 28 1 4 03/10/2010 56 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 11z41a °i o Maximum Area Load (in') (lbs) 28.27 114,610 Compressive Strength (psi) 4,050 Fracture Type Type 5 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 1 of 12 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 366256 Project No.: 0915747 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 2 of 12 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 366256 Project No.: 0915747 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air ( %): NA Test Method: ASTM C -172 28 ASTM C -31 (except 10.1.2) 02/10/2010 ASTM C -143 2 4 ASTM C -231 56 ASTM C -1064 ASTM C -138 ASTM C -39 Cylinder Measured —� Marked Date Age / Set No. Tested (days) 2 1 01/20/2010 7 G 2 2 02/10/2010 28 2 3 02/10/2010 28 2 4 03/10/2010 56 Mix Design I.D.: 1621 Measured Placement Date: 01/13/2010 Slump Weather Conditions: Partly cloudy (inches) Time Sampled: 06:20am Batch time: 05:25am 6.0 Temperature - Air: 30 °F Concrete: 44 °F Truck No: 1049 Ticket No: 3272778 Air Content: 1.4% Unit Weight (pcf): NA Overall Placement Location: Parking expansion /paving, paving starting from Dividend and going to the 2nd island (center curb) Sample Location: 2nd island from side street, 8' south, 7' west from center curb REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Diameter Area Load (in) (in') (Ibs) 6.00 28.27 106,690 �_d Id LJI I1 I 1 1 .1 r Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Compressive Strength Fracture (psi) Type 3,770 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 3 of 12 8908 Ambassador Row, Dallas, TX 75247 R o n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 366256 Project No.: 0915747 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 4 of 12 8908 Ambassador Row, Dallas, TX 75247 R o n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 366256 Project No.: 0915747 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 3 Specification Requirements 6.25 Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air ( %): NA Test Method: ASTM C -172 Parking expansion /paving, paving starting from Dividend and going to the 2nd island ASTM C -31 (except 10.1.2) ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/13/2010 Slump Weather Conditions: Partly cloudy (inches) Time Sampled: 07:27am Batch time: 06:31 am 6.25 Temperature - Air: 30 °F Concrete: 45 °F Truck No: 5016 Ticket No: 7213746 Air Content: 1.1% Unit Weight (pcf): NA Overall Placement Location: Parking expansion /paving, paving starting from Dividend and going to the 2nd island (center curb) Sample Location: 1st entrance from side street island, 15' north, 5' east REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 01/20/2010 �: 77 6.00 28.27 97,250 3,440 Type 2 3 2 02/10/2010 ` 3 3 02/10/2010 28 3 4 03/10/2010 56 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 5 of 12 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 366256 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 6 of 12 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 366256 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air ( %): NA Test Method: ASTM C -172 ASTM C -31 (except 10.1.2) (center curb) ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/13/2010 Slump Weather Conditions: Partly cloudy (inches) Time Sampled: 08:30am Batch time: 07:25am 5.25 Temperature - Air: 30 °F Concrete: 48 °F Set No. Tested (days) (in) (in') (lbs) Truck No: 3012 Ticket No: 7213753 Type Air Content: 1.5% Unit Weight (pcf): NA 4,620 Overall Placement Location: Parking expansion /paving, paving starting from Dividend and going to the 2nd island (center curb) Sample Location: Southeast corner curb, 2' north, 3' west REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 02/10/2010 28 Cylinder Maximum Compressive 28 Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (lbs) (psi) Type 4 1 01/20/2010 7 6.00 28.27 130,640 4,620 Type 2 4 2 02/10/2010 28 4 3 02/10/2010 28 4 4 03/10/2010 56 9 Ll L-IL'i I Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 7 of 12 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 366256 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 8 of 12 Ro n e Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas. TX 75254 -2936 Report No.: 366256 Project No.: 0915747 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (irl 4" - 6" Air ( %): NA Test Method: ASTM C -172 ASTM C -31 (except 10.1.2) (center curb) ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/13/2010 Slump Weather Conditions: Partly cloudy (inches) Time Sampled: 10:45am Batch time: 09:46am 6.5 Temperature -Air: 38 °F Concrete: 46 °F 4,460 Type 5 Truck No: 7060 Ticket No: 7213768 Air Content: 1.2% Unit Weight (pcf): NA Overall Placement Location: Parking expansion /paving, paving starting from Dividend and going to the 2nd island (center curb) Sample Location: Southwest corner, 9' north, 2' east REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 02/10/2010 Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 01/20/2010 7 6.00 28.27 126,030 4,460 Type 5 5 2 02/10/2010 28 5 3 02/10/2010 28 5 4 03/10/2010 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 9 of 12 4 r J- " � � 1. Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 9 of 12 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 366256 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 15 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 10 of 12 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 366256 Project No.: 0915747 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air ( %): NA Test Method: ASTM C -172 Overall Placement Location: ASTM C -31 (except 10.1.2) Parking expansion /paving, paving starting from Dividend and going to the 2nd island ASTM C -143 4,640 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Mix Design I.D.: 1621 Measured Placement Date: 01/13/2010 Slump Weather Conditions: Partly cloudy (inches) Time Sampled: 12:45pm Batch time: 12:14pm 6.0 Temperature - Air: 45 °F Concrete: 54 °F Diameter Area Load Truck No: 3012 Ticket No: 7213785 Fracture Air Content: 1.0% Unit Weight (pcf): NA (in) (in') (Ibs) Overall Placement Location: Type Parking expansion /paving, paving starting from Dividend and going to the 2nd island (center curb) 4,640 Sample Location: Northwest corner curb, 2' south, 2' east REPORT OF TESTS 6 2 Concrete Compressive Cylinder 6" x 12" 28 6 3 Cylinder Maximum Compressive 03/10/2010 Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 6 1 01/20/2010 7 6.00 28.27 131,320 4,640 Type 5 6 2 02/10/2010 28 6 3 02/10/2010 28 6 4 03/10/2010 56 IM L�d ald" �11 [_ JLI C Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (KW /KW) Page 11 of 12 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 366256 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 01/13/2010 Report Date: 01/21/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Technician: Henry Nichols Started: 04:30am Finished: 01:30pm Rone Engineering Report Distribution: Ong: Duke Construction, LP (Dallas, TX) -- Attn: Ms. Ashley Hair (1 -ec copy) _ 1-ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1 -ec Rone Project Manager Attn: Mr. K. Scott Watson AET K. Scott Watson, AET 1 -ec City of Coppell Attn: Mr. Lee Stone Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW /KW) Page 12 of 12