Loading...
ST0501-CS100128ST05 -01 Deforest Road Reconstruction Meeting Agenda for 1 -28 -10 1�G V p roo �. o(L) `U* i V%- , Gem,.. 1) Drainage — A. We will not be tearing out the existing concrete and the screen wall. B. Why are we not using a�0 min time of concentr i '? As Half used on Deforest Court? Based on the meeting notes fro ay 2008, GSWW was to try to redesign the system using t L & TC from the Deforest Court plans. (447.2 & 30 min). V C. Several options have been reviewed: a. Remove 36" under asphalt & replace with 48" • HGL max above TC = 2.88 ft b. Remove 36" under asphalt & replace with 48" & Remove Windsor Estates tie into end of pipe. • HGL max above TC = 2.29 ft c. Remove 36" under asphalt & replace with 48" & Remove 36" from Sta 2 +75 to end with 48 ", leaving a section of 36" under concrete & screen wall. a HGL = 0.48 ft below TC d. Install parallel 36" under asphalt, leave 36" under concrete & screen wall, and install parallel 36" from Sta 2 +75 to end. (will need junction boxes at changes from two pipes to one. • HGL below TC 2) Timeline to complete plans? g t C sec 4 << C 6 1 ea vS.S j s[ vt�r "CA" ypono ' Ve c // .>e c. >o� f �n 0 �s lr H } o No 4 �. / G,.'F Cl Ct J 1"/PB � c�i r. �. ? � �� t- ! o� u• i n ✓ r.,.., r V is mac; c , � u 11