(3/4/2010) Keith Marvin - Re: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest RoadPage 1
From: George Marshall
To:DeGroot, Dan
CC:Garza, Michael; Griffin, Ken; Marvin, Keith
Date: 2/4/2010 4:16 PM
Subject: Re: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest Road
Dan,
I have reviewed your contract amendment #2. Please send us additional documentation & detail on the additional 172
hours. Some of the items listed we would expect to be included within the original contract. We want to treat you fairly and
pay for additional services, however we can not approve this request as is.
Thank You,
George Marshall, PE
George Marshall, P.E.
City of Coppell
Engineering
972-304-3562
>>> "DeGroot, Dan" <ddegroot@burnip.com> 2/4/2010 2:29 PM >>>
George: this is what I have put together for the contract amendment for drainage. Let me know if it will do. If it is ok, I
can sign and send originals.
________________________________
Note:
These electronic documents are provided by Burgess & Niple (B&N) as a convenience to our clients.
The official document is available as a manually signed, initialed, or sealed hard copy. If there is a discrepancy between
electronic files and the hard copies, the hard copies shall prevail.
It is our professional opinion that this electronic information provides information current as of the date of its release. Any
use of this information is at the sole risk and liability of the user. The user is responsible for updating information to reflect
any changes in the information following the preparation date of this transmittal.
The delivery of this information in electronic format is for the benefit of the owner for whom the services have been
performed. Nothing in the transfer should be construed to provide any right to third parties to rely on the information
provided, or that the use of this information implies the review and approval of Burgess & Niple.
(3/4/2010) Keith Marvin - Fwd: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest RoadPage 1
From: George Marshall
To:Garza, Michael; Griffin, Ken; Marvin, Keith
Date: 2/4/2010 3:41 PM
Subject: Fwd: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest Road
Attachments:Contract Amendment #2 2-4-2010.doc
FYI.
>>> "DeGroot, Dan" <ddegroot@burnip.com> 2/4/2010 2:29 PM >>>
George: this is what I have put together for the contract amendment for drainage. Let me know if it will do. If it is ok, I
can sign and send originals.
________________________________
Note:
These electronic documents are provided by Burgess & Niple (B&N) as a convenience to our clients.
The official document is available as a manually signed, initialed, or sealed hard copy. If there is a discrepancy between
electronic files and the hard copies, the hard copies shall prevail.
It is our professional opinion that this electronic information provides information current as of the date of its release. Any
use of this information is at the sole risk and liability of the user. The user is responsible for updating information to reflect
any changes in the information following the preparation date of this transmittal.
The delivery of this information in electronic format is for the benefit of the owner for whom the services have been
performed. Nothing in the transfer should be construed to provide any right to third parties to rely on the information
provided, or that the use of this information implies the review and approval of Burgess & Niple.
Page 1 of 1
George Marshall - Contract Amendment #2 2-4-2010.doc
From:
"DeGroot, Dan" <ddegroot@burnip.com>
To:
George Marshall <gmarshall@ci.coppell.tx.us>
Date:
2/4/2010 2:34 PM
Subject:
Contract Amendment #2 2-4-2010.doc
Attachments:
Contract Amendment #2 2-4-2010.doc
George: this is what I have put together for the contract amendment for drainage. Let me know if it will do. If it
is ok, I can sign and send originals.
Note:
These electronic documents are provided by Burgess & Niple (B&N) as a convenience to our clients.
The official document is available as a manually signed, initialed, or sealed hard copy. If there is a discrepancy
between electronic files and the hard copies, the hard copies shall prevail.
It is our professional opinion that this electronic information provides information current as of the date of its
release. Any use of this information is at the sole risk and liability of the user. The user is responsible for updating
information to reflect any changes in the information following the preparation date of this transmittal.
The delivery of this information in electronic format is for the benefit of the owner for whom the services have
been performed. Nothing in the transfer should be construed to provide any right to third parties to rely on the
information provided, or that the use of this information implies the review and approval of Burgess & Niple.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4B6ADAFBCity...2/15/2010
February 4, 2010
Mr. George Marshall, P.E.
City of Coppell
P.O. Box 9478
Coppell, TX 75019
Re:DeForest Road (MacArthur Blvd. to Windsor Estates) ST05-01
Contract Amendment #2
Dear Mr. Marshall:
We are asking the City of Coppell for amendment to our contract for the above referenced project. This
amendment No. 2 is for additional engineering services for drainage design and analysis that was not
included in the original contract. The original scope of the project had no provision for engineering
services for storm sewer design or analysis at the eastern side of the project where the existing storm sewer
outfalls to a pond before entering into Denton Creek. By recommendation of the City we excluded the cost
of this design because that area had recent improvements to the storm sewer system through private
development. After the contract was awarded further analysis was completed and concluded that the
system was not adequate to handle the 100 year rainfall event.
The following is a summary of work associated with the drainage analysis and design showing the
approximate additional hours utilized for this design:
Existing Site Analysis hours
-Site visits 10
-Review of existing record drawings 20
-Meetings/communication with City Staff 10
-Runoff computations/Drainage area maps 30
Engineering Design
-Horizontal alignment alternatives 35
-Profiles for alignment alternatives 35
-Preparation of Plans/Specification 30
-Cost estimates 2
Total Hours: 172
Attachment 1 is our effective hourly rates for engineering services. The additional time outlined above only
considers time utilized by the Associate and Project Manager for this particular project. I have based the
rate on my rate of $140.00 per hour. Therefore, 172 hours at $140.00 per hour equates to $24,080.00. If
this is acceptable to you please let me know or if you need this amendment to be in a different format.
If you have any questions regarding this letter or work performed to date, please call.
GSWW a Division of CITY OF COPPELL
Burgess & Niple, Inc.
By: By:
Dr. Steven D. Sanders, P.E. Jim Witt
Executive Vice President City Manager