ST0501-CS100204 (3/4/2010) Keith Marvin - Re: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest RoadPage 1 From: George Marshall To:DeGroot, Dan CC:Garza, Michael; Griffin, Ken; Marvin, Keith Date: 2/4/2010 4:16 PM Subject: Re: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest Road Dan, I have reviewed your contract amendment #2. Please send us additional documentation & detail on the additional 172 hours. Some of the items listed we would expect to be included within the original contract. We want to treat you fairly and pay for additional services, however we can not approve this request as is. Thank You, George Marshall, PE George Marshall, P.E. City of Coppell Engineering 972-304-3562 >>> "DeGroot, Dan" <ddegroot@burnip.com> 2/4/2010 2:29 PM >>> George: this is what I have put together for the contract amendment for drainage. Let me know if it will do. If it is ok, I can sign and send originals. ________________________________ Note: These electronic documents are provided by Burgess & Niple (B&N) as a convenience to our clients. The official document is available as a manually signed, initialed, or sealed hard copy. If there is a discrepancy between electronic files and the hard copies, the hard copies shall prevail. It is our professional opinion that this electronic information provides information current as of the date of its release. Any use of this information is at the sole risk and liability of the user. The user is responsible for updating information to reflect any changes in the information following the preparation date of this transmittal. The delivery of this information in electronic format is for the benefit of the owner for whom the services have been performed. Nothing in the transfer should be construed to provide any right to third parties to rely on the information provided, or that the use of this information implies the review and approval of Burgess & Niple. (3/4/2010) Keith Marvin - Fwd: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest RoadPage 1 From: George Marshall To:Garza, Michael; Griffin, Ken; Marvin, Keith Date: 2/4/2010 3:41 PM Subject: Fwd: Contract Amendment #2 2-4-2010.doc, ST05-01 Deforest Road Attachments:Contract Amendment #2 2-4-2010.doc FYI. >>> "DeGroot, Dan" <ddegroot@burnip.com> 2/4/2010 2:29 PM >>> George: this is what I have put together for the contract amendment for drainage. Let me know if it will do. If it is ok, I can sign and send originals. ________________________________ Note: These electronic documents are provided by Burgess & Niple (B&N) as a convenience to our clients. The official document is available as a manually signed, initialed, or sealed hard copy. If there is a discrepancy between electronic files and the hard copies, the hard copies shall prevail. It is our professional opinion that this electronic information provides information current as of the date of its release. Any use of this information is at the sole risk and liability of the user. The user is responsible for updating information to reflect any changes in the information following the preparation date of this transmittal. The delivery of this information in electronic format is for the benefit of the owner for whom the services have been performed. Nothing in the transfer should be construed to provide any right to third parties to rely on the information provided, or that the use of this information implies the review and approval of Burgess & Niple. Page 1 of 1 George Marshall - Contract Amendment #2 2-4-2010.doc From:    "DeGroot, Dan" <ddegroot@burnip.com> To:    George Marshall <gmarshall@ci.coppell.tx.us> Date:    2/4/2010 2:34 PM Subject:    Contract Amendment #2 2-4-2010.doc Attachments:    Contract Amendment #2 2-4-2010.doc   George:  this is what I have put together for the contract amendment for drainage.  Let me know if it will do.  If it is ok, I can sign and send originals. Note: These electronic documents are provided by Burgess & Niple (B&N) as a convenience to our clients. The official document is available as a manually signed, initialed, or sealed hard copy. If there is a discrepancy between electronic files and the hard copies, the hard copies shall prevail. It is our professional opinion that this electronic information provides information current as of the date of its release. Any use of this information is at the sole risk and liability of the user. The user is responsible for updating information to reflect any changes in the information following the preparation date of this transmittal. The delivery of this information in electronic format is for the benefit of the owner for whom the services have been performed. Nothing in the transfer should be construed to provide any right to third parties to rely on the information provided, or that the use of this information implies the review and approval of Burgess & Niple. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4B6ADAFBCity...2/15/2010 February 4, 2010 Mr. George Marshall, P.E. City of Coppell P.O. Box 9478 Coppell, TX 75019 Re:DeForest Road (MacArthur Blvd. to Windsor Estates) ST05-01 Contract Amendment #2 Dear Mr. Marshall: We are asking the City of Coppell for amendment to our contract for the above referenced project. This amendment No. 2 is for additional engineering services for drainage design and analysis that was not included in the original contract. The original scope of the project had no provision for engineering services for storm sewer design or analysis at the eastern side of the project where the existing storm sewer outfalls to a pond before entering into Denton Creek. By recommendation of the City we excluded the cost of this design because that area had recent improvements to the storm sewer system through private development. After the contract was awarded further analysis was completed and concluded that the system was not adequate to handle the 100 year rainfall event. The following is a summary of work associated with the drainage analysis and design showing the approximate additional hours utilized for this design: Existing Site Analysis hours -Site visits 10 -Review of existing record drawings 20 -Meetings/communication with City Staff 10 -Runoff computations/Drainage area maps 30 Engineering Design -Horizontal alignment alternatives 35 -Profiles for alignment alternatives 35 -Preparation of Plans/Specification 30 -Cost estimates 2 Total Hours: 172 Attachment 1 is our effective hourly rates for engineering services. The additional time outlined above only considers time utilized by the Associate and Project Manager for this particular project. I have based the rate on my rate of $140.00 per hour. Therefore, 172 hours at $140.00 per hour equates to $24,080.00. If this is acceptable to you please let me know or if you need this amendment to be in a different format. If you have any questions regarding this letter or work performed to date, please call. GSWW a Division of CITY OF COPPELL Burgess & Niple, Inc. By: By: Dr. Steven D. Sanders, P.E. Jim Witt Executive Vice President City Manager