Loading...
SS9402A-CS 960620 ~ ~=p~=~~ @ 2J The City With A Beautiful Future @{j) P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 20, 1996 River Valley Enterprises P.O. Box 997 Rockwall, TX 75087 RE: Grapevine III Sanitary Sewer Project (SS 94-02A) Dear Sir: The City of Coppell has completed a walk through on the referenced project. Listed below for your review and action are items that must be addressed prior to fInal acceptance of this work. 1. Sta. 41 +98, grout manhole ring, replace bolts and gasket. 2. Adjust meter cans and replace if damaged at Northlake Creative Center and Reliable Pool Supply. 3. Adjust chimney seal at Sta. 12+96. Manhole may need adjusting. 4. Clean existing manhole in concrete channel, plug line to the west and place lid on manhole. 5. Replace damaged traffIc box at Airline Drive. 6. Grade and seed areas at T. V. easement, Bethel Road, and between railroad and storage. 7. Level and sod south of Mobil and north of Chevron. 8. Provide letters from Baptist Church, TV Electric, Bank One and Chevron showing their acceptance with cleanup. 9. Submit all documents required by the contract. Thank you for your cooperation during this construction. If you have any questions, please do not hesitate to give me a call. Sincerely, a Construction Inspecto