Alexander Ct-CS0804072010) Ken Griffin - Re: Lot 11 elevations Page 1 From: Mike Boyd <mboyd @ndmce.com> To: Ken Griffin <kgriffin @ci.coppell.tx.us> CC: Rhonda Adloo <RADLOO @ci.coppell.tx.us> Date: 4/7/2008 12:46 PM Subject: Re: Lot 11 elevations Attachments: 20080407123943. pdf Ken, Attached is the output summary that I am using. At the two cross sections of concern the computer does not assume any critical depth. Thanks Mike Boyd, P.E. Nathan D. Maier Consulting Engineers, Inc. 214 - 739 -4741 214 - 739 -5961 (fax) - - - -- Original Message - - - -- From: "Ken Griffin" <kgriffin @ci.coppell.tx.us> To: "Mike Boyd" <mboyd @ndmce.com> Cc: "Rhonda Adloo" <RADLOO @ci.coppell.tx.us> Sent: Monday, April 7, 2008 11:42:12 AM GMT -06:00 US /Canada Central Subject: Re: Lot 11 elevations Thanks for the info. I had used the same methodology, but arrived at different numbers. The south lot line of Lot 11 is actually only about 100' from cross section 27400 and there is about 350' from cross section 27400 to cross section 27050. This means that the south lot line is about 30% of the way from section 27400 to section 27050. This would calculate to an existing 100 year water surface of 492.05 (492.83 - 490.22 = 2.61'& 30% of 2.61 = .78'& 492.83 -.78 = 492.05). Using the same approach for the ultimate 100 year water surface calculate to a an ultimate water surface of 493.39. Using this approach yields a minimum finish floor of 494.39 for Lot 11. The question I have concerning the computer runs is whether or not the critical depth was assumed by the computer runs or if the program was actually able to calculate it. If the critical depth was assumed, then the minimum finish floor is calculated using the energy grade line not the water surface. Using the methodology above, with the critical depth assumed, yields a minimum finish floor of 495.06(ultimate controls: 494.28 - 493.56 = .72'/ 30% of .72 = .22'/ 494.28 -.22 = 494.06). know this doesn't appear to be much of a difference, but worst case there could be a difference of 1.02 feet (495.06 - 494.04 = 1.02'). If critical depth was not assumed, then the minimum finish floor for Lot 11 is 494.39. Let me know as soon as possible so we can wrap up this item before the plat goes to P & Z. Thanks, Ken Griffin, P. E. Director of Engineering & Public Works 972 - 304 -3686 kgriffin@ci.coppell.tx.us >>> Mike Boyd <mboyd @ndmce.com> 4/7/2008 10:45 AM >>> have looked at the recent FIRM mapping. It shows that lot 11 would be between the BFE of 491 and 493. Looking at the computer runs and the floodplain work map two cross sections in the vicinity have the south lot line midway between them. Cross sections 27050 and 27400 (lot 11 south line midway between) have 2010) Ken Griffin - Re: Lot 11 elevations Page 2 FEMA elevations of 490.22 and 492.83 (average 491.53) and ult elevations of 492.19 and 493.90 (average 493.04). Two feet above FEMA will set the finish floor at 493.53 and 1 -foot above ult is 494.04. If you have any questions or need further information please call /email. Thank you, Mike Boyd, P.E. Nathan D. Maier Consulting Engineers, Inc. 214 - 739 -4741 214 - 739 -5961 (fax) Page 1 of 2 Ken Griffin - Re: Lot 11 elevations From: Ken Griffin To: Mike Boyd Date: 4/7/2008 11:42 AM Subject: Re: Lot 11 elevations CC: Rhonda Adloo Thanks for the info. I had used the same methodology, but arrived at different numbers. The south lot line of Lot 11 is actually only about 100' from cross section 27400 and there is about 350' from cross section 27400 to cross section 27050. This means that the south lot line is about 30% of the way from section 27400 to section 27050. This would calculate to an existing 100 year water surface of 492.05 (492.83 - 490.22 = 2.61'& 30% of 2.61 =.78'& 492.83 -.78 = 492.05). Using the same approach for the ultimate 100 year water surface calculate to a an ultimate water surface of 493.3 9. Using this approach yields a minimum finish floor of 494.39 for Lot 11. The question I have concerning the computer runs is whether or not the critical depth was assumed by the computer runs or if the program was actually able to calculate it. If the critical depth was assumed, then the minimum finish floor is calculated using the energy grade line not the water surface. Using the methodology above, with the critical depth assumed, yields a minimum finish floor of 495.06 (ultimate controls: 494.28 - 493.56 = .72' / 30% of .72 = .22' / 494.28 - .22 = 494.06). I know this doesn't appear to be much of a difference, but worst case there could be a difference of 1.02 feet (495.06 - 494.04 = 1.02'). If critical depth was not assumed, then the minimum finish floor for Lot 11 is 494.3 9. Let me know as soon as possible so we can wrap up this item before the plat goes to P & Z . Thanks, Ken Griffin, P. E. Director of Engineering &Public Works 972- 304 -3686 kgriffin @ci. coppel1. tx.us »> Mike Boyd <mboyd @ndmce.com> 4/7/2008 10:45 AM »> I have looked at the recent FIRM mapping. It shows that lot 11 would be between the BFE of 491 and 493. Looking at the computer runs and the floodplain work map two cross sections in the vicinity have the south lot line midway between them. Cross sections 27050 and 27400 (lot 11 south line midway between) have FEMA elevations of 490.22 and 492.83 (average 491.53) and ult elevations of 492.19 and 493.90 (average 493.04). Two feet above FEMA will set the finish floor at 493.53 and 1 -foot above ult is 494.04. If you have any questions or need further information please call /email. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \47FA0895City_... 2/19/2010 Page 2 of 2 Thank you, Mike Boyd, P.E. Nathan D. Maier Consulting Engineers, Inc. 214-739-4741214-739-5961 (fax) file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \47FA0895City_... 2/19/2010 HEC -RAS Plan: Plan 12 River: RIVER -1 Reach: Reach -1 Profile- Natural Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chi (cfs) {ft} (ft) (ft) [ ft /ft) - -IF (ft/s) (sa ft) (f ) Reach -1 23900 Natural 15500.00 463.00 482.511 478.21 483.43 0002619 7.97 2376.90 366.31 0.43 Reach -1 Reach -1 2 4100 24500 Natural I Natural 155 15500.00 464.00 468.00 484.01 484.52 _ 484.77 485.79 0.001490 0.003513 7.10 9288 2401.81 2104.98 254.79 266.25 0.34 0.51 Reach -1 25370 Natural W 15500.00 472.00 485.86 487.58 0.005124 10.55 1469.70 150.00 0.59 Reach -1 25470 Natural 15500.00 470.00 487.36 478.86 488.10 0.001216 6.97 2315.51 179.04 0.31 Reach -1 25485 Bridge Reach -1 25500 Nat 15500.00 15500.00 470.00 470.00 487.66 487.34 478.86 488.37 488.65 0.001138 0.003422 6.83 9.19 a 2364.40 1714.00 180.04 201.00 0.30 0.49 Reach -1 25550 Natural Reach -1 25685 Natural 15500.00 470.00 487.43 488.87 0.003893 9.65 1646.77 217.83 0.53 Reach -1 25725 Natural 15500.00 472.00 487.92 489.03. 0.002679 8.53 1981.39 267.77 0,45 Reach -1 125820 Natural 15500.00 470.00 488.98 48 0.000853 0.001975 5.03 7.87 3869.66 2392.14 416.14 326.78 0.25 0.39 Reach -1 26170 ' Natural 14450.00 472.00 489.021 489.89 Reach -1 Reach -1 26300 26700 Natural Natural 14450.00 14450.00 470.00 474.00 489.25 489.93 490.24 491.82 0.002399 0.006625 , 0.004271 8.19 11.11 11.36 2131.64 1407.64 1489.96 331.60 250.94 259.70 0.421 0.67 0.55 Reach -1 26880 Natural 14450.00 474.00 491.05 492.99 Reach -1 27050 Natural 11250.00 474.00 492.19 493.56 0.003378 10.20 9691.01 2727.37 354.27' 331.13 0.48 0.29 Reach -1 27400 Natural 11250.00 476.00 493.90 494.27 0.001154 5.76 Reach -1 27540 Natural 11250.00 475.00 493.12 490.31 495.69 0.006419 12.86 874.94 315 .69 0.66 Reach -1 27555 Bridae Reach -1 27570 Natural 11250.00 475.20 494.48 490.54 49 6.60 0.004682 11.70 8.80 8.22 961.82 167439 1406.42 456.79 345.97 147.02 0.58 0.45 0.41 Reach -1 27620 Natural 11250.00 476.00 495.84 496 ; 0.003070 Reach -1 27900 Natural 11250.00 480.00 497.19 498.23'1 504.1 0.002310 Reach -1 130130 Natural 1 11250.00 483.70 502.881 11.21 1627.80 279.88 0.52