SS9402A-CS 960501May 1, 1996
Mr. Kenneth Griffin, P.E.
Assistant City Manager/City Engineer
255 Parkway Blvd.
Coppell, Texas 75019
FiDR
Re:
Grapevine Creek Sanitary Sewer Project SS 94-02A
Coppell, Texas
HDR No. 08015-001-037
Dear Mr. Griffin:
Enclosed is a check from HDR Engineering in the amount of $5,709.00. This payment is
in accordance with our verbal agreement to assume fiscal responsibility for the changes
required to complete the construction of the sewer line as shown on revised sheet 5A of the
contract documents.
Sincerely,
HDR ENGINEERING, INC.
Joe W.
Project Manager
Enclosure
HDR Engineering, Inc.
Suite125
12700 HillcrestRoad
Dallas, Texas
75230-2096
Telephone
214 960-4000
Fax
214 960-4471
Engineering
Construction Services