Loading...
Duke Lesley 3A-LR1002188908 Ambassador Row, Dallas, TX 75247 R o n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365477 Project No.: 0915747 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 07 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3%-6% Test Method: ASTM C -172 Marked ASTM C -31 (except 10.1.2) Ticket No: 7213296 ASTM C -143 Air Content: 3.7% ASTM C -231 Strength ASTM C -1064 Set No. ASTM C -138 Parking lot paving, east of west point #VII ASTM C -39 Mix Design I.D.: 1621 H E l� Measured Placement Date: 12/22/2009 Slump Weather Conditions: Cloudy Type 1 (inches) Time Sampled: 07:00am Batch time: 05:1 lam 4.0 Temperature - Air: 56 °F Concrete: 62 °F Marked Truck No: 5016 Ticket No: 7213296 Diameter Air Content: 3.7% Unit Weight (pcf): NA Strength Overall Placement Location: Set No. Tested Parking lot paving, east of west point #VII (in) (in') Sample Location: 60' south, 10' east from northwest corner of parking lot REPORT OF TESTS M 1 H E l� Concrete Compressive Cylinder 6" x 12" Cylinder Type 1 Type 2 Type 3 Type 4 Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 12/29/2009 7 5.99 28.18 109,170 3,870 Type 2 1 2 01/19/2010 28 6.00 28.27 139,280 4,930 Type 2 1 3 01/19/2010 28 6.00 28.27 138,380 4,890 Type 5 Average 4,910 1 4 02/16/2010 56 6.00 28.27 150,600 5,330 Type 5 M 1 H E l� J : 1 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Z I42I Z ° /J LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 1 of 10 8908 Ambassador Row, Dallas, TX 75247 Ro n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365477 Project No.: 0915747 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 10 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365477 Project No.: 0915747 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 07 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3% Test Method: ASTM C -172 (psi) ASTM C -31 (except 10.1.2) Ticket No: 7213312 ASTM C -143 Air Content: 3.9% ASTM C -231 ASTM C -1064 ASTM C -138 Parking lot paving, east of west point #VII ASTM C -39 Mix Design I.D.: 1621 Concrete Compressive Cylinder 6" x 12" Measured Placement Date: 12/22/2009 Cylinder Slump Weather Conditions: Cloudy 28 (inches) Time Sampled: 08:00am Batch time: 07:01 am 6.0 Temperature - Air: 59 °F Concrete: 60 °F (psi) Truck No: 3012 Ticket No: 7213312 5.99 28.18 116,530 Air Content: 3.9% Unit Weight (pcf): NA Overall Placement Location: Parking lot paving, east of west point #VII [_J L I.1 1�1 � Sample Location: f 20' north, 10' east from northeast island REPORT OF TESTS 2 2 Concrete Compressive Cylinder 6" x 12" 28 6.00 28.27 Cylinder Maximum Compressive 28 Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 12/29/2009 7 5.99 28.18 116,530 4,140 Type 6 2 2 01/19/2010 28 6.00 28.27 150,150 5,310 Type 2 2 3 01/19/2010 28 6.00 28.27 143,760 5,080 Type 2 Average 5,200 2 4 02/16/2010 56 6.00 28.27 150,710 5,330 Type 2 [_J L I.1 1�1 � f . Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 E LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 3 of 10 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365477 Project No.: 0915747 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW) Page 4 of 10 8908 Ambassador Row, Dallas, TX 75247 R o n e Engineering 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365477 Project No.: 0915747 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 07 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3% Test Method: ASTM C -172 Strength ASTM C -31 (except 10.1.2) Set No. Tested ASTM C -143 (in) ASTM C -231 (Ibs) ASTM C -1064 Type ASTM C -138 12/29/2009 ASTM C -39 Mix Design I.D.: 1621 Placement Date: 12/22/2009 Weather Conditions: Cloudy Time Sampled: 09:00am Temperature - Air: 56 °F Truck No: 5013 Air Content: 4.5% Overall Placement Location: Parking lot paving, east of west point #VII Sample Location: 30' south, 10' east from northeast island REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" s r'� J Cylinder Measured Slump (inches) Batch time: 08:48am 5.5 Concrete: 60 °F Date Ticket No: 6363746 Diameter Unit Weight (pcf): NA Load s r'� J Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 12/29/2009 7 5.99 28.18 113,810 4,040 Type 5 3 2 01/19/2010 28 6.00 28.27 140,800 4,980 Type 5 3 3 01/19/2010 28 6.00 28.27 131,190 4,640 :', Type 5 Average 4,810 3 4 02/16/2010 56 6.00 28.27 151,250 5,350' Type 2 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 5 of 10 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 365477 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 6 of 10 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365477 Project No.: 0915747 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 07 Specification Requirements 6.25 Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3%-6% Test Method: ASTM C -172 Average ASTM C -31 (except 10.1.2) 4 4 ASTM C -143 56 ASTM C -231 126,930 ASTM C -1064 ASTM C -138 ASTM C -39 Mix Design I.D.: 1621 Placement Date: 12/22/2009 Weather Conditions: Cloudy Time Sampled: 11:20am Temperature - Air: 60 °F Truck No: 1039 Air Content: 5.9% Overall Placement Location: Parking lot paving, east of west point #VII Sample Location: 55' south, 20' east from northeast island REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Measured Cylinder Maximum Slump Marked Date Age Diameter Area Load (inches) Batch time: 6.25 Concrete: 64 °F 2,960 Type 2 Ticket No: 6363760 3,860 Type 2 Unit Weight (pcf): NA Concrete Compressive Cylinder 6" x 12" 01/19/2010 Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in =) (Ibs) (psi) Type 4 1 12/29/2009 7 5.99 28.18 83,500 2,960 Type 2 4 2 01/19/2010 28 6.00 28.27 111,540 3,940 Type 2 4 3 01/19/2010 28 6.00 28.27 109,040 3,860 Type 2 Average 3,900' 4 4 02/16/2010 56 6.00 28.27 126,930 4,490 Type 2 11 Ll E" I ' Does not comply with specified strength Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The lest results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KW ) Page 7 of 10 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 365477 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 8 of 10 Ro n e Engineering 7701 8908 Ambassador Row, Dallas, TX 75247 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of C oncrete Compressive Strength Test Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254 -2936 Report No.: 365477 Project No.: 0915747 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 07 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air ( %): 3%-6% Test Method: ASTM C -172 Marked ASTM C -31 (except 10.1.2) Age ASTM C -143 Area ASTM C -231 Strength ASTM C -1064 Set No. ASTM C -138 (days) ASTM C -39 Mix Design I.D.: 1621 Placement Date: 12/22/2009 Weather Conditions: Cloudy Time Sampled: 01:10pm Temperature - Air: 62 °F Truck No: 1098 Air Content: 5.1% Overall Placement Location: Parking lot paving, east of west point #VII Sample Location: 40' north, 20' east from southwest island REP ORT OF TESTS Batch time: 11:58am Concrete: 64 °F Ticket No: 6363773 Unit Weight (pcf): NA Measured Slump (inches) 6.25 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 9 of 10 Ed 1 2 Concrete Compressive Cylinder 6" x 12" [A] Cylinder Type 2 Type 3 Type 4 Type 5 Type 6 Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 12/29/2009 7 5.99 28.18 95,830 3,400 Type 2 5 2 01/19/2010 28 6.00 28.27 118,380 4,190 Type 2 5 3 01/19/2010 28 6.00 28.27 119,720 4,230 Type 2 Average 4,210 5 4 02/16/2010 56 6.00 28.27 137,060 4,850 Type 2 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 9 of 10 Ed 1 2 �J [A] Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 9 of 10 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Test Client: Duke Construction, LP Report No.: 365477 14241 Dallas Pkwy, Ste 1000 Project No.: 0915747 Dallas, TX 75254 -2936 Date of Service: 12/22/2009 Report Date: 02/18/2010 Project: Samsung -Point West VII Parking Lot Expansion Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Results to superintendent. Water added at site: 10 gallons Technician: Jose Villanueva Started: 05:00am Finished: 03:00pm Rone Engineering Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Ms. Ashley Hair (1 -ec copy) 1 -ec Duke Construction, LP Attn: Mr. Andy (Maverick) Otten 1 -ec Rone Project Manager Attn: Mr. K. Scott Watson AET K. Scott Watson, AET 1 -ec City of Coppell Attn: Mr. Lee Stone Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 10 of 10