Loading...
Hard 8 BBQ-CS060713 (2/23/2010) Ken Griffin - Re: Fwd: Hard Eight BBQPage 1 From: Mindi Hurley To:Griffin, Ken Date: 7/13/2006 4:32 PM Subject: Re: Fwd: Hard Eight BBQ Sorry, Ken. Revise wasn't the correct word...I meant did you talk to Jim about waiving the inspection fees or not. I don't mind asking him about it, but you had mentioned that you were going to talk to him so I didn't want to confuse him by both of us asking. I just wanted to give the Hard 8 guys an accurate amount so they don't come back later and gripe at all of us and claim that they shouldn't have to pay it since it wasn't included in the original amount. Mindi Hurley Economic Development Coordinator City of Coppell 255 Parkway Blvd. Coppell, TX 75019 (972) 304-3677 (972) 304-3673 (fax) www.ci.coppell.tx.us >>> Ken Griffin 7/13/2006 11:31 AM >>> Mindi What was I suppose to revise? The numbers are correct. The issues are: 1) Will they purchase and install their own detector checks or purchase them from the City? 2) Will we access and collect inspection fees for public and privates improvements that they construct? It's 2% on the private and 4% on the public. 3) We have waived the roadway impact fees in the amount of $14,915.25, so that leaves $5,084.75 remaining of the original $20,000 fee waiver that can be used to offset fees. I'm not sure if Building Inspections is reducing their fee by $5,084.75. We have $17,331.18 of fees, meters and impact fees remaining to collect, not including the inspection fees. We can not calculate the inspection fees until we have a copy of the contracts. Let me know. I'm out this afternoon, but I will be checking email. ken g >>> Mindi Hurley 7/13/2006 9:56 AM >>> Did you by any chance get to revise the impact fees for them? They want to cut their check tomorrow to pick up their building permit, but I told them to wait until they heard from us on the revised fees. Thanks! Mindi Hurley Economic Development Coordinator City of Coppell 255 Parkway Blvd. Coppell, TX 75019 (972) 304-3677 (972) 304-3673 (fax) www.ci.coppell.tx.us >>> Ken Griffin 7/13/2006 8:21 AM >>> Mindi / Jim The updated cost estimate for the Hard 8 is attached. I'm still not sure that the vault and detector check cost is high enough. Hopefully, they did some research and the private side can get a better price than we can. ken g >>> "Jack Evans" < jevans@pkce.com > 7/12/2006 7:39 PM >>> Ken, Per our conversation last week, please find attached our revised opinion of probable cost. Please note that I am out this Thursday (2/23/2010) Ken Griffin - Re: Fwd: Hard Eight BBQPage 2 and Friday, but will return on Monday. I will be checking messages and will be able to receive emails while out of the office. Please call or email if you have any questions. Sincerely, Jack C. Jack Evans, PE Associate Mobile 214.649.4130 jevans@pkce.com Pacheco KochConsulting Engineers8350 N. Central Expwy, Suite 1000 Dallas, Texas 75206-1612 T 972.235.3031 F 972.235.9544 www.pkce.com ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Project Name: Hard Eight BBQ Restaurant2052-05.173 PK No.: Pacheco Koch Consulting Engineers (CAJ)7/12/2005 Prepared By: Date: Paving Costs ItemUnit No.Quant.UnitDescriptionPriceTotal Price Paving Costs 11600CYCompacted Fill (Haul in)$10.00$16,000.00 24607SY6" Lime Treated Subgrade$4.00$18,428.00 34607SY5" Portland Cement Concrete Pavement (3000 psi)$30.00$138,210.00 42200LFConcrete Curb & Gutter$2.00$4,400.00 585TNHydrated Lime (37#/SY)$120.00$10,227.54 66EACurb Stop$250.00$1,500.00 Sidewalk Costs 72500SF4" Concrete Sidewalk$4.00$10,000.00 Sub-Total $198,765.54 Drainage Costs ItemUnit No.Quant.UnitDescriptionPriceTotal Price 870LF18" Class III Storm Sewer Pipe$42.00$2,940.00 91EA18" Type "B" Headwall$2,000.00$2,000.00 1045LF12" Class III Storm Sewer Pipe$30.00$1,350.00 113LSConnection to Exist Drainage Appurtenances$1,500.00$4,500.00 122EA5' Curb Inlet$2,500.00$5,000.00 131EA10' Curb Inlet$4,000.00$4,000.00 Sub-Total $19,790.00 Water & Sanitary Sewer Costs ItemUnit No.Quant.UnitDescriptionPriceTotal Price 14560LF8" Water Line$30.00$16,800.00 1520LF6" Water Line$23.00$460.00 16150LF2" Water Line$15.00$2,250.00 175EA8" Water Valve$1,500.00$7,500.00 183EA6" Water Valve$1,000.00$3,000.00 191EA2" Water Valve$200.00$200.00 202EA8" Detector Check w/ Vault$6,000.00$12,000.00 211LSPipe Fittings$3,000.00$3,000.00 222EAFire Hydrant$2,500.00$5,000.00 2370LF6" PVC Sanitary Sewer Line$25.00$1,750.00 241LSWater Test$2,500.00$2,500.00 2570LFTrench Safety$1.00$70.00 261EASanitary Sewer Double Cleanout$350.00$350.00 2775LFBore 8" PVC Water Line w/ Steel Casing$125.00$9,375.00 282EA16" X 8" Tapping sleeve$3,500.00$7,000.00 291EASanitary Sewer Connection to Main$1,500.00$1,500.00 Sub-Total $72,755.00 Erosion Control Costs ItemUnit No.Quant.UnitDescriptionPriceTotal Price 301EAConstruction Entrance$1,500.00$1,500.00 31600LFSilt Fence$2.00$1,200.00 323EAInlet Protection$750.00$2,250.00 Sub-Total $4,950.00 SUB-TOTAL $296,260.54 The quantities and prices shown hereon are an indication of the Engineer's 15% Contingency $44,439.08 opinion of probable construction costs associated with the referenced TOTAL$340,699.62 project and are NOT a guarantee of individual or total construction costs.