Loading...
Old Town-CS100129Page 1 of 2 Keith Marvin -Old Town - Utility Plan and Cost Estimate From: Caleb Thornhill <bct @freese.com> To: Keith Marvin <KMARVIN @ci.coppell.tx.us> Date: 1/29/2010 12:31 PM Subject: Old Town - Utility Plan and Cost Estimate Attachments: 012810 EXHIBIT_reduced.pdf; Old Town OPCC.Pdf; Earth Balance Coppell.pdf Keith, Sorry again about today. I left you a message. I've wrenched my back something fierce. It's started last Sunday while cleaning out the garage and now just pops up out of the blue. I look like the hunch back walking around. I'm going to run to the Dr. and see if I can get some sort of muscle relaxer. Bethel: • I've posted the Bethel Plans on our FTP site. I'll plan on coming out there early next week, but this will give you some time to review. There are a couple of clean up items, but barring any major comments should be able to sign them next Friday. Here are the instructions on how to get to the files: 1. Click on Start, and open My Computer. 2. Copy and paste the following line in the white area next to Address: ftp://fnguest:anonymous 3. Press Enter, and wait for the window to finish loading. 4. Double -click on the "OUTGOING" folder. 5. Double -click on the folder used by the Freese and Nichols employee to store their files. " \City of Coppell \Bethel Road Phase 2" 6. Click- and -drag or copy the files /folders you wish to retrieve, and place /paste them wherever you'd like on your local machine (i.e. your Desktop). • 1 talked with our Construction Services about the bridge incentive. The suggest was to modify the "Time Bid ". Have a B.1 (overall time) and a B.2 (bridge time). We would have to define the bridge calendar days. The only concern is providing incentive to complete a major structure. We don't want to sacrifice quality. Call my cell phone and we can discuss your thoughts. Coppell: • Structures is looking at the headwall detail and the plan and profile for Culvert B. He's supposed to get back with me 1 St thing Monday or Tuesday. • I've attached a memo for the earth work calculations. Let me know if it's enough detail and provides you enough information. If not, an alternative would be to cut some cross sections every 100 ft and get an average end -area rough calc. Old Town: I've attached the cost estimate and the Utility Plan layout. Please review both and let me know if you have any questions. If there aren't any major concerns, I can get a revised scope and fee to you first thing next week. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4B62D50ACity_... 2/25/2010 Page 2 of 2 Sorry again about today. Call me on my cell if you want to discuss: 214 -952 -9562. Get me before I get on the muscle relaxers. B. Caleb Thornhill, P.E. Freese and Nichols, Inc. 1701 N. Market St., Suite 500 Dallas, Texas 75202 w Main - 214- 217 -2200 s Direct - 214- 217 -2282 s Fax - 214- 920 -2565 ® Email: bct _,freese.com This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4B62D50ACity_... 2/25/2010 i CONECT TO EX. 8" WL CONNECT TO EX. 8 SS 0" E7 ImmEm W4 .- . � ! ■I� / CONNECT TO EX. 16" WL k - 7 CONECT TO EX. - 8" WL -+ - A o CON EX. 16" W •',, - -- - 1 °a 'A i —MAIN STREET - 12,100 S.F. PARKING - 4, 300 S.F. MAIN STREET- 12,100 S.F. PARKING -4,300 S.F.w f CONNECT TO -.i X Ef SS " I I y# LEGEND 0" E7 ImmEm W4 .- . � ! ■I� / CONNECT TO EX. 16" WL 1 °a 'A i f LEGEND CITY OFCOPPELL, TEXAS ■ PROPOSED PAVEMENT FREESE rNMICHOLS PROPOSED SIDEWALK z 11 OLD TOWN COPPELL - MAIN STREET 0 70' 14 0 ,a " ,' i 's1i ­II INFRASTRUCTUREINWROVEMENTS PROPOSED WATERLINE e (2 2vz- 2211 (1974 LF 8 ", 1291 LF 10 ") SCALE IN FEET DATE — 282010 PROPOSED SEWER LINE (2352 LF 8 ") Main Street @ Old Town Coppell Estimate (Updated 12128109) Paving Improvements Unit Quantity Unit Price Total 8" Continuous Reinf. Concrete Pavement SY 8,736 $35.00 $305,760.00 8" Continuous Reinf. Stamped Concrete Pavement SY 302 $105.00 $31,710.00 Remove and Dispose of Exisiting Asphalt Bethel SY 1,544 $6.00 $9,264.00 8" Lime Stabilized Sub grade SY 9,600 $3.00 $28,800.00 On- Street Parking SY 1 6,160 $29.00 $178,640.00 Median Nose EA 4 $1,200.00 $4,800.00 Monolithic Curb as part of Median Structures LF 200 $25.00 $5,000.00 Lime (Hydrated) TON 160 $135.00 $21,600.00 Temporary Pavement for Traffic Control 2" HMAC, 6" Agg. Base SY 1,000 $135.00 $135,000.00 Traffic Signs EA 15 $410.00 $6,150.00 Pavement Markings LF 8,500 $1.25 $10,625.00 Concrete Sidewalk SF 1 32,725 4.20 $137,445.00 Solid Pavement Markings LF 240 $4.00 $960.00 Handicap Symbols EA 10 $150.00 $1,500.00 Parking Space Striping LF 5,700 1 0.60 $3,420.00 Intersection Si nalization Bethel Rd & Main St. LS 1 150,000.00 $150,000.00 Drainage Improvements Unit Quantity Unit Price Total 18" RCP LF 140 $40.00 $5,600.00 24" RCP LF 560 $45.00 $25,200.00 30 "RCP LF 175 $55.00 $9,625.00 36 RCP LF 630 $65.00 $40,950.00 Trench Safety LF 1,505 $1.25 $1,881.25 10' Curb inlet EA 9 $2,500.00 $22,500.00 15' Curb inlet EA 2 $3,500.00 $7,000.00 4' SDMH EA 2 $4,000.00 $8,000.00 30" Headwall EA 1 $3,500.00 $3,500.00 Rock Rip Rap SY 12 $80.00 $960.00 Drainage Grading Improvements LS 1 $50,000.00 $50,000.00 Utility Improvements Unit Quantity Unit Price Total 10" PVC C -900 LF 1,291 $35.00 $45,185.00 8" PVC C -900 LF 1,974 $30.00 $59,220.00 8" Gate Valve C -900 EA 6 $500.00 $3,000.00 Fire Hydrant EA 12 $3,000.00 $36,000.00 16 "x10" TS &V EA 2 $5,000.00 $10,000.00 16 "x8" TS &V EA 1 $4,800.00 $4,800.00 10"x8" TS &V EA 2 $4,500.00 $9,000.00 8 "x6" TS &V EA 2 $4,000.00 $8,000.00 Fittings & Bends TN 2 $2,500.00 $5,000.00 8" PVC SDR -35 LF 2,382 $40.00 $95,280.00 Manholes EA 12 $3,500.00 $42,000.00 Trench Safety LF 5,647 $1.25 $7,058.75 Streetsca a Improvements Unit Quantity Unit Price Total Landscape Planting 3" Cal, 8' HT, 5' S read EA 51 $1,984.00 $101,184.00 Landscape Planting Shrubs, etc EA 77 $600.00 $46,200.00 Planters EA 40 $800.00 $32,000.00 Irrigation System LS 1 $35,000.00 $35,000.00 Street Lighting Assemble EA 40 $3,000.00 $120,000.00 Street Lighting Foundation EA 40 $750.00 $30,000.00 2" PVC Electrical Conduit LF 2,398 $8.89 $21,306.95 Total $1,916,124.95 20% Contin enc $383,224.99 Project Total= $2,299,349.94