Loading...
ST0701-LR091103CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0018 Irerracan Service Date: 10/20/09 8901 Carpenter Frwy. Report Date: 11/03/09 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Result Specification 6 5 -7 1.5 81 80 151.0 Project Number: 94091193 Material Information Sample Information Specified Strength: 3,600 psi @ 28 days Mix ID: DCCOG501 Supplier: Redi -Mix Batch Time: 0435 Plant: 136 Truck No.: 1166 Ticket No.: 25128549 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pef): Laboratory Test Data Set Specimen No. ID Diameter (in) 6.00 6.00 6.00 6.00 Project Southwestern Boulevard Coppell Road to Grapevine Creek Coppell, TX Sample Date: 10/20/09 Sample Time: 1803 Sampled By: Juan Lopez Weather Conditions: Clear Accumulative Yards: 8 Batch Size (cy): 8 Placement Method: Direct Discharge Water Added Before (gal): 10 Water Added After (gal): 0 Sample Location: Pier @ B.2 /C Placement Location: Drilled Pers, see Foundation Observations Report #94091193.0017, dated 10/20/09, for pier locations Age at Area Strength Fracture (Ibs) Test (sq in) 4,780 4 152,760 (days) 28.27 7 28.27 14 28.27 28 28.27 28 Date Received 1 0/21 /09 10/21 /09 10/21/09 10/21/09 Date Tested 10/27/09 11/03/09 11/17/09 11 / 17/09 Maximum Compressive Load Strength Fracture (Ibs) (psi) Type 135,190 4,780 4 152,760 5,400 4 Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required fie samples. Terracon Rep.: Juan Lopez Reported To: Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX (1) Lacy Construction Test Methods: (1) City of Coppell TX Reviewed By: (2) Halff Assoc Inc (1) PacTivst Pacific Realty Associates LP ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 5- 2I -09, Rev.3 Page 1 of 1 REPORT OF DRILLED PIERS Consultina Enaineers 8 Scientists 8901 Carpenter Fr y.. Suite #100 Dallas. Texas 75247 (214) 630 -1010 Project: Southwestern Boulevard - Abutments #1 & #4 Coppell Road to Grapevine Creek, Coppell, TX Project No.: 94091193 Driller: Texas Shaft Report No.: 94091) 93.0024 Date of Service: 11/03/09 Technician: J. Lopez Page: 1 of 1 Pier Identification A#1 /E A#4 /F A #5 /C Pier Diameter (in.) 24 24 24 `Top of Ground Elevation (ft.) 509.1 508.5 507.9 'Top of Pier Elevation (ft.) 506.1 506.9 506.5 Depth to Bearing Stratum from Ground (ft.) 17.0 16.1 15.4 Depth of Pier from Ground (ft) 27.0 25.5 25.5 Required Penetration (ft.) 8.0 8.0 8.0 Actual Penetration (ft.) 10.0 9.4 10.1 Depth from Top of Concrete (ft.) 24.0 24.0 24.0 Condition of Bottom (wet or dry) Damp Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Casing Diameter (in.) N/A N/A N/A Cased Depth (ft.) N/A N/A N/A Number of Vertical Bars (ea.) 8 8 8 Reinforcing Bar Size ( #) 7 7 7 Length of Vertical Bars (ft.) 26.0 25.6 25.6 Time Drilling was Completed 8:15 a.m. 11:25 a.m. 2:40 p.m. Time Concrete was Placed 11:15 a.m. 1:08 p.m. 3:51 p.m. 'Elevation was provided by others.