Loading...
ST0003-LR090615(6/18/2009) Carol Dye - 94081163 -6.pdf Page CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 94081163.0102 05/15/09 Sample Time: Service Date: 05/15/09 8901 Carpenter Frwy, Ste 100 Report Date: 06/15/09 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Coppell Road - #ST00 -03 Attn: Albert Samaniego Sandy Lake Road to Engineering Dept Cooper Lane PO Box 9478 Coppell, TX Coppell, TX 75019 Project Number: 94081163 Material Information Sample Information Specified Strength: 3,000 psi @ 28 days Sample Date: 05/15/09 Sample Time: 1245 Sampled By: Robert Sargeant Mix ID: 8272 Weather Conditions: Clear Supplier: TXI Accumulative Yards: 60 Batch Size (cy): 10 Batch Time: 1 156 Plant: 141 Placement Method: Direct Discharge Truck No.: 1040 Ticket No.: 866095 Water Added Before (gal): 10 Field Test Data Water Added After (gal): 0 Sample Location: See Placement Location Test Result Specification Placement Location: Sidewalk @ Kaye Lane Slump (in): 5 3/4 Air Content ( %): 3.7 Concrete Temp. (N): 86 Ambient Temp. (F): 85 Plastic Unit Wt. (pcf): 152.4 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 2 1 6.00 28.27 05/16/09 05/22/09 7 78,020 2,760 4 2 2 6.00 28.27 05/16/09 06/12/09 28 113,580 4,020 2 2 3 6.00 28.27 05/16/09 06/12/09 28 110,180 3,900 2 Average (28 days) 3,960 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast samples. Terracon Rep.: Robert Sargeant Started: 1030 Reported To: Contractor: Tiseo Report Distribution: (I) City of Copper TX (1) Tiwo Paving Company (1) Hmt( Zollars Inc Finished: 1330 Reviewed By: strength Project Engineer Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROW 1, 5- 21 -09, Rev.l Page 2 of 2 (6/18 /2009) Carol Dye - 94081163 -6.pdf Pag 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 94081163.0102 1200 Service Date: 05/15/09 8901 Carpenter Frwy, Ste 100 Report Date: 06/15/09 Dallas, TX 75247 214- 630 -1010 Reg No: F -3272 Client Project City of Coppell TX Coppell Road - #ST00 -03 Attn: Albert Samaniego Sandy Lake Road to 40 Batch Size (cy): Engineering Dept Cooper Lane Plant: PO Box 9478 Coppell, TX Placement Method: Coppell, TX 75019 Project Number: 94081163 Material Information Sample Information No.: Specified Strength: 3,000 psi @ 28 days Sample Date: 05/15/09 Sample Time: 1200 Sampled By: Robert Sargeant Mix ID: 8272 Weather Conditions: Clear Supplier: TXI Accumulative Yards: 40 Batch Size (cy): 10 Batch Time: 1 115 Plant: 141 Placement Method: Direct Discharge Truck No.: 7812 Ticket No.: 866042 Water Added Before (gal): 10 Water Added After (gal): 0 Field Test Data Sample Location: See Placement Location Test Result Specification Placement Location: Sidewalk at 420 Coppell Road Slump (in): 6 Air Content ( %): 3.1 Concrete Temp. (F): 85 Ambient Temp. (F): 85 Plastic Unit Wt. (pcf): 149.2 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/16/09 05/22/09 7 79,920 2,830 4 1 2 6.00 28.27 05/16/09 06/12/09 28 121,990 4,320 2 1 3 6.00 28.27 05/16/09 06/12/09 28 115,870 4,100 2 Average (28 days) 4,210 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perfonn required field tests and cast compressive strength samples. Terracon Rep.: Robert Sargeant Started: 1030 Reported To: Contractor: Tiseo Report Distribution: (])City of Coppell TX (I) Tiseo Paving Company (1) Hain Zollars Inc Finished: 1330 Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 5- 21 -09, R-3 Page 1 of 2