ST0003-LR090408REPORT OF SOIL -LIME MIXTURE PULVERIZATION err
Consulting Engineers & Scientists
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214- 630 -1010
Date of Service: 04/08/09
Client: City of Coppell TX
Engineering Dept
PO Box 9478
Coppell, TX 75019
Contractor: Tiseo
Test Location: S. Bound Coppell Rd.
Sta. 39 +00 - Sta. 52 +50
Test Method: NCTCOG
Report No.: 94081163.0083
Project No.: 94081163
Project: Coppell Road - #ST00 -03
Sandy Lake Road to
Cooper Lane
Coppell, TX
Specification Requirements:
Minimum Passing 1 -3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
TEST
NO.
LOCATION
1 -3/4" SIEVE
% PASSING
#4 SIEVE
% PASSING
1
Sta. 39 +75, 10' L of centerline
100
78
2
Sta. 42 +75, 10' L of centerline
100
64
3
Sta. 44 +75, 10' L of centerline
100
69
4
Sta. 47 +25, 10'L of centerline
100
77
5
Sta. 49 +75, 10' L of centerline
100
77
6
Sta. 52 +25, 10'L of centerline
100
86
Comments:
Technician: B. Hatch
Report Distribution:
(1) City of Coppell TX (1) City of Coppell TX
(1) Huitt Zollars Inc (1) Tiseo Paving Company
Eric J. Cleveland P.E.
Senior Project Manager
dgr This report is exclusively for the use of tie client indicated above and shall not be reproduced in full without written approval of Terracon.