ST0003-LR090131REPORT OF SOIL -LIME MIXTURE PULVERIZATION Irerracon
Consultlna Enalneers & Scientists
8901 Carpenter Fnvy., Suite #100
Dallas, Texas 75247
(214- 630 -1010
Date of Service: 01/31/09
Client: City of Coppell TX
Engineering Dept
PO Box 9478
Coppell, TX 75019
Contractor: Tiseo
Test Location: R Half of Coppell Road
Test Method: NCTCOG
Report No.: 94081163.0051
Project No.: 94081163
Project: Coppell Road - #ST00 -03
Sandy Lake Road to
Cooper Lane
Coppell, TX
Specification Requirements:
Minimum Passing 1 -3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
TEST
NO.
LOCATION
1 -3/4" SIEVE
% PASSING
#4 SIEVE
% PASSING
1
Sta. 31 +50, 15'R of centerline
100
64
2
Sta. 33 +75, 15'R of centerline
100
71
3
Sta. 35 +75, 15'R of centerline
100
68
4
Sta. 37 +50, 15'R of centerline
100
68
5
Sta. 38 +25, 15'R of centerline
100
72
Comments:
Technician: B. Hatch
Report Distribution:
(1) City of Coppell TX
(1) Huitt Zollars Inc
(1) City of Coppell TX
(1) Tiseo Paving Company
Eric J. Cleveland, P.E.
Senior Project Manager
dgr This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon.