Loading...
ST0501-CS070814 (3/3/2010) Keith Marvin - Re: GSWW update, Page 1 From: Keith Marvin To:Spann, Quinn Date: 8/14/2007 1:28 PM Subject: Re: GSWW update, I look forward to receiving it. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Quinn Spann" <qspann@gswwengineers.com> 8/14/2007 12:40 PM >>> Hey Keith, I just wanted to give you an update. We have been working on the preliminary opinion of Probable cost this week. I talked with the surveyor, Geotechnical, and structural and all three have performed a site visit and understand the scope. We have already been discussing ideas. We have a pretty good handle on everything but the drainage. I have put in a call to the design engineer at Halff to ask him some "general questions" about his second design of the system for Deforest Court. I am also writing up the scope today, but will be out of the office tomorrow. I have been called out by TxDOT to finish up the inspection of two bridges that cross lakes down around Temple. It is plan to get you something to look at by the end of Thursday. Let me know if you have any question. Quinn G. Spann, Jr., P.E. Associate / Sr. Project Manager GSWW, Inc. Civil Engineers 11117 Shady Trail Dallas, Texas 75229-4646 972-620-1255 Ext 225 972-620-8028 Fax