Keith,
Please find attached the revised schedule. Also, do you think that it would be ok for the geotechnical to bore
late next week if they have their permit?
Quinn G. Spann, Jr., P.E.
Associate / Sr. Project Manager
GSWW, Inc.
11117 Shady Trail
Dallas, Texas 75229
972-620-1255 Ext 225
972-620-8028 Fax
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\475E4F25City_of...3/4/2010
Deforest Road - MacArthur Blvd to Windsor Estates (ST 05-01)
200720082009
Oct
NovDecJanFebMarAprJulyAugSeptOctNovDecMarJuneJanDec
18.14%Survey (topographic)31
4.52%Geotechnical
19.27%Schematic Design14
City Staff Review31
22.48%65% Prelim. Design16
City Staff Review31
9.63%95% Prelim. Design29
1.61%Easement doc
City Staff Review15
10.19%Pre-final30
City Staff Review17
2.66%Final Design17
11.51%Construction Admin
Begin Construction**
100.00%
** This "Begin Construction" schedule excludes Right-Of-Way Acquisition and Utility Relocations which is not under the engineer's control
Âk«Ã±
Schematic Design-March 14th
65% Prelim. Design- July 16th
95% Prelim. Design-Aug 29th
Pre-Final Design-Sept 30th
Final Design-Nov 17th