Loading...
ST0501-CS080207010) Keith Marvin - RE: Deforest Road Update (Sample Invoice for your approval) Page 1 From: "Quinn Spann" <gspann @gswwengineers.com> To: "Keith Marvin" <kmarvin @ci.coppell.tx.us> Date: 2/7/2008 5:04 PM Subject: RE: Deforest Road Update (Sample Invoice for your approval) Attachments: SKMBT_C45008020717090.pdf Keith, Please find attached a sample invoice for your approval. Quinn G. Spann, Jr., P.E. Associate / Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972 - 620 -1255 Ext 225 972 - 620 -8028 Fax - - - -- Original Message---- - From: Keith Marvin [mailto: kmarvin @ci.coppell.tx. us] Sent: Tuesday, February 05, 2008 4:27 PM To: Quinn Spann Cc: DiWanna Baskins Subject: RE: Deforest Road Update We don't have a set format. We do need to see total contract amount, payments made to date, work completed during current billing cycle, etc... Probably everything you normally do for other public clients. If you want to send me an example before you work ours up, we can do that, or you can just send your standard one and we have any questions we can work it out. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Quinn Spann" <gspann @gswwengineers.com> 2/5/2008 4:22 PM >>> have not sent in a pay request yet. I will be working on that at the end of the week, I hope. Do you have a set format for invoices? Is so, can you send me a pdf. If not, I will just do it my normal way. Quinn G. Spann, Jr., P.E. Associate / Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972 - 620 -1255 Ext 225 972 - 620 -8028 Fax 010) Keith Marvin - RE: Deforest Road Update (Sample Invoice for your approval) Page 2 - - - -- Original Message---- - From: Keith Marvin [mailto: kmarvin @ci.coppell.tx. us] Sent: Tuesday, February 05, 2008 4:09 PM To: Quinn Spann Cc: DiWanna Baskins; Dan DeGroot Subject: Re: Deforest Road Update Thanks for the update Quinn. We look forward to seeing some preliminary alignment drawings in a few weeks. haven't seen a pay request yet on this project, have I? Please send them to my attention when they come in. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Quinn Spann" <gspann @gswwengineers.com> 2/5/2008 4:00 PM >>> Keith, The surveyor provided the survey to us on January 31st. The Geotechnical has completed the borings. They are now waiting on us to supply the preliminary vertical alignments for wall slope stability and wall design (if we need walls). We have begun drawing in the existing water, sanitary sewer and storm sewer lines into our base files, based upon the record drawings. We are also reviewing the private utility files and trying to match them up with the flagging and paint marks. After we get this information compiled we will begin looking at "rough" horizontal and vertical alignment options to submit to you. If you need any additional information or clarification, please feel free to call me. Quinn G. Spann, Jr., P.E. Associate / Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972 - 620 -1255 Ext 225 DRAFT DRAFT DRAFT GSWW, Inc. 11117 Shady Trail • Dallas, TX 75229 (972) 620 -1255 Fax (972) 620 -8028 CLIENT r CITY OF COPPELL 255 Parkway Coppeli, Texas 75019 Attention: Keith Marvin, RE INVOICE NO. 08 -01 -208 DATE February 8, 2008 Purchase Order # Project: Deforest Road Reconstruction - (ST05 -01) GSWW, Inc. Project No. 1103 -001 Proposal Approved October, 2007 FOR ENGINEERING SERVICES PERFORMED FOR ABOVE PROJECT FOR THE PERIOD OF INCEPTION THROUGH February 7 2008 A. BASIC SERVICES ContractAmt %Complete Amount A. SCHEMATIC DESIGN $36,240.00 15.00 %Q $5,436.00 B. PRELIMINARY DESIGN $60,400.00 0.00% $0.00 C. FINAL DESIGN $24,160.00 0.00% $0.00 D -1 CONSTRUCTION ADMINISTRATION $17,150.00 0.00% $0.00 D -2 CONSTRUCTION ADMIN. - Record Drawings $4,500.00 0.00% $0.00 E -1 SURVEY- (Hodzontal & Vertical Contra]) $1,660.00 100.00% $1,660.00 E -2 SURVEY- (Reserch, Deed Sketch &Analysis) $3,970.00 100.00% -- - $3,970.00 E -3 SURVEY -(Topo Survey) $28,490.00 100.00% $28,490.00 E-4 SURVEY - (Right -of -Way Ex III bits/ Easemets) $3,036.00 0.00% $0.00 F -1 GEOTECHN ICAL SERVICES (Borings) $4,315.00 100.00% $4,315.00 F -2 GEOTECHN [CAL SERVICES (LabortoryTest) $1,265.00 100.00% $1,265.00 F -3 GEOTECH SERVICES (Report) $1,380.00 0.00% $0.00 F-4 GEOTECH SERVICES (Wall and slope anal.) $1,540.00 0.00% $0.00 TOTAL $188,106.00 $45,136.00 TOTAL CONTRACT AMOUNT: $188,106.00 AMOUNT EARNED TO DATE: $45,136.00 LESS AMOUNT PREVIOUSLY INVOICED: $0.00 AMOUNT DUE THIS INVOICE: $45,136.00 SAMPLE ONLY