(3/5/2010) Keith Marvin - Re: Freeport Bridge CostsPage 1
From: Keith Marvin
To:Atkins, Matt
CC:White, Derek
Date: 4/16/2008 5:16 PM
Subject: Re: Freeport Bridge Costs
Thanks Matt. We'll look these options over and get back to you.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Matt Atkins" <matkins@tnp-online.com> 4/15/2008 3:03 PM >>>
Keith,
We ran out some quick costs on a 4-Lane bridge with an 8' trail. The
cost is approximately $1.2M. If we use a 4-lane bridge, we have already
discovered that we may have some trouble in being able to construct it
while keeping the existing bridge open to traffic. It is probably
something we can work around, but just some additional information for
you to consider. Let me know what you think as we are trying to get a
layout complete with a profile so that we can get the ROW needs
identified. If you have any questions, give me a call. Thanks and have
a great day!
Matt Atkins, P.E.
Project Manager
12160 North Abrams Road, Suite 508
Dallas, Texas 75243
214.461.9867 office
214.461.9864 fax
matkins@tnp-online.com <mailto:matkins@tnp-online.com>
www.tnp-online.com <http://www.tnp-online.com/>