Loading...
ST0502A-CS080416 (3/5/2010) Keith Marvin - Re: Freeport Bridge CostsPage 1 From: Keith Marvin To:Atkins, Matt CC:White, Derek Date: 4/16/2008 5:16 PM Subject: Re: Freeport Bridge Costs Thanks Matt. We'll look these options over and get back to you. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Matt Atkins" <matkins@tnp-online.com> 4/15/2008 3:03 PM >>> Keith, We ran out some quick costs on a 4-Lane bridge with an 8' trail. The cost is approximately $1.2M. If we use a 4-lane bridge, we have already discovered that we may have some trouble in being able to construct it while keeping the existing bridge open to traffic. It is probably something we can work around, but just some additional information for you to consider. Let me know what you think as we are trying to get a layout complete with a profile so that we can get the ROW needs identified. If you have any questions, give me a call. Thanks and have a great day! Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com <mailto:matkins@tnp-online.com> www.tnp-online.com <http://www.tnp-online.com/>