Loading...
ST0502A-CS090515 Page 1 of 1 Keith Marvin - Freeport From:    "Mark Holliday" <mholliday@tnp-online.com> To:    "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date:    5/15/2009 12:13 PM Subject:    Freeport CC:    "Matt Atkins" <matkins@tnp-online.com>   Keith,   I wanted to follow up and summarize our conversation this week regarding the environmental work for Freeport.    1. The City will submit their standard documentation to THC for determination if an archeological survey of the project is warranted.  If the result of their evaluation does require the survey, then TNP can retain the services of a specialized subconsultant for these services.  2. TNP shall proceed with the additional environmental services outlined in the NCTCOG draft Environmental Review Checklist.  We will answer the checklist items pertaining to the civil design, and assemble the required documentation.  We will track our time on these services independently of the currently contracted work.  3. Upon completion of the checklist items relative to the civil design, TNP will solicit a proposal from a specialized subconsultant to complete the necessary additional evaluations, paperwork and NCTCOG coordination. 4. A portion of the NCTCOG checklist pertains to USACE 404 permitting and the determination of waters of the U.S.  This work is currently contracted under TNP’s existing Freeport agreement with the City.   Let me know if you have any clarifications.   Have a good weekend. Mark       Mark J. Holliday, P.E. Principal 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 main 214.461.9864 fax mholliday@tnp-online.com www.tnp-online.com     file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4A0D5C5CCity_...3/5/2010