Loading...
ST9905-CS080410010) Keith Marvin - Budget Letter Page 1 From: "MZortman" <MZortman @ecslimited.com> To: <kmarvin @ci.coppell.tx.us> CC: "RLancaster" <RLancaster @ecslimited.com> Date: 4/10/2008 5:38 PM Subject: Budget Letter Attachments: Budget Letter. pdf Good afternoon Keith, I have attached our budget summary letter for your review. If you should have any questions or comments, please do not hesitate to contact me. Thanks, Mark R. Zortman, P.E. President ECS- Texas, LLP 4950 Keller Springs Road Suite 480 Addison, Texas 75001 (972) 392 -3222 [Office] (972) 392 -0102 [Fax] (972) 872 -1382 [Cell] "Setting the Standard for Service" mzortman @ecslimited.com < mailto:mzortman @ecslimited.com> www.ecslimited.com <http: / /webmail.ecslimited.com /exchweb /bin /redir.asp ?U RL= http: / /www.ecsl imited.com /> The ECS Group of Companies 010) Keith Marvin - Budget Letter Page 2 ENR #96 Top Design Firm This message, including any attachment hereto, is confidential and proprietary. If you are not the named recipient, you are kindly requested to notify the sender immediately and to delete this message, including any attachment, from your system. you are not allowed to copy, use or maintain this message, and the contents hereof must not be disclosed to any other person. April 10, 2008 Mr. Keith Marvin, P.E. Project Engineer City of Coppell P.O. Box 9478 Coppell, Texas 75019 ECS Project No. 19:5061 Reference: Estimated Cost for Constriction Materials Testing, Bethel Road, Remaining Work, Coppell, Texas Dear Mr. Marvin: Based on our recent meeting we are providing an estimated cost for construction materials testing services in order to complete the Bethel Road project. Based on our current estimated cost contract with the City of Coppell, we estimated 160 total trips for construction materials testing for a fee of $44,654.50. Through March 30, 2008 ECS has been to the site 163 times and $6,646.29 remains left in the budget, indicating that we are under budget for our initial assumed construction schedule. However, almost half of the road remains to be constructed. Therefore, we are providing an estimated total cost (attached) based on the following assumptions: • Box Culvert concrete placements will occur in 200 foot sections. Four trips for each 5 foot by 10 foot culvert are anticipated to sample concrete for the slab -on- grade, each wall (2) and top slab. • Pavement concrete placements will consist of an average of 500 cubic yard concrete placements. If you have any questions with regard to the information presented in this letter, or if we can be of further assistance to you, please do not hesitate to contact us at (972) 392 -3222. Respectfully, ECS-TEXAS, LLP os Lancaster Project Manager Attachments: As Stated Mark R. Zortman, P.E. Principal Engineer 4950 Keller Springs Road, Suite 480, Addison, TX 75001 e PH (972) 392 -3222 . FAX (972) 392 -0102 - www.ecs- texas.com Dallas • Austin Estimated Cost BETHEL ROAD FIELD SERVICES $18,028.00 $0.15 $2,704.20 SUBTOTAL: $2,704.20 HOURSID kYj DAYS /WEEK WEEKS RATE I TOTAL Box Culvert Technician 3 2 20 $34.00 $4,080.00 Pavement Technician 6 2 6 $34.00 $2,448.00 Soil Technician 6 2 6 $34.00 $2,448.00 64 $18.00 $1,152.00 SUBTOTAL: $8,976,00 ENGINEERING & SUPPORT "'r " jupp 11 ` $18,028.00 $0.15 $2,704.20 SUBTOTAL: $2,704.20 LABORATORY TESTING IN UNITS RATE TOTAL Proctor Tests 2 $125.00 $250.00 Atterberg Limits 2 $45.00 $90.00 Nuke Gauge Fee 12 $30.00 $360.00 Cores for Thickness 10 $60.00 $600.00 Trip Charge 64 $18.00 $1,152.00 SUBTOTAL: $2,452.00 CONCRETE TESTING IM CYLS /DAY DAYSIWEEK WEEKS RATE TOTAL Box Culvert 6 2 20 $11.00 $2,640.00 Pavement 30 2 6 $11.00 $3,960.00 SUBTOTAL: $6,600.00 Estimated Total Cost for Remaining Work: $20,732.20 Amount Remaining in Current Contract: $6,646.29 Additional Estimated Cost for Remaining Work: $14,085.91 The estimated cost has been prepared for your budgeting purposes based upon the assumed quantities and time frames detailed above. Actual costs may be greater or Iess than the estimate and will be calculated using the enclosed schedule of unit rates.