Good afternoon Keith, I have attached our budget summary letter for your
review.
If you should have any questions or comments, please do not hesitate to
contact me.
Thanks,
Mark R. Zortman, P.E.
President
ECS- Texas, LLP
4950 Keller Springs Road
Suite 480
Addison, Texas 75001
(972) 392 -3222 [Office]
(972) 392 -0102 [Fax]
(972) 872 -1382 [Cell]
"Setting the Standard for Service"
mzortman @ecslimited.com < mailto:mzortman @ecslimited.com>
www.ecslimited.com
<http: / /webmail.ecslimited.com /exchweb /bin /redir.asp ?U RL= http: / /www.ecsl
imited.com />
The ECS Group of Companies
010) Keith Marvin - Budget Letter Page 2
ENR #96 Top Design Firm
This message, including any attachment hereto, is confidential and
proprietary. If you are not the named recipient, you are kindly
requested to notify the sender immediately and to delete this message,
including any attachment, from your system. you are not allowed to
copy, use or maintain this message, and the contents hereof must not
be disclosed to any other person.
April 10, 2008
Mr. Keith Marvin, P.E.
Project Engineer
City of Coppell
P.O. Box 9478
Coppell, Texas 75019
ECS Project No. 19:5061
Reference: Estimated Cost for Constriction Materials Testing, Bethel Road, Remaining Work,
Coppell, Texas
Dear Mr. Marvin:
Based on our recent meeting we are providing an estimated cost for construction materials testing
services in order to complete the Bethel Road project. Based on our current estimated cost contract
with the City of Coppell, we estimated 160 total trips for construction materials testing for a fee of
$44,654.50. Through March 30, 2008 ECS has been to the site 163 times and $6,646.29 remains left
in the budget, indicating that we are under budget for our initial assumed construction schedule.
However, almost half of the road remains to be constructed. Therefore, we are providing an estimated
total cost (attached) based on the following assumptions:
• Box Culvert concrete placements will occur in 200 foot sections. Four trips for each 5 foot by
10 foot culvert are anticipated to sample concrete for the slab -on- grade, each wall (2) and top
slab.
• Pavement concrete placements will consist of an average of 500 cubic yard concrete
placements.
If you have any questions with regard to the information presented in this letter, or if we can be of
further assistance to you, please do not hesitate to contact us at (972) 392 -3222.
Respectfully,
ECS-TEXAS, LLP
os Lancaster
Project Manager
Attachments: As Stated
Mark R. Zortman, P.E.
Principal Engineer
4950 Keller Springs Road, Suite 480, Addison, TX 75001 e PH (972) 392 -3222 . FAX (972) 392 -0102 - www.ecs- texas.com
Dallas • Austin
Estimated Cost
BETHEL ROAD
FIELD SERVICES
$18,028.00 $0.15
$2,704.20
SUBTOTAL:
$2,704.20
HOURSID kYj DAYS /WEEK
WEEKS
RATE I
TOTAL
Box Culvert Technician
3 2
20
$34.00
$4,080.00
Pavement Technician
6 2
6
$34.00
$2,448.00
Soil Technician
6 2
6
$34.00
$2,448.00
64 $18.00
$1,152.00
SUBTOTAL:
$8,976,00
ENGINEERING & SUPPORT
"'r " jupp 11 `
$18,028.00 $0.15
$2,704.20
SUBTOTAL:
$2,704.20
LABORATORY TESTING
IN UNITS RATE
TOTAL
Proctor Tests
2 $125.00
$250.00
Atterberg Limits
2 $45.00
$90.00
Nuke Gauge Fee
12 $30.00
$360.00
Cores for Thickness
10 $60.00
$600.00
Trip Charge
64 $18.00
$1,152.00
SUBTOTAL:
$2,452.00
CONCRETE TESTING
IM
CYLS /DAY DAYSIWEEK WEEKS RATE
TOTAL
Box Culvert
6 2 20 $11.00
$2,640.00
Pavement
30 2 6 $11.00
$3,960.00
SUBTOTAL:
$6,600.00
Estimated Total Cost for Remaining Work:
$20,732.20
Amount Remaining in Current Contract:
$6,646.29
Additional Estimated Cost for Remaining Work:
$14,085.91
The estimated cost has been prepared for your budgeting purposes based upon the assumed quantities
and time
frames detailed above. Actual costs
may be greater or Iess than the estimate and will be calculated
using the
enclosed schedule of unit rates.