Loading...
ST8702-CS 901120 GINN, INC. I [ .TING ENGINEERS November 20, 1990 Mr. Matthew Miller, P.E. Risk Studies Division Federal Insurance Administration Federal Emergency Management Agency 500 C Street, SW Washington, D.C. 20472 Re: Denton Tap Floodplain Revision Case No. 88-06-13R Dear Mr. Miller: On September 23, 1987, Mr. Wayne Ginn, P.E., acting as City Engineer for the city of Coppell, Texas, submitted a request for a Conditional Letter of Map Revision for Denton Tap Road bridge replacement. Accompanying this request was a report entitled Floodplain Hydraulics Study, Grapevine Creek, CopDell, Texas, dated September 22, 1987, prepared by Kimley-Horn and Associates, Inc. This Conditional Request was approved by letter of March 4, 1988, and construction began. We have now completed construction of the bridge and respectfully request that FEMA now issue a final Letter of Map Revision as per National Flood Insurance Program Regulations. In support of this request we have attached a study entitled Floodplain Hydraulics Study, Grapevine Creek, CopDell, Texas, As-Built Study of Denton TaD Road Bridge Replacement. We will be happy to provide any additional information as required, or you may contact Mr. Ron Morrison of Kimley-Horn and Associates for further information regarding the report. Sincerely, John C. Karlsruher, P.E. cc: Shohre Daneshmand, P.E. H. Wayne Ginn, P.E. File 378 17103 Preston Road · Suite I00 · LB II8 · Dallas, Texas75248 · Phone 214/248-4900