(3/9/2010) Keith Marvin - Re: Sandy Lake RoadPage 1
From: Keith Marvin
To:Holliday, Mark
CC:Atkins, Matt
Date: 12/4/2007 5:14 PM
Subject: Re: Sandy Lake Road
Mark,
Draft the modification using the 2004 one as an example. Get it to me when you can and I'll get it on a council agenda.
Thanks.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Mark Holliday" <mholliday@tnp-online.com> 12/4/2007 4:02 PM >>>
Keith,
Overall this amendment is not much different than the one in 2004 in
terms of its cost components, ie a similar time shift of labor costs and
a modified plan prep scope. I can put everything in whatever format you
prefer, but we see things breaking down as follows:
TxDOT Related Changes
1- meetings and corresp. w/ TxDOT representatives
2- preparation of Design Summary Report and related corresp.
3- Preparation of schematic per txdot standards and associated
modifications
4- Coordination with state's EA representative
5- Bridge design checklists, geo evaluation and scour analysis
6- Preparation of pavement design report
7- Additional standards sheets in plan set, ie traffic control,
bridge standards, signage/striping, details
8- Public meeting
9- Potential plan changes per DSR/schematic reviews
10- Separation of plans, bid docs, and administrative efforts into two
projects.
(3/9/2010) Keith Marvin - Re: Sandy Lake RoadPage 2
Time Shift
1- Limited update survey for current design and ROW/boundary
conditions.
2- Engineering design through 2008 and construction admin into
2009
3- LA / H&H / 404 work through 2008.
All total, this results in a $147,000 amendment. Give us a call to
discuss if you want, and we can work all this into a suitable format. I
have the one we did in 2004, and it was a letter w/ a 2-page
Modification to Scope of Services form.
Mark J. Holliday, P.E.
Principal
12160 North Abrams Road, Suite 508
Dallas, Texas 75243
214.461.9867 main
214.461.9864 fax
mholliday@tnp-online.com <mailto:mholliday@tnp-online.com>
www.tnp-online.com <http://www.tnp-online.com/>