Loading...
ST9902-CS071213010) Keith Marvin - FW: sandy lake rd Page 1 From: "Mark Holliday" <mholliday @tnp- on line. com> To: "Keith Marvin" <kmarvin @ci.coppell.tx.us> Date: 12/13/2007 5:48 PM Subject: FW: sandy lake rd Attachments: Document.pdf Keith, Attached is the Modification to Scope of Services for the Sandy Lake Contract. Mark - - - -- Original Message---- - From: MARK HOLLIDAY [mailto :mholliday @tnp- online.com] Sent: Thursday, December 13, 2007 5:33 PM To: Mark Holliday Subject: sandy lake rd Please open the attached document. This document was digitally sent to you using an HP Digital Sending device. For more information on HP MFP Digital Sending please visit http-//www.hp.com/go/HP—Digital_Sender-Module.com Civil Engineering Surveying Landscape Architecture Planning Kenneth M. Griffin, P.E. Director of Public Works and Engineering City of Coppell 255 Parkway P.O. Box 478 Coppell, Texas 75419 December 13, 2407 RE: WEST SANDY LAKE ROAD PROJECT ## ST 99 -02 (TNP Project Igo. CPL00243) Dear Ken: Per our discussions with Keith Marvin, we have prepared the attached amendment to our engineering services contract for the West Sandy Lake Road project. The amendment covers additional expenses and time associated with completing the project using federal funding received through the Texas Department of Transportation. As you know, TxDOT funded projects not only necessitate a greater amount of coordination with varying entities, but also requires additional effort related to the project management procedures, submittal reviews, design standards, construction plan preparation:, and project time. We appreciate your understanding of these issues, and your willingness to accept our amendment so that we may proceed with completing the rest of the project. As identified in the amendment, the project will be divided into two phases to maintain separation of the TxDOT funded portion of the project from the City funded portion. You will find enclosed a Modification to the Scope of Services for the referenced project in accordance with the applicable provisions of the Consulting Engineers Contract. Thank you for the opportunity to be of service to the City of Coppell, and we look forward to moving forward on this important project. Sincerely, TEAGUE NALL AND PERKINS, INC. Mark J. Holliday, P. E. xc, Keith Mervin, P.E. Matt Atkins, P.E. 12160 North Ahrarns Road, Suite 508 Dallas, Texas 75243 214.461.9867 phone 214.461.9864 fax www tap - online, corn CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services 1. Scope of Work TNP shall provide the following services as required to accommodate the use of federal funding received from the Texas Department of Transportation by the City of Coppell for a portion of the West Sandy Lake Road project. a) Additional meetings and correspondence with TxDOT representatives. b) Preparation of Design Summary Report and related follow -up correspondence. c) Preparation of scheanatic per TxDOT standards and associated resulting modifications. d) Coordination with TxDOT's environmental assessment consultant. e) Bridge design checklists and scour analysis. f) Preparation of pavement design report. g) Additional standards sheets in plan set, including traffic control, bridge standards, signagelstriping, and details. h) Potential plan changes per DSRlschematic reviews by TxDOT.. i) 'Limited survey for updated boundary analysis, ROW assessments, and development, j) Separation of plans, bid documents, and administrative efforts into two projects: Phase 2 TxDOT funded and Phase 3 City funded. k) Extension of time frame for all contractual elements through 2009. 11. Project Schedule The schedule will generally proceed as two separate projects as described below. Phase 2 (TxDOT Funded) — Coppell Road North to just west of Coppell Road South Preliminary Schematic February 2008 Finalize Schematic and ROW Dons MarchlApril 2008 Concept Design Plans August 2008 Preliminary Design Plans Januarys 2009 Final Design Plans June 2009 Phase 3 (City Funded) — Just west of Coppell Road South to Denton Tap Road Finalize Alignment and ROW Rocs March/April 2008 Preliminary Design Plans dune 2008 Final Design Plans September 2008 Ill. Compensation The Engineer shall be paid an additional lump sum fee for the above described Additional Scope of Services in an amount of One Hundred and Forty -seven Thousand, Six Hundred, and no/100 Dollars ($147,600). This amount includes the following increases: Engineering Design & Construction Services: Design Surveys: Property Surveys & ROW -Esmt. Documents: CLOMR: LO MR: Section 404 Permit Application TOTAL AGREED: THE CITY OF COPPELL By: Date: Attest; AGREEDIACCEPTED: $135,000 $2,500 $5,000 $1,700 $1,700 $ 1,700 $147,600 TEAGUE NALL AND PERKINS, INC. By: 1 Date: 7 Atte t: Page 2