Loading...
ST9902-CS071217Page 1 of 1 Keith Marvin -West Sandy Lake From: "Mark Holliday" <mholliday@tnp- online. com> To: "Keith Marvin" <kmarvin @ci.coppell.tx.us> Date: 12/17/2007 5:21 PM Subject: West Sandy Lake CC: "Matt Atkins" <matkins @tnp- online. com> Attachments: Document.pdf Keith, Attached is a revised amendment document per your comment about item h. Regarding the breakdown of fees, it makes the most sense to break the item list into groups of similar effort or reasons for the effort. So if you get questions, I would provide the following: Items a through d represents about 30% of the amount. Items a through h represents about 30% of the amount. Items i through k represents about 40% of the amount. Also, we are still trying to get a complete update on the Freeport survey, and will forward that to you tomorrow. Mark J. Holliday, P.E. Principal 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 main 214.461.9864 fax mholliday(c online.com www.tnr)- online.com file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4766B000City_of... 3/9/2010 CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services I. Scope of Work TNP shall provide the following services as required to accommodate the use of federal funding received from the Texas Department of Transportation by the City of Coppell for a portion of the West Sandy Lake Road project. a) Additional meetings and correspondence with TxDOT representatives. b) Preparation of Design Summary Report and related follow -up correspondence. c) Preparation of schematic per TxDOT standards and associated resulting modifications. d) Coordination with TxDOT's environmental assessment consultant. e) Bridge design checklists and scour analysis. f) Preparation of pavement design report. g) Additional standards sheets in plan set, including traffic control, bridge standards, signagefstriping, and details. h) Plan modifications per DSRlschematic reviews by TxDOT. i) Limited survey for updated boundary analysis, ROW assessments, and development. j) Separation of plans, bid documents, and administrative efforts into two projects: Phase 2 TxDOT funded and Phase 3 City funded. k) Extension of time frame for all contractual elements through 2009. II. Project Schedule The schedule will generally proceed as two separate projects as described below. Phase 2 (TxDOT Funded) - Coppell Road North to just west of Coppell Road South Preliminary Schematic February 2008 Finalize Schematic and ROW Does March/April 2008 Concept Design flans August 2008 Preliminary Design Plans January 2009 Final Design Plans June 2009 Phase 3 (City Funded) — Just west of Coppell Road South to Denton Tap Road Finalize Alignment and ROW Docs March/April 2408 Preliminary Design Plans June 20018 Final Design Plans September 2008 III. Compensation The Engineer shall be paid an additional lump scam fee for the above described Additional Scope of Services in an amount of One Hundred and Forty - seven Thousand, Six Hundred, and no1100 Dollars ($147,600). This amount includes the following increases: Engineering Design & Construction Services: $135,000 Design Surveys: $2,500 Property Surveys & ROW -Esmt. Documents: $5,000 CLOMR: $1,700 LO MR: $1,700 Section 404 Permit Application $1,7100 TOTAL $147,600 AGREED: THE CITY OF COPPELL By; Cate: Attest: AGREEDIACCEPTED: TEAGUE NALL AND PERKINS, INC. By: Date: Atte t: