Loading...
ST9902-CS080114010) Keith Marvin - RE: sandy lake rd Page 1 From: "Mark Holliday" <mholliday @tnp- on line. com> To: "Keith Marvin" <kmarvin @ci.coppell.tx.us> Date: 1/14/2008 1:52 PM Subject: RE: sandy lake rd Attachments: Document.pdf Good afternoon Keith. Attached is the traffic signal amendment for Whispering Hills. Let us know if you have questions. Mark - - - -- Original Message---- - From: Keith Marvin [ mailto: kmarvin @ci.coppell.tx. us] Sent: Wednesday, January 02, 2008 5:32 PM To: Mark Holliday Subject: RE: sandy lake rd Ok. Please write this up as a contract amendment. This amount will not need council approval, so we can have the City Manager sign it. Thanks. Keith Marvin, P.E. Project Engineer (972) 304 -3681 >>> "Mark Holliday" <mholliday @tnp- on line. com> 1/2/2008 3:04 PM >>> Keith, We got feedback from our sub, and there will not be any difference in fee for the four leg option. Mark - - - -- Original Message---- - From: Keith Marvin [ mailto: KMARVI N @ci.coppell.tx. us] Sent: Friday, December 21, 2007 10:01 PM To: Mark Holliday Subject: Re: sandy lake rd Mark, Does it make any difference if this signal evolves into a 4 legged installation? Keith Original Message - - - -- 010) Keith Marvin - RE: sandy lake rd Page 2 From: "Mark Holliday" <mholliday @tnp- on line. com> To: Keith Marvin <KMARVIN @ci.coppell.tx.us> Sent: 12/14/2007 2:05:16 PM Subject: RE: sandy lake rd Keith, To add plans for a signal at Whispering Hills will be $8,000. Let us know if you want us to proceed with putting that into a separate amendment format. Have a great weekend. Mark - - - -- Original Message---- - From: Mark Holliday Sent: Thursday, December 13, 2007 5:45 PM To: 'Keith Marvin' Subject: FW: sandy lake rd Keith, Attached is the Modification to Scope of Services for the Sandy Lake Contract. Mark - - - -- Original Message---- - From: MARK HOLLIDAY [mailto :mholliday @tnp- online.com] Sent: Thursday, December 13, 2007 5:33 PM To: Mark Holliday Subject: sandy lake rd Please open the attached document. This document was digitally sent to you using an HP Digital Sending device. For more information on HP MFP Digital Sending please visit http-//www.hp.com/go/HP—Digital_Sender-Module.com CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services 1. Scope of Work TNP shall provide professional traffic engineering services, as outlined below, for the preparation of design plans for a traffic signal installation at the intersection of Sandy Lake Road and Whispering Hills in the City of Coppell. The plans will be prepared according to and will meet the City of Coppell requirements and will be included with the roadway plans being prepared by TNP. This modification is for additional services associated with the existing contract to design four traffic signals along Sandy Lake Road. Previous and ongoing work being done under this existing contract will be utilized, including meeting information, specifications, and design standards. Generally, the work items below will be followed in preparing design plans, specifications, and cost estimate data: a) Gather data on the proposed configuration of the intersection and utilities in the area. b) Evaluate the intersection on site to confirm data, and identify pale foundation locations, power source and controller cabinet location. c) Prepare a preliminary signal design for review by the City. Recommended signal phasing will be developed based on lane configurations and field observations. d) Upon approval of preliminary layouts, prepare a complete set of Traffic Signal Design Plans for the construction of the proposed signal. Plans will conform with and utilize City of Coppell design standards. e) Plans sheets will be included in the overall construction plan set prepared by TNP. 11, Project schedule The work will generally proceed within the schedule for the project as described below. Phase 3 (City Funded) — Just west of Coppell Road South to Denton Tap Road Preliminary Design Plans June 2008 Final Design Plans September 2008 Ill. Compensation The Engineer shall be paid an additional lump sum fee for the above described Additional Scope of Services in an amount of Eight Thousand, and no1100 Dollars ($8,000). This amount includes the following increases: Engineering Design & Construction Services: $8,000 TOTAL $8,O00 AGREED: THE CITY OF COPPELL By: Date= AGREEDIACCEPTED; TEAGUE NALL AND PERKINS, INC. By: Date: qn L 2 2 Attest: Attest: Page 2