Loading...
ST9902-CS080123 (2) (3/9/2010) Keith Marvin - RE: Sandy Lake Road & Coppell Road SouthPage 1 From: "Matt Atkins" <matkins@tnp-online.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date: 1/23/2008 5:01 PM Subject: RE: Sandy Lake Road & Coppell Road South Keith, We are stopping short of that intersection with the TxDOT portion. We have it shown as beyond the limits of this phase. We have not made any major changes to that section since you last saw it. We are updating the bridge per our discussions with you and TxDOT to include T411 rails instead of the Coppell Standard. Other than that, most everything else is virtually the same, from a design standpoint. Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com www.tnp-online.com -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Wednesday, January 23, 2008 4:57 PM To: Matt Atkins Subject: RE: Sandy Lake Road & Coppell Road South Matt, As long as there have been no major changes since we saw the preliminary drawings we should be ok with it. We are not including the intersection of South Coppell Road with the TXDOT portion are we? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Matt Atkins" <matkins@tnp-online.com> 1/23/2008 4:47 PM >>> Keith, Sounds like we are on the same page! We will widen it out for the channelized turn lanes and make a nice smooth transition into their section. We should be ready to submit the schematic to you this week. Do you (3/9/2010) Keith Marvin - RE: Sandy Lake Road & Coppell Road SouthPage 2 want us to go ahead and submit to TxDOT as well to start their review timeline or wait until you look at it? I thought that if you had any major comments, we could revise and resubmit to TxDOT probably before they actually looked at the first submittal. We are open to either way you would prefer. Thanks and have a good evening! Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com www.tnp-online.com -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Wednesday, January 23, 2008 4:28 PM To: Matt Atkins Subject: Re: Sandy Lake Road & Coppell Road South Matt, The 34' section is what was selected for the South Coppell Road Project. Where you tie in should match that width. There will be some changes as we approach the intersection to accommodate the right turn lanes. Call me if we need to talk about it more. Thanks! Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Matt Atkins" <matkins@tnp-online.com> 1/23/2008 2:43 PM >>> Good Afternoon Keith, We are forging ahead on the Sandy Lake Road project and we have come across a discrepancy between what we show and what Huitt Zollars has shown. I don't believe it is anything big and probably a really easy fix, but I wanted to get your opinion for sure. Their section of Coppell Road South is designed at 34'B-B and we were showing a 37'B-B per the standard details. Do you want us to extend the 34' section all (3/9/2010) Keith Marvin - RE: Sandy Lake Road & Coppell Road SouthPage 3 the way to Sandy Lake? Thanks and have a great day! Matt Atkins, P.E. Project Manager 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 office 214.461.9864 fax matkins@tnp-online.com <mailto:matkins@tnp-online.com> www.tnp-online.com <http://www.tnp-online.com/>