March 11, 2010
Robert Beserra
San Saba Construction Services, Inc.
3100 Independence Pkwy, 311 MBN -314
Plano TX 75075
RE: Duke Lesley Addition, Infrastructure
Street Failure(s) on Dividend Drive/ Point West Blvd.
Dear Mr. Beserra:
Bond No. 46BCSE07205
The two -year term on the above referenced maintenance bond began on February 21, 2008, which
was the date of final acceptance of the project. For your information, I have been corresponding
with L.H. Lacey Company since July 29, 2009 regarding pavement failures in this development.
A periodic follow -up inspection of the facilities revealed pavement settling problems at various
locations, many of which are near and around fire hydrants installed by your company. My
previous letters have gone to Cyle Burchfield of L.H. Lacey, and I have spoken with Tod Feazell in
the field. It seems to be their contention that the settling is due to a problem with the fire hydrant
installation done in some locations by San Saba Construction.
Please contact me at the number below at your earliest convenience so we can discuss a possible
solution before your surety is contacted.
Sincerely
Larry/pavis
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Keith Flowers, Duke Construction, Fax: 972/361 -6800
Tod Feazell, L.H. Lacy Construction Company, Ltd.
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673