Loading...
Duke Lesley-CS100311T H E • C 1 T Y O F COFFELL w i X A s � 8 March 11, 2010 Robert Beserra San Saba Construction Services, Inc. 3100 Independence Pkwy, 311 MBN -314 Plano TX 75075 RE: Duke Lesley Addition, Infrastructure Street Failure(s) on Dividend Drive/ Point West Blvd. Dear Mr. Beserra: Bond No. 46BCSE07205 The two -year term on the above referenced maintenance bond began on February 21, 2008, which was the date of final acceptance of the project. For your information, I have been corresponding with L.H. Lacey Company since July 29, 2009 regarding pavement failures in this development. A periodic follow -up inspection of the facilities revealed pavement settling problems at various locations, many of which are near and around fire hydrants installed by your company. My previous letters have gone to Cyle Burchfield of L.H. Lacey, and I have spoken with Tod Feazell in the field. It seems to be their contention that the settling is due to a problem with the fire hydrant installation done in some locations by San Saba Construction. Please contact me at the number below at your earliest convenience so we can discuss a possible solution before your surety is contacted. Sincerely Larry/pavis Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Keith Flowers, Duke Construction, Fax: 972/361 -6800 Tod Feazell, L.H. Lacy Construction Company, Ltd. 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673